Second Notice | | 7/26/2010 | 8/2/2010 | | DONE |
|
|
|
|
First Notice | 7/7/2010 | 7/7/2010 | 7/16/2010 | | DONE |
Dave Hannah
|
|
|
|
BLD-Final | 7/2/2010 | 7/6/2010 | 7/7/2010 | P | PASS |
Dave Hannah
|
|
|
Ben Phone #: ###-####
|
DOC - Permit Finaled | 7/7/2010 | 7/7/2010 | 7/7/2010 | A | PASS |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 7/2/2010 | 7/6/2010 | 7/6/2010 | A | PASS |
Forrest France
|
|
|
Scope of work completed. Fire life safety passed.
|
FIRE-Final Inspection | 7/2/2010 | 7/2/2010 | 7/2/2010 | A | NR |
Forrest France
|
|
|
North half of the project is not yet finished.
|
FIRE-Conference | 5/18/2010 | 5/18/2010 | 5/18/2010 | P | DONE |
Forrest France
|
|
|
Regarding site work in progress.
|
FIRE-Conference | 5/5/2010 | 5/5/2010 | 5/5/2010 | P | DONE |
Forrest France
|
|
|
On site visit to determine status of project related fire sprinkler work to be completed per scope of building permit. Discussion with contractor on site regarding construction underway, system impairment, code requirements, permit application and stop work order if conditions are not met.
|
Meeting | | | 5/5/2010 | | DONE |
Scott Arellano
|
|
|
Met with Angie Brosious regarding the related fire sprinkler work necessary for the proposed tenant improvement. At the time of our meeting, a fire sprinkler permit application had not been submitted to the building division for this project. I contacted the PDS/Fire division inspector and instructed him to stop by the project site and inform the permit holder that the permitted building permit scope of work included conditions which require the modification to the fire sprinkler system; and that required fire sprinkler modifications shall be performed by a licensed fire sprinkler contractor under a seperate fire sprinkler permit.
|
Routing PW Sewer Rating | 4/19/2010 | | 4/19/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PUBLIC WORKS | 4/19/2010 | | 4/19/2010 | | PASS |
Beverly Mountain
|
|
|
|
Issue PAID IN FULL permit | | | 4/16/2010 | | DONE |
|
|
|
|
Routing - Addressing | 4/16/2010 | | 4/16/2010 | | PASS |
April Wing
|
|
|
|
Routing - PLAN CHECK | 4/12/2010 | | 4/15/2010 | | PASS |
Tim L. Woodard
|
|
|
approved with Note in the case summary. TLW
|
Plan assigned to (TLW) | 4/12/2010 | | 4/15/2010 | | PASS |
Tim L. Woodard
|
|
|
4/15/2010 11:36:46 TLW - activity updated through activity BLDA022 from case BLD10-00763.
|
Routing - FIRE | | | 4/15/2010 | | PASS |
Tim L. Woodard
|
|
|
Field Verify
|
1st review completed | | | 4/15/2010 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/15/2010 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 4/15/2010 | | DONE |
Tim L. Woodard
|
|
|
|
Inspection Record Card- Bld | | | 4/15/2010 | | DONE |
|
|
|
|
Telephone call | | | 4/15/2010 | | DONE |
|
|
|
left vm for larry sundell at ###-#### - permit ready and fees given - also need gc name and rce#
|
Permit Ready to Issue | | | 4/15/2010 | | DONE |
|
|
|
|
Application received | | 4/12/2010 | 4/12/2010 | | DONE |
Darla L Downs
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/12/2010 | | DONE |
|
|
|
ok per Tim Woodard to take in as a level 1
|
Recd Pcfee & Taken To Pln CK | | | 4/12/2010 | | DONE |
|
|
|
|