Plan Reviewer's activity | | | 2/28/2011 | | DONE |
Sam Zahorka
|
|
|
Recieved letter of intent from the owner Randy Couch to remove the patio cover A.S.A.P. and obtain approvals from planning and the Fire department for a future Temporary Structure. The letter is attached to this permit under documents. SRZ
|
Telephone call | | | 2/28/2011 | | DONE |
Sam Zahorka
|
|
|
Called the owner of the Big Bun Drive In Randy Couch. I thanked him for his letter of intent. He stated he would remove the patio cover and re-apply for a temporary structure next Fall. I gave him the telephone numbers for the Fire Department and Planning and Zoning. SRZ
|
Telephone call | | | 2/25/2011 | | DONE |
Sam Zahorka
|
|
|
I left a message with Randy to discuss the email Bill Matter sent me. Matter architecture is not willing to be invlolved in the modification permits. I wanted to discuss the Code issues with Randy specifically Energy compliance and structural capabilities of the roof to carry a roof live load of 25 psf. Waiting for a returned telephone call.
|
Meeting | | | 2/23/2011 | | DONE |
Sam Zahorka
|
|
|
Meeting with Randy the owner of Big Bun and Andrea Tuning w/ Planning and Zoning. Explained the process to obtain a Major Tenant Improvement Permit for the addition he completed without permits. Andrea also explained the Zoning process. I suggested he hire an architect. He stated he was going to get with an architect and start his zonning approval proccess.
|
Telephone call | | | 2/17/2011 | | DONE |
Sam Zahorka
|
|
|
Recieved telephone call from Jerry McAdams the Fire Inspector. He stated the deck/patio area is covered with a canopy and has gas heat plummed to it. He did not think it was a temporary structure and thought it was regulated by the building department. I let him know that the structure was not approved for a roof and that a Building inspector would investigate. SRZ
|
Telephone call | | | 2/17/2011 | | DONE |
Sam Zahorka
|
|
|
The Building inspector called and let me know he issued a violation notice and the owner would contact me. SRZ
|
Telephone call | | | 2/17/2011 | | DONE |
Sam Zahorka
|
|
|
Recieived a telephone call from the owner Randy. I let him know he needs to obtain a building permit for the alterations/addition to his patio area. I offered to meet with him to go over the permitting process. I let him know drawings showing the new work are needed in order to obtain his permit. I also requested information about the mechanical and electrical alterations. He stated he would get started on producing the applications and construction documents for approvals. I offered my direct line for future assistance. SRZ
|
Third Notice | | 11/8/2010 | 11/3/2010 | | DONE |
|
|
|
|
Third Notice | | 10/12/2010 | 10/25/2010 | | DONE |
|
|
|
faxed to GC(River City) and Arch (Bill Matter)
|
Second Notice | | 9/19/2010 | 10/7/2010 | | DONE |
|
|
|
|
First Notice | | 8/30/2010 | 9/9/2010 | | DONE |
|
|
|
|
BLD-Final | 8/19/2010 | 8/20/2010 | 8/20/2010 | P | PASS |
Tom Arcoraci
|
|
|
DON Phone #: ###-####
|
Zoning Approval | 8/20/2010 | 8/20/2010 | 8/20/2010 | | DONE |
Andrea Tuning
|
|
|
|
DOC - Permit Finaled | | | 8/20/2010 | | DONE |
|
|
|
|
Permanent Occupancy | | | 8/20/2010 | | DONE |
|
|
|
|
BLD-Aging Inspection | 8/17/2010 | 8/17/2010 | 8/17/2010 | | NR |
Tom Arcoraci
|
|
|
|
Plan assigned to (SRZ) | 7/21/2010 | 7/21/2010 | 8/16/2010 | | PASS |
Sam Zahorka
|
|
|
8/16/2010 10:05:08 SRZ - activity updated through activity BLDA022 from case BLD10-00853.
|
Routing - PLANNING | 8/16/2010 | | 8/16/2010 | | PASS |
Andrea Tuning
|
|
|
|
Routing - PLAN CHECK | 8/16/2010 | | 8/16/2010 | | PASS |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/16/2010 | | DONE |
Sam Zahorka
|
|
|
|
Case Summary (BLD) | | | 8/16/2010 | | DONE |
Sam Zahorka
|
|
|
|
Telephone call | | | 8/16/2010 | | DONE |
|
|
|
left message w liz for bill at ###-#### - permit (plan mod) ready and fees given
|
Permit Ready to Issue | | | 8/16/2010 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/16/2010 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 8/16/2010 | | DONE |
Tisha Gallop
|
|
|
picked up and paid for plan mod
|
Plan Reviewer's activity | | | 8/13/2010 | | DONE |
Sam Zahorka
|
|
|
Inserted new sheet A1. Plan modification issuance pending Planning approval.
|
Plan resubmittals received | | | 8/11/2010 | | DONE |
Tisha Gallop
|
|
|
received transmittal and two coipes of sheet A1(record drawing) and two copies of sheet A1; taken to Sam Zahorka
|
Case Summary (BLD) | | | 7/26/2010 | | DONE |
|
|
|
|
Telephone call | | | 7/26/2010 | | DONE |
Sam Zahorka
|
|
|
Received telephone call from planner stating construction is going on prior to approvals. Code Enforcement contacted. SRZ
|
Routing - PLANNING | 7/22/2010 | | 7/23/2010 | | FAIL |
Andrea Tuning
|
|
|
The applicant does not have a Design Review approval for the modifications at this time.
|
Routing - PLAN CHECK | 7/22/2010 | | 7/22/2010 | | PEND |
Sam Zahorka
|
|
|
Plan modification issuance pending Planning DR modification application. Routed plans to Planning/Land Division.
|
Plan Modification Accepted | | | 7/21/2010 | | DONE |
Tisha Gallop
|
|
|
Plan Modification accepted for Bld10-00853 (Big Bun) to substitute white vinyl fence at perimeter of deck with wood framed decorative (checkerboard) Dibond panels. Panels are attached to wood posts extending up to 8'10" with horizontal decorative "box beam" band at top of treated 6x6 posts; submitted on revised certificate of value (increase $3,000 prj value), structural calcs, and plan sheets A1 and sheet 1; routed to Sam Zahorka.
|
BLD-Framing/Rough-in | 6/10/2010 | 6/10/2010 | 6/10/2010 | P | PASS |
Tom Arcoraci
|
|
|
don Phone #: ###-####
|
BLD-Other | 6/9/2010 | 6/9/2010 | 6/10/2010 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Concrete | 6/1/2010 | 6/1/2010 | 6/1/2010 | P | PASS |
Mike Jordan
|
|
|
don Phone #: ###-####
|
BLD-Conference | 5/28/2010 | 6/1/2010 | 6/1/2010 | A | PASS |
Mike Jordan
|
|
|
Don Phone #: ###-####
|
Issue PAID IN FULL permit | | | 5/20/2010 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 5/18/2010 | | DONE |
|
|
|
t/c w liz at ###-#### - permit ready and fees given - also need gc name, rce# and ACHD receipt
|
Permit Ready to Issue | | | 5/18/2010 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/11/2010 | | 5/17/2010 | | PEND |
Sam Zahorka
|
|
|
Pending a minimum 18 x 24 deck frming sheets. Architect has been notified.
|
Routing - Design Review | 5/17/2010 | | 5/17/2010 | | PASS |
Sarah Schafer
|
|
|
Approved per DRH10-00108.
|
Plan resubmittals received | | | 5/17/2010 | | |
Sam Zahorka
|
|
|
rec'd 3 copies of page 1 - taken to Sam
|
Case Summary (BLD) | | | 5/17/2010 | | DONE |
Sam Zahorka
|
|
|
|
Case Summary (BLD) | | | 5/17/2010 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/17/2010 | | 5/17/2010 | | PASS |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/17/2010 | | DONE |
Sam Zahorka
|
|
|
|
Inspection Record Card- Bld | | | 5/17/2010 | | DONE |
|
|
|
|
Plan assigned to (SRZ) | 4/21/2010 | | 5/17/2010 | | PASS |
Sam Zahorka
|
|
|
5/17/2010 15:11:30 SRZ - activity updated through activity BLDA022 from case BLD10-00853.
|
Plan Reviewer's activity | | | 5/14/2010 | | DONE |
Sam Zahorka
|
|
|
Responded to an email from the design proffesional BIll Matter. Requested 3 copies of the updated construction documents be submitted for review. Permit issuance pending Planning and Zoning approval. Appeal for Design Review Application will expire on Monday, 24th, at 5:00 PM. Permit will be issued promptly at this juncture.
|
Plan resubmittals received | | | 5/13/2010 | | DONE |
Tisha Gallop
|
|
|
recevied four copies of plan sheet 1 (size 11" x 17"), put on Sam Zahorkas desk.
|
Route to Impact Fee Review | 5/6/2010 | 5/11/2010 | 5/12/2010 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - FIRE | 5/6/2010 | 5/6/2010 | 5/11/2010 | | CANC |
Scott Arellano
|
|
|
Plans have changed...
|
1st review completed | | | 5/11/2010 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/11/2010 | | 5/11/2010 | | PEND |
Sam Zahorka
|
|
|
Scope of project has changed. The proposed structure has been removed and replace with a deck. Need deck framing plans and calculations. Called the architect Bill Matter and requested. Routed plans to Planning/Land Division. Planning DR modification has to be approved prior to Permit issuance.
5/12/10 Waiting for Planning DR modification appeal period to end before I can issue permit.
|
Routing - PLANNING Land Div | 5/11/2010 | | 5/11/2010 | | PASS |
Dave Abo
|
|
|
Pass. Structure proposed has been deleted and replaced with deck and fence.
|
Plan resubmittals received | | | 5/10/2010 | | DONE |
Tisha Gallop
|
|
|
received three copies of plan sheet A1 and revised cert of value; taken to Sam Zahorka.
|
Telephone call | | | 5/7/2010 | | DONE |
Sam Zahorka
|
|
|
Recieved preliminary corrections for stair and ramp landings. After reviewing I telephoned Martin Santoya and discussed the stair landing needing to be a min. length of the actual width of the proposed stairs. He stated he would correct and resubmit. SRZ
|
Case Summary (BLD) | | | 5/6/2010 | | DONE |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 4/27/2010 | | 5/6/2010 | | FAIL |
Sam Zahorka
|
|
|
|
Routing - Erosion and Sediment | 4/26/2010 | | 4/27/2010 | | PASS |
Steven Webb
|
|
|
ESC plan waiver is approved according to ESC permit's attached conditions. ESC10-00328
|
Routing - PLANNING | 4/27/2010 | | 4/27/2010 | | FAIL |
Andrea Tuning
|
|
|
On April 9, 2010, the City of Boise reviewed and approved a Design Review application (DRH10-00058). As Conditions of Approval, the applicant was required to complete the following items and submit revised plans indicating compliance with these conditions. At this time, revised plans have not been received by the Design Review staff and the only conditions that have been addressed on the building plans are Site Specific Conditions 1C, 1E and 1H. It appears as though the applicant attempted to address Site Specific Condition 1I, however, the dimensions do not meet the Federal Standards for a van accessible space.
The applicant was notified to incorporate all of the Conditions of Approval into the site and landscape plans and submit them to the Design Review Staff for review and approval. Once this review is complete, they may then submit the revised drawings to be inserted into the building plans to be reviewed for building compliance.
|
Routing - PUBLIC WORKS | 4/22/2010 | | 4/26/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Sewer Rating | 4/26/2010 | | 4/26/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 4/22/2010 | | 4/22/2010 | | PASS |
April Wing
|
|
|
|
Routing - PLANNING Land Div | 4/22/2010 | | 4/22/2010 | | FAIL |
Dave Abo
|
|
|
Prior to issuance of building permit, a Recorded Non-Build Easement Agreement must be submitted to PDS to allow placement of the structure abutting the property line. If the two lots are combined into one buildable parcel, the non-build easement isn't necessary.
|
Application received | | 4/21/2010 | 4/21/2010 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Pending Assignment by JCM | 4/21/2010 | | 4/21/2010 | | BLDA |
John Menard
|
|
|
4/21/2010 16:08:58 JCM - activity updated through activity BLDA160 from case BLD10-00853.
|
Plans ACCEPTED BY PLAN TECH | | | 4/21/2010 | | DONE |
|
|
|
|