Third Notice | | 4/5/2011 | 4/15/2011 | | DONE |
|
|
|
|
Second Notice | | 3/27/2011 | 3/31/2011 | | DONE |
|
|
|
|
First Notice | | 3/11/2011 | 3/17/2011 | | DONE |
|
|
|
|
CDHD Occupancy Approval | 3/1/2011 | 3/1/2011 | 3/1/2011 | | DONE |
Barbara Stitt
|
|
|
Phone call from Bud Fullerton on 3-1-11 ok for Perm Occupancy
|
Permanent Occupancy | | | 3/1/2011 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Aging Inspection | 2/28/2011 | 2/28/2011 | 2/28/2011 | | PASS |
Tom Arcoraci
|
|
|
|
Print Occupancy Form | | | 2/28/2011 | | DONE |
|
|
|
|
BLD-Aging Inspection | 12/28/2010 | 12/28/2010 | 12/28/2010 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 10/25/2010 | 10/25/2010 | 10/25/2010 | | PASS |
Tom Arcoraci
|
|
|
|
Telephone call | | | 8/27/2010 | | DONE |
|
|
|
Bud from CDHD called and gave the ok for final
|
FIRE-Final Inspection | 8/23/2010 | 8/23/2010 | 8/23/2010 | P | PASS |
Forrest France
|
|
|
Fire life safety passed.
|
BLD-Final | 8/19/2010 | 8/23/2010 | 8/23/2010 | P | PASS |
Tom Arcoraci
|
|
|
chris Phone #: ###-####
|
FIRE-Final Inspection | 8/20/2010 | 8/20/2010 | 8/20/2010 | P | PART |
Forrest France
|
|
|
Completed project related fire alarm permit inspection for the new duct detector.
|
FIRE-Final Inspection | 8/20/2010 | 8/20/2010 | 8/20/2010 | A | NR |
Forrest France
|
|
|
|
BLD-Framing/Rough-in | 7/21/2010 | 7/21/2010 | 7/21/2010 | P | PART |
Tom Arcoraci
|
|
|
Chris Phone #: ###-#### walls ok
|
BLD-Foundation | 7/8/2010 | 7/9/2010 | 7/9/2010 | A | PASS |
Tom Arcoraci
|
|
|
Chris Phone #: ###-####
|
Issue PAID IN FULL permit | | | 6/23/2010 | | DONE |
Barbara Stitt
|
|
|
|
Routing - MECHANICAL | 6/9/2010 | | 6/9/2010 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | 6/9/2010 | | 6/9/2010 | | DONE |
Carl Westfall
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/9/2010 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/9/2010 | | DONE |
|
|
|
|
Telephone call | | | 6/9/2010 | | DONE |
|
|
|
t/c w greg at ###-#### - permit ready and fees given - also need gc name and rce#
|
Permit Ready to Issue | | | 6/9/2010 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 4/27/2010 | | 6/9/2010 | | PASS |
Carl Westfall
|
|
|
6/9/2010 13:56:12 CJW - activity updated through activity BLDA022 from case BLD10-00886.
|
Routing - PLAN CHECK | 5/27/2010 | | 6/9/2010 | | PASS |
Carl Westfall
|
|
|
Completed the IBC resubmittal review. Drawings approved.
|
Plan resubmittals received | | | 6/2/2010 | | |
Carl Westfall
|
|
|
rec'd calcs and two copies of sheets A0.0; A0.1; A1.0; A2.0; A3.0; A3.1; A4.0; A5.0; A6.0; A7.0; M1.0; M2.1; M2.2; M3.1; M3.2; M3.3; E1.0; E2.0; taken to Carl W
|
Routing - FIRE | 5/25/2010 | 5/25/2010 | 5/27/2010 | | PASS |
Scott Arellano
|
|
|
Please, see attached comments.
|
1st review completed | | | 5/27/2010 | | DONE |
|
|
|
Failed - Plan Check, Mechanical,
|
Route to Impact Fee Review | 5/25/2010 | 5/28/2010 | 5/26/2010 | | PASS |
Cindy M. Gould
|
|
|
No impact fees for remodel
|
Routing - PLAN CHECK | 5/4/2010 | | 5/25/2010 | | FAIL |
Carl Westfall
|
|
|
The IBC plan review was started on May 18, 2010 and was finished on May 25, 2010. Some structural issues are yet to be resolved. See the plan review report.
|
Routing - MECHANICAL | 5/3/2010 | | 5/4/2010 | | FAIL |
Troy James
|
|
|
1. Explain on plans how you are going to provide 1085 cfm of additional make-up air needed.
2. Note on plans steel grease duct on roof shall be painted.
3. Detail A sheet A3.0 does not show we will have 18" clearance to combustible ceiling. Please verify if this is a problem that needs to be addressed now.
4. Same detail shows incorrect method of installing grease ducts. Revise detail or provide note refer to roof plan for proper grease duct installation.
5. The type of exhaust fan shown on schedule for type 1 hood appears to be an upflow type. Detail A sheet A3.0 shows and adjacent roof slope within 10 feet of exhaust fan. IMC 506.3.12.3 states the exhaust outlets shall be located 10 feet away from adjacent building.
6. Note on plans air balance report is required and on site for final mechanical inspection.
7. There is no mention on plans Grease duct clearances and protection to combustible construction. Am I to assume we have 18" clearance to combustibles.
|
Routing - PLUMBING | 4/29/2010 | | 5/3/2010 | | PASS |
Bill VanDegrift
|
|
|
Have Troy James review the Mechanical after Plumbing review. additional cross connection protection may be required. per plans and 2003 upc
|
Routing - Erosion and Sediment | 4/28/2010 | | 4/29/2010 | | PASS |
Steven Webb
|
|
|
ESC10-00338 plan waiver approved with attached conditions.
|
Routing - PUBLIC WORKS | 4/27/2010 | | 4/28/2010 | | PASS |
Beverly Mountain
|
|
|
|
Routing PW Environmental | 4/28/2010 | | 4/28/2010 | | PASS |
Walt Baumgartner
|
|
|
Located in Bench Sewer District. Plans revwd, 1500 gallon grease interceptor for kitchen drainage noted.
|
Pending Assignment by JCB | 4/26/2010 | | 4/27/2010 | | DONE |
Jason Blais
|
|
|
|
Routing - Addressing | 4/27/2010 | | 4/27/2010 | | PASS |
April Wing
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/26/2010 | | DONE |
|
|
|
ok per Carl Westfall to take in as a level 3
|
Recd Pcfee & Taken To Pln CK | | | 4/26/2010 | | DONE |
|
|
|
|
Application received | | 4/23/2010 | 4/23/2010 | | DONE |
Darla L Downs
|
|
|
|
Intake Approval | | | 4/23/2010 | | PASS |
|
|
|
|