Permit Information
Permit NumberBLD10-00924
StatusFinaled
Name MCALVAIN CONSTRUCTION INC
Site Address 1015 N 8TH ST
Project NameChildren School of Boise
Customer Number 
ePlanReviewNo
Description
Children's School of Boise - Remodel - To demo and remove all floor finishes, ceilings, and most interior partitions, leaving the two interior stairways, restroom #114 and a portion of the south library partition wall. To demo, remove and replace most of the existing piping, wiring and mechanical equipment and ductwork. To remodel the entire 3,540 square foot first floor, including furring the interior side of the exterior CMU walls to increase insulation values, to windows throughout and install new roof insulation and single-ply membrane roofing. The remodel include new classroom, restroom, library and office layout. This permit will also include the complete remodel of the 655 square foot basement to include two new accessible restrooms, a furnace room and laundry/breakroom area. All sidewalks, parking lot, trash enclosure, power upgrades, water and sewer lines for the new restroom off of the playground will be completed as part of this permit. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 2/14/20112/17/2011 DONE
BLD-Final2/3/20112/4/20112/4/2011APASS
DetailsTony Young
Brett-Please call in there are any issues--Let Barb know if Perm Occ can be issued at ###-#### Phone #: ###-####,,
ok for perm occ on this permit
Permanent Occupancy UNPAID FEE  2/4/2011 DONE
DetailsBarbara Stitt
Override - Parcel Holds  11/30/2010  
Temporary Occupancy11/23/20102/28/201111/23/2010 DONE
DetailsJason Blais
Approved by Jason to extend temp occupancy see scanned documents
BLD-Final9/17/20109/20/20109/20/2010ANR
DetailsMike Jordan
julian Phone #: ###-####. Needs to install glazing in doors, Also noted issue with adition on plans. Will wait for Tony to give final sign off.
FIRE-Final Inspection9/15/20109/15/20109/15/2010APASS
DetailsForrest France
Fire life safety okayed.
FIRE-Final Inspection9/14/20109/14/20109/14/2010PPASS
DetailsForrest France
Corrections finished, fire life safety final approved.
BLD-Final9/13/20109/14/20109/14/2010APART
DetailsTony Young
Jullion Phone #: ###-####,, TEMP. OCCUPANCY ONLY,, pending others
Temporary Occupancy9/14/201012/13/20109/14/2010 DONE
DetailsDarla L Downs
BLD-Final9/10/20109/13/20109/13/2010PPART
DetailsTony Young
Jullion Phone #: ###-####,, walk through only,, punch list with Jullion
FIRE-Final Inspection9/10/20109/13/20109/13/2010PFAIL
DetailsForrest France
Provide panic hardware at three locations, post signage at the door to the FACP room, post one fire extinguisher at the basement mechanical room per review notes, remove one non-functional SD at the west stairway, provide approved plan mod reflecting the scope of work not including the new addition incomplete at this time. Project finishes underway.
Zoning Approval9/13/20109/13/20109/13/2010 DONE
DetailsMatthew A Halitsky
Interior remodel only. New roof.
FIRE-Conference9/9/20109/10/20109/10/2010ADONE
DetailsForrest France
On site conference with contractor regarding fire life safety items including door hardware, exit signs/EM lights, review notes, project related fire alarm work, etc. Missing city approved plan set on site.
BLD-Framing/Rough-in9/7/20109/8/20109/8/2010APASS
DetailsTony Young
Julian-Ceiling grid inspection please Phone #: ###-####
BLD-Framing/Rough-in8/12/20108/13/20108/13/2010APART
DetailsTony Young
Jullion Phone #: ###-####,, ok to cover walls,, need to get ok from architect or engineer on point load in north west corner that lands in the middle of basement class room
BLD-Conference8/6/20108/9/20108/12/2010APASS
DetailsTony Young
jullian Phone #: ###-####,, basement ceiling,, 2 hr..
BLD-Conference8/6/20108/6/20108/6/2010PPART
DetailsTony Young
jullian Phone #: ###-####,, frame walk through,, and inspected north portion in basement 2 hour ceiling,, 1st, 2nd,3rd layers,, ok so far
Issue PAID IN FULL permit  6/28/2010  
Print Occupancy Form  6/17/2010 DONE
Permit Ready to Issue  6/17/2010 DONE
Telephone call  6/17/2010 DONE
DetailsBarbara Stitt
Called Erstad Architects and left message that permit is ready & fees due at 9:40 on 6-17-10 BAS
PLANS/APPL TAKEN TO FRONT DESK  6/16/2010 DONE
DetailsJohn Menard
Print Occupancy Form  6/16/2010 DONE
Routing PW Drainage6/15/2010 6/16/2010 PASS
DetailsBrian Murphy
Routing - PLAN CHECK6/15/2010 6/16/2010 PASS
DetailsJohn Menard
Plan assigned to (JCM)4/28/2010 6/16/2010 PASS
DetailsJohn Menard
6/16/2010 08:37:34 JCM - activity updated through activity BLDA022 from case BLD10-00924.
Routing - PUBLIC WORKS6/14/2010 6/15/2010 PASS
DetailsConnie Baumgartner
Routing - PLAN CHECK6/7/2010 6/8/2010 PASS
DetailsJohn Menard
Reviewed and approved structural and nonstructural revisions. JCM
Plan Reviewer's activity  6/8/2010 PASS
DetailsJohn Menard
Reviewed and approved structural and nonstructural revisions. JCM
Routing - PLUMBING6/8/2010 6/8/2010 PASS
DetailsBill VanDegrift
Routing - Erosion and Sediment6/4/2010 6/7/2010 PASS
DetailsSteven Webb
ESC plan is approved according to the ESC plan and permit conditions, ESC10-00351
Routing - PUBLIC WORKS6/2/2010 6/4/2010 FAIL
DetailsConnie Baumgartner
Routing PW Drainage6/2/2010 6/4/2010 FAIL
DetailsBrian Murphy
need clarification on seepage bed10 foot seperation from bld.Brian Murphy ###-####
Routing - PLAN CHECK5/27/2010 6/2/2010  
DetailsJohn Menard
Routing - PLUMBING  5/27/2010 PASS
Routing - PLAN CHECK5/26/2010 5/27/2010  
DetailsJohn Menard
Routing - PLANNING5/27/2010 5/27/2010 PASS
DetailsSusan Riggs
Route to Impact Fee Review5/24/20105/27/20105/26/2010 PASS
DetailsCindy M. Gould
No impact fees for remodel
Routing - FIRE5/24/20105/24/20105/26/2010 PASS
DetailsScott Arellano
Please, see attached comments.
1st review completed  5/26/2010 DONE
Failed - Public Works, Planning, Plumbing
Plan resubmittals requested  5/24/2010 DONE
DetailsJohn Menard
E-mailed the architect requesting revisons. JCM
Routing - PLAN CHECK5/7/2010 5/24/2010 FAIL
DetailsJohn Menard
Routing - PLANNING5/6/2010 5/7/2010 PASS
DetailsSarah Schafer
DRH09-00133
Approved per DRH10-00075, CUP09-00042 and CVA09-00023.
Routing - PUBLIC WORKS4/28/2010 5/4/2010 FAIL
DetailsConnie Baumgartner
Failed by Brian Murphy, contact at ###-####
Routing PW Drainage5/4/2010 5/4/2010 FAIL
DetailsBrian Murphy
NEEDS MONITORING WELL ? ON GEOTECH BRIAN MURPHY ###-####
Routing PW Sewer Rating5/4/2010 5/4/2010 PASS
DetailsConnie Baumgartner
Routing PW Solid Waste5/4/2010 5/4/2010 PASS
DetailsPeter J. McCullough
Routing - Addressing4/29/2010 4/29/2010 PASS
DetailsApril Wing
Application received 4/28/20104/28/2010 DONE
DetailsAlexandra L. DeYoung
Pending Assignment by JCM4/28/2010 4/28/2010 BLDA
DetailsJohn Menard
4/28/2010 10:18:01 JCM - activity updated through activity BLDA166 from case BLD10-00924.
Plans ACCEPTED BY PLAN TECH  4/28/2010 DONE
Routing - PLANNING Land Div4/28/2010 4/28/2010 PASS
DetailsDave Abo
Lots 1-6 inc. Block 7 of AR Andola Add'n.