Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD10-00735
StatusFinaled
Name JACK IN THE BOX INC
Site Address 1124 S VISTA AVE
Project NameJack In the Box
Customer Number 
ePlanReviewNo
Description
Jack in the Box Restaurant - To construct a new 2,325 square foot, one story, wood framed, fast food restaurant with drive-thru and outdoor seating. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
MISC ACTIONS  5/19/2011 DONE
DetailsTisha Gallop
per Stacie at K2 const. send invoice for final values to Jack In the Box attn: Chris Smith, 604 Oaksdale Ave. SW suite 103, Renton, WA 98055.
Third Notice 5/11/20114/28/2011 DONE
Third Notice 4/5/20114/27/2011 DONE
faxed to K2 Const
Second Notice 3/28/20113/31/2011 DONE
DetailsChristina Prado
Faxed 3-31-11
First Notice 3/5/20113/18/2011 DONE
BLD-Final2/23/20112/23/20112/23/2011PPASS
DetailsJim Storey
final ok no card ok site.
Zoning Approval2/23/20112/23/20112/23/2011 PASS
DetailsJosh Wilson
Landscaping has been completed and ok for final occupancy.
Permanent Occupancy  2/23/2011 DONE
FIRE-Final Inspection12/29/201012/30/201012/30/2010APASS
DetailsForrest France
Fire life safety finaled.
Temporary Occupancy12/30/20103/30/201112/30/2010 DONE
DetailsChristina Prado
Needs to complete landscaping to get permanent C of O
Zoning Approval Temp12/30/201012/30/201012/30/2010 PASS
DetailsJosh Wilson
Bond has been submitted for incomplete landscaping.
FIRE-Final Inspection12/29/201012/29/201012/29/2010PPASS
DetailsForrest France
Correction items finished. Fire life safety finaled.
BLD-Final12/29/201012/29/201012/29/2010PPART
DetailsJim Storey
temp occ. ok pending P&z bond to sign off.
FIRE-Final Inspection12/28/201012/28/201012/28/2010PFAIL
DetailsForrest France
Duct detector at the north side RTU failed to shut the unit down upon smoke head activation. Correction items per review note items 5 and 7 are satisfactory.
FIRE-Conference12/27/201012/27/201012/28/2010PDONE
DetailsForrest France
Regarding fire code review note item # 28.
BLD-Final12/22/201012/23/201012/23/2010APART
DetailsJim Storey
julio - Phone #: ###-#### pending fire
BLD-Final12/20/201012/22/201012/22/2010ANR
DetailsJim Storey
julio - Phone #: ###-#### pending ele
BLD-Final12/20/201012/21/201012/21/2010PPART
DetailsJim Storey
FIRE-Final Inspection12/20/201012/21/201012/21/2010AFAIL
DetailsForrest France
See fire code review notes item numbers 5, 7 and 28 for details on issues remaining.
FIRE-Conference12/20/201012/20/201012/20/2010ADONE
DetailsForrest France
Regarding project finals.
BLD-Final12/9/201012/20/201012/20/2010PNR
DetailsJim Storey
julio Phone #: ###-####
FIRE-Final Inspection12/9/201012/15/201012/15/2010APART
DetailsForrest France
Conference regarding project schedule.
PubWorks Occupancy Approval12/15/201012/15/201012/15/2010 DONE
DetailsTiffany Lowery
BLD-Other12/2/201012/3/201012/3/2010APASS
DetailsJim Storey
julio - ceiling grid for cover Phone #: ###-####
BLD-Other11/23/201011/29/201011/29/2010APART
DetailsMike Jordan
Julio Phone #: ###-####,, grid. Needs to add wires to diffusers.
BLD-Other11/23/201011/23/201011/23/2010PPART
DetailsTony Young
Julio Phone #: ###-####,, need trades 1st,, work in progress,, ok to fill border tiles
BLD-Conference11/5/201011/5/201011/5/2010PPASS
DetailsJim Storey
ceiling grid conf. Phone #: ###-####
BLD-Energy code compliance11/5/201011/5/201011/5/2010PPART
DetailsJim Storey
ceiling grid conf. Phone #: ###-####
BLD-Energy code compliance10/20/201010/20/201010/20/2010PPART
DetailsJim Storey
exterio walls around walk in cooller ok to cover.
BLD-Conference10/18/201010/18/201010/18/2010PPART
DetailsJim Storey
BLD-Conference10/18/201010/18/201010/18/2010APART
DetailsJim Storey
need rfi to address insulation levels aplacation in roor deck.
BLD-Framing/Rough-in10/13/201010/14/201010/14/2010APASS
DetailsJim Storey
julio Phone #: ###-####
BLD-Framing/Rough-in10/5/201010/6/201010/6/2010APASS
DetailsJim Storey
Julio ###-#### draft stop ok/ roof nailling ok/
BLD-Other9/30/20109/30/20109/30/2010PPART
DetailsJim Storey
Hardware simpson inspection please-Julio Phone #: ###-#### walls ok
BLD-Conference9/14/20109/14/20109/14/2010PPASS
DetailsJim Storey
Issue PAID IN FULL permit  7/26/2010  
Plan assigned to (JCM)4/7/2010 6/11/2010 PASS
DetailsJohn Menard
6/11/2010 08:54:02 JCM - activity updated through activity BLDA022 from case BLD10-00735.
Routing - PLAN CHECK6/10/2010 6/11/2010 PASS
DetailsJohn Menard
PLANS/APPL TAKEN TO FRONT DESK  6/11/2010 DONE
DetailsJohn Menard
Print Occupancy Form  6/11/2010 DONE
Telephone call  6/11/2010 DONE
t/c w karen at ###-#### - permit ready and fees given - also need gc name, rce#, rp and ACHD receipt
Permit Ready to Issue  6/11/2010 DONE
Details
Routing - PLAN CHECK5/27/2010 6/10/2010  
DetailsJohn Menard
Routing - PLANNING6/10/2010 6/10/2010 PASS
DetailsJosh Wilson
Agreement with Vista Village for trash enclosure location must be sunmitted prior to occupancy
Plan Reviewer's activity  6/9/2010 PASS
DetailsJohn Menard
Reviewed and approved structural and nonstructural revisions. JCM
Plan resubmittals received  6/8/2010  
received 1 structural review response letter,3 revised structural calcs,3 revised structural sheets S1.0,S2.0,S3.0,S4.1,S5.0,S5.1,SP2.0, 1building review resopnse letter ( one from Stantec and one from Robison Engineering) 1 walk in manufacture letter,2 revised lighting calcs,2 copies of sheets TS1.0,SD1.0,SD2.2,A1.0,A4.1,A6.1,A7.0,A9.0,A9.2,A9.3,ID1.1,ID4.1,P2.0,P3.1,P4.0,M1.0,M4.0,ES1.0,E1.0,E6.1,T-CK-1,K1.0,K2.1,K3.0,K3.1,SP1.2 and SP1.3 taken to John Menard
Routing - Erosion and Sediment5/25/2010 5/26/2010 PASS
DetailsClint A Smith
ESC10-00283 plan approved per the attached conditions.
Routing - PLAN CHECK5/21/2010 5/25/2010  
DetailsJohn Menard
Routing - PLANNING5/20/2010 5/21/2010 FAIL
DetailsJosh Wilson
Trash enclosure agreement from Vista Village property owner not received
Routing - PUBLIC WORKS5/10/2010 5/20/2010 PASS
DetailsBeverly Mountain
Routing PW Drainage5/10/2010 5/20/2010 PASS
DetailsBrian Murphy
Routing - PLAN CHECK4/29/2010 5/10/2010  
DetailsJohn Menard
Route to Impact Fee Review4/28/20105/3/20105/4/2010 PASS
DetailsCindy M. Gould
Routing - FIRE4/28/20104/28/20104/29/2010 PASS
DetailsScott Arellano
Passed see attached report
1st review completed  4/29/2010 DONE
Failed - Esc, Plan Check, and Planing
Plan resubmittals requested  4/28/2010 DONE
DetailsJohn Menard
E-mailed the architect a copy of the plan review requesting revisions. JCM
Plan resubmittals requested  4/28/2010 DONE
DetailsJohn Menard
E-mailed the architect a copy of the structural review requesting revisions. JCM
Routing - PLAN CHECK4/22/2010 4/28/2010 FAIL
DetailsJohn Menard
(F) Reprint permit  4/26/2010 DONE
Routing - PLANNING4/19/2010 4/22/2010 FAIL
DetailsJosh Wilson
Conditions of DRH09-00294 and CUP09-00087 not met. Architect contacted 4/22/10.
Routing - PLUMBING4/16/2010 4/19/2010 PASS
DetailsBill VanDegrift
vent indirect waste receptors at domestic and irrigation backflow preventers. R.P. will be required upstream of filter.
Routing - Erosion and Sediment4/15/2010 4/16/2010 FAIL
DetailsSteven Webb
ESC10-00283: Per BCC 8-17 plan failed due to deficiencies which are outlined in the Plan Review Checklist. The checklist was faxed to the applicant and also to the designer, (TerraForma). Re-submittal (2 copies) are needed. Plans must be prepared by a Boise City Certified Plan Designer.
Routing - PUBLIC WORKS4/8/2010 4/15/2010 FAIL
DetailsConnie Baumgartner
Failed by Brian Murphy, contact at ###-####
Routing PW Sewer Rating4/14/2010 4/15/2010 PASS
DetailsConnie Baumgartner
Routing PW Drainage4/9/2010 4/14/2010 FAIL
DetailsBrian Murphy
BED SIZED 25 YEAR STORM,SHORT CIRCUIT POSSIBLE. BRIAN MURPHY ###-####
Routing PW Street Lights  4/14/2010 PASS
DetailsHank Alarcon
Routing PW Solid Waste4/14/2010 4/14/2010 PASS
DetailsPeter J. McCullough
Routing - Addressing4/8/2010 4/8/2010 PASS
DetailsApril Wing
Plans ACCEPTED BY PLAN TECH  4/8/2010 DONE
Routing - PLANNING Land Div4/8/2010 4/8/2010 PASS
DetailsDave Abo
Parcel "E" on ROS 6868.
Pending Assignment by JCM4/7/2010 4/7/2010 DONE
DetailsJohn Menard
Application received 4/7/2010