MISC ACTIONS | | | 9/13/2010 | | DONE |
Tisha Gallop
|
|
|
Per Lisa/Radix Const, send final values statement to Mark Cleverly/TOK
|
Third Notice | | 9/14/2010 | 8/31/2010 | | DONE |
|
|
|
|
Third Notice | | 8/17/2010 | 8/31/2010 | | DONE |
|
|
|
faxed
|
Second Notice | | 8/12/2010 | 8/12/2010 | | DONE |
|
|
|
|
First Notice | | 7/25/2010 | 8/2/2010 | | DONE |
|
|
|
|
Permanent Occupancy | | | 7/15/2010 | | DONE |
|
|
|
|
BLD-Final | 7/8/2010 | 7/9/2010 | 7/9/2010 | P | PASS |
Tom Arcoraci
|
|
|
Matt Phone #: ###-####
|
FIRE-Final Inspection | 7/8/2010 | 7/9/2010 | 7/9/2010 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Supply Line Hydro | 7/8/2010 | 7/9/2010 | 7/9/2010 | A | CANC |
Troy Cobbley
|
|
|
Wrong inspection type called in.
|
FIRE-Conference | 7/8/2010 | 7/8/2010 | 7/8/2010 | P | FAIL |
Troy Cobbley
|
|
|
All life safety items are ok but the equipment installers are removing the sheetrock that was just installed to cover the exposed wood above the ceilings. The project needs re-inspected after this equipment installation to verify that the wood has been re-covered.
|
BLD-Framing/Rough-in | 5/27/2010 | 5/27/2010 | 6/2/2010 | P | PASS |
Tom Arcoraci
|
|
|
matt - ceiling grid Phone #: ###-####
|
BLD-Framing/Rough-in | 4/29/2010 | 4/30/2010 | 4/30/2010 | A | PASS |
Mike Jordan
|
|
|
matt Phone #: ###-####. Interior steel stud framed walls only. No grid.
|
Issue PAID IN FULL permit | | | 4/7/2010 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (SRZ) | 4/2/2010 | 4/2/2010 | 4/5/2010 | | PASS |
Sam Zahorka
|
|
|
4/5/2010 14:37:57 SRZ - activity updated through activity BLDA022 from case BLD10-00660.
|
Routing - PLAN CHECK | 4/1/2010 | | 4/5/2010 | | PASS |
Sam Zahorka
|
|
|
|
Routing - FIRE | 4/5/2010 | | 4/5/2010 | | PASS |
Sam Zahorka
|
|
|
Verify in field.
|
1st review completed | | | 4/5/2010 | | DONE |
Sam Zahorka
|
|
|
|
Case Summary (BLD) | | | 4/5/2010 | | DONE |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/5/2010 | | DONE |
Sam Zahorka
|
|
|
|
Print Occupancy Form | | | 4/5/2010 | | DONE |
|
|
|
|
Telephone call | | | 4/5/2010 | | DONE |
Patricia Smith
|
|
|
left vm for matt at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 4/5/2010 | | DONE |
|
|
|
|
Plan assigned to (CDM) | 3/30/2010 | 3/30/2010 | 4/2/2010 | | DEFR |
Carl D Madsen
|
|
|
Assigned to SRZ
|
Routing - PLUMBING | 4/2/2010 | | 4/2/2010 | | PASS |
Bill VanDegrift
|
|
|
provid compressor intake and vacuum exhaust per NFPA 99C.
|
Routing - PUBLIC WORKS | 3/30/2010 | | 4/1/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Sewer Rating | 4/1/2010 | | 4/1/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 3/31/2010 | | 3/31/2010 | | PASS |
April Wing
|
|
|
|
Application received | | 3/30/2010 | 3/30/2010 | | DONE |
Darla L Downs
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/30/2010 | | DONE |
Darla L Downs
|
|
|
ok per Carl M to take in as a level 2
|
Recd Pcfee & Taken To Pln CK | | | 3/30/2010 | | DONE |
Darla L Downs
|
|
|
|