BLD-Final | 4/27/2010 | 4/28/2010 | 4/28/2010 | A | PASS |
Mike Jordan
|
|
|
Craig Phone #: ###-####. All items have been corrected. Ok for perm. occupancy.
|
Permanent Occupancy | | | 4/28/2010 | | DONE |
Tisha Gallop
|
|
|
|
FIRE-Final Inspection | 4/27/2010 | 4/27/2010 | 4/27/2010 | P | PASS |
Forrest France
|
|
|
Noted corrections field verified for compliance, life safety passed.
|
BLD-Final | 4/22/2010 | 4/22/2010 | 4/22/2010 | P | PART |
Mike Jordan
|
|
|
please call 30 min prior to meet, wants temp occ.//Mike Erkmann Phone #: ###-####. Ok for temp. occ. Spoke with Bob Archibald regarding panic hardware for conferance room doors. Bob noted to have tenant remove doors until panic hardware arrived. Doors were removed while on site. Tenant to reschedule final when panic hardware has been installed.
|
FIRE-Final Inspection | 4/22/2010 | 4/22/2010 | 4/22/2010 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with scotts permission until the panic hardware on both of the doors as marked on the plans has been installed. The other condition is that the accordian divider that separates the conference room is to remain shut.
|
BLD-Final | 4/14/2010 | 4/14/2010 | 4/14/2010 | P | NR |
Mike Jordan
|
|
|
Craig Phone #: ###-####. Life/safety failed.
|
FIRE-Final Inspection | 4/14/2010 | 4/14/2010 | 4/14/2010 | P | FAIL |
Troy Cobbley
|
|
|
Provide occupant load signs for each of the two conference room that is separated by the folding wall, provide panic hardware on the west most door on the conference room and provide panic hardware on the exterior exit door in Hall 118 (as marked on the plans) also repair the existing exit signs and emergency lights.
|
Issue PAID IN FULL permit | | | 4/14/2010 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 4/8/2010 | | 4/13/2010 | | PASS |
Tim L. Woodard
|
|
|
4/13/2010 11:16:57 TLW - activity updated through activity BLDA022 from case BLD10-00733.
|
Routing - PLAN CHECK | 4/8/2010 | | 4/13/2010 | | PASS |
Tim L. Woodard
|
|
|
|
1st review completed | | | 4/13/2010 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/13/2010 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 4/13/2010 | | DONE |
Tim L. Woodard
|
|
|
|
Permit Ready to Issue | | | 4/13/2010 | | DONE |
Barbara Stitt
|
|
|
|
Print Occupancy Form | | | 4/13/2010 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 4/13/2010 | | DONE |
Barbara Stitt
|
|
|
Called Craig and told him that permit is ready///4-13-10 @ 2:25pm BAS
|
Plans ACCEPTED BY PLAN TECH | | | 4/8/2010 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Application received | | 4/7/2010 | 4/7/2010 | | DONE |
Alexandra L. DeYoung
|
|
|
|