Third Notice | | 8/7/2010 | 8/13/2010 | | DONE |
|
|
|
|
Second Notice | | 7/26/2010 | 8/2/2010 | | DONE |
|
|
|
|
First Notice | | 6/28/2010 | 7/16/2010 | | DONE |
|
|
|
|
FIRE-Final Inspection | 6/18/2010 | 6/18/2010 | 6/18/2010 | P | PASS |
Forrest France
|
|
|
Correction items finished, re-inspection passed. Life safety final approved.
|
BLD-Final | 6/17/2010 | 6/18/2010 | 6/18/2010 | P | PASS |
Jim Storey
|
|
|
PATRICK Phone #: ###-####
|
FIRE-Final Inspection | 6/17/2010 | 6/18/2010 | 6/18/2010 | A | FAIL |
Forrest France
|
|
|
Missing suite address numbers, incorrect sample tube has been installed at the duct smoke detector, provide approved test method for the HVAC DD.
|
Permanent Occupancy | | | 6/18/2010 | | DONE |
Tisha Gallop
|
|
|
|
Print Occupancy Form | | | 6/17/2010 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 6/15/2010 | 6/16/2010 | 6/16/2010 | A | PART |
Jim Storey
|
|
|
patrick - suspended ceiling Phone #: ###-#### need wire support on supply defussers.
|
(F) Reprint permit | | | 6/15/2010 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 5/12/2010 | 5/13/2010 | 5/13/2010 | P | PASS |
Jim Storey
|
|
|
patrick Phone #: ###-####
|
Issue PAID IN FULL permit | | | 4/16/2010 | | DONE |
|
|
|
|
OVERRIDE | | | 4/14/2010 | | |
|
|
|
|
Telephone call | | | 4/14/2010 | | DONE |
Barbara Stitt
|
|
|
Called Joe Thompson and told him permit is ready, fees due, need GC and GC # and RP @ 9:45am on 4-14-10 BAS
|
Permit Ready to Issue | | | 4/14/2010 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (TLW) | 3/29/2010 | | 4/13/2010 | | PASS |
Tim L. Woodard
|
|
|
4/13/2010 13:09:35 TLW - activity updated through activity BLDA022 from case BLD10-00645.
|
Routing - PLAN CHECK | 4/12/2010 | | 4/13/2010 | | PASS |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/13/2010 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 4/13/2010 | | DONE |
Barbara Stitt
|
|
|
|
Plan resubmittals received | | | 4/12/2010 | | DONE |
|
|
|
received 1 transmittal, 2 comments,and 3 copies of sheets P1.1, P2.1 taken to Tim Woodard
|
Routing - PLUMBING | 4/12/2010 | | 4/12/2010 | | PASS |
Bill VanDegrift
|
|
|
per resubmitted plans dated 4/12/10 and 2003 upc
|
Routing - PLAN CHECK | 4/5/2010 | | 4/8/2010 | | PASS |
Tim L. Woodard
|
|
|
approved with redlines.
|
Routing - FIRE | | | 4/8/2010 | | PASS |
Tim L. Woodard
|
|
|
Field Verify
|
1st review completed | | | 4/8/2010 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - Erosion and Sediment | 4/8/2010 | | 4/8/2010 | | PASS |
Tim L. Woodard
|
|
|
Approved waiver, applicant must comply with all attached conditions. TLW
|
Routing - PLAN CHECK | 4/1/2010 | | 4/5/2010 | | PEND |
Tim L. Woodard
|
|
|
sent to plumbing for review. TLW
|
Routing - PLUMBING | 4/5/2010 | | 4/5/2010 | | FAIL |
Bill VanDegrift
|
|
|
Idaho state code 07.02.06.011.20- all kitchen equipment and fixtures except hand sinks must be indirectly wasted. see #12 and #27 on the kitchen equipment schedule. 120 deg. max ho water to hand sinks. additional cross connection protection may be required. add floor sinks at the prep sink and rinse sink and resubmit.
|
Routing - PUBLIC WORKS | 3/29/2010 | | 4/1/2010 | | PASS |
Beverly Mountain
|
|
|
|
Routing PW Environmental | 4/1/2010 | | 4/1/2010 | | PASS |
Walt Baumgartner
|
|
|
Shell&Core installed segragated grease line. This space all kitchen drainage incl floordrain, mop sink route to grease line. Minimal menu planned. New owner Tracy Nye ###-####
|
Routing PW Sewer Design | 4/1/2010 | | 4/1/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 3/30/2010 | | 3/30/2010 | | PASS |
April Wing
|
|
|
|
Application received | | 3/29/2010 | 3/29/2010 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/29/2010 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/29/2010 | | DONE |
Tisha Gallop
|
|
|
|