Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD10-00902
StatusFinaled
Name VERTICAL CORP
Site Address 314 S 6TH ST
Project NameFront 5 West Building
Customer Number 
ePlanReviewNo
Description
(*SHELL & CORE* - Front 5 West Building) Permit is to remodel an existing 8,417 square foot area left behind from BLD10-00174. Approval contingent upon adhering to the approved plans on file, attached engineering, and DRH10-00075. Work to include: construction of interior non-bearing walls to create a new 1,362 square foot tenant space (BLD10-00995), construction of new accessible entrance ramp, installation of new store front systems in in-filled openings, construction of retaining walls where future egress stair is to be located, relocate existing drainage swell, construction of new entrance canopy over new entry, and finishes in compliance with chapter 8 of the 2006 IBC. This building is not fire sprinklered. Racking that exceeds 8 ft. in height requires a separate Building Permit be submitted and approved before installation. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 1/12/20112/3/2012 DONE
waiting for Bld10-01058 to be finaled
Second Notice 1/2/20111/7/2011 DONE
First Notice12/16/201012/16/201012/23/2010 DONE
DetailsDave Hannah
DOC - Permit Finaled12/16/201012/16/201012/16/2010APASS
DetailsDave Hannah
BLD-Aging Inspection12/13/201012/13/201012/16/2010 PASS
DetailsDave Hannah
BLD-Final10/11/201010/12/201010/12/2010APASS
DetailsDave Hannah
jerry Phone #: ###-####
FIRE-Final Inspection10/11/201010/11/201010/11/2010PPASS
DetailsTroy Cobbley
life safety passed
BLD-Aging Inspection10/1/201010/1/201010/5/2010 PASS
DetailsDave Hannah
BLD-Framing/Rough-in7/12/20107/12/20107/13/2010PPASS
DetailsDave Hannah
JERRY Phone #: ###-#### 1hr ceiling framing in corrador
FIRE-Conference7/7/20107/7/20107/7/2010PDONE
DetailsForrest France
On site visit with contractor regarding permit work in progress, shell and tenant occupancy request finals.
BLD-Framing/Rough-in6/21/20106/21/20106/21/2010PPART
DetailsDave Hannah
Jerry Phone #: ###-#### ok to cover walls back half
BLD-Conference6/16/20106/17/20106/17/2010APASS
DetailsDave Hannah
Jerry ###-#### talked about 1hr lid in corridor
BLD-Conference6/16/20106/16/20106/16/2010PDEFR
DetailsJim Storey
Jerry ###-#### to dave am
FIRE-Conference6/9/20106/9/20106/9/2010PDONE
DetailsTroy Cobbley
Jerry wanted to verify that a fire alarm system was not required for the Addecco T.I. space. Per Scott and Stephanie it appears that an alarm system is not required. The adjoining space appears to have a non required detection system for a FM200 suppresson system which has been submitted to have devices removed under a separate permit.
BLD-Framing/Rough-in6/3/20106/4/20106/4/2010APASS
DetailsJim Storey
Jerry Phone #: ###-#### grid a-c 1-3 ti area.
BLD-Foundation5/18/20105/19/20105/19/2010APASS
DetailsDave Hannah
Re-bar inspection for stem walls please-Jerry Phone #: ###-####
Permit Ready to Issue  5/13/2010 DONE
Issue PAID IN FULL permit  5/13/2010 DONE
Inspection Record Card- Bld  5/12/2010 DONE
DetailsBarbara Stitt
Telephone call  5/12/2010 DONE
DetailsBarbara Stitt
Left message Vertical Construction to call regarding picking up this permit. It is ready and has fees due but can't put to ready status as they have past due fees///5-12-10 @ 2:39 BAS
Telephone call  5/12/2010 DONE
DetailsBarbara Stitt
Left message for Bruce Poe with Cory that permit is ready & fees due @ 2:45 on 5-12-10///BAS
Routing - PLAN CHECK5/11/2010 5/11/2010 PASS
DetailsTim L. Woodard
Approved with comments in plan review report. TLW
PLANS/APPL TAKEN TO FRONT DESK  5/11/2010 DONE
DetailsTim L. Woodard
Case Summary (BLD)  5/11/2010 DONE
DetailsTim L. Woodard
Plan assigned to (TLW)4/27/2010 5/11/2010 PASS
DetailsTim L. Woodard
5/11/2010 13:58:36 TLW - activity updated through activity BLDA022 from case BLD10-00902.
Plan resubmittals received  5/10/2010  
DetailsTim L. Woodard
rec'd response letter and 2 copies of sheet C1.0 - taken to Tim W
Routing - PLAN CHECK5/3/2010 5/5/2010 FAIL
DetailsTim L. Woodard
Refer to plan review report. TLW
1st review completed  5/5/2010 DONE
DetailsTim L. Woodard
Routing - Erosion and Sediment4/30/2010 5/3/2010 PASS
DetailsSteven Webb
ESC plan waiver is approved according to the ESC permit's attached conditions. ESC10-00345
Routing - PLANNING5/3/2010 5/3/2010 PASS
DetailsJosh Wilson
Routing PW Drainage4/29/2010 4/30/2010 PASS
DetailsBrian Murphy
Routing - PUBLIC WORKS  4/30/2010 PASS
Routing - Addressing4/27/2010 4/27/2010 PASS
DetailsApril Wing
Plans ACCEPTED BY PLAN TECH  4/27/2010 DONE
Application received 4/26/20104/26/2010 DONE
DetailsAlexandra L. DeYoung