BLD-Final | 9/29/2010 | 9/30/2010 | 9/30/2010 | A | PASS |
Jim Storey
|
|
|
george
|
DOC - Permit Finaled | 9/30/2010 | 9/30/2010 | 9/30/2010 | P | PASS |
Jim Storey
|
|
|
|
BLD-Grading Inspection | 9/28/2010 | 9/28/2010 | 9/28/2010 | P | DONE |
Terry Records
|
|
|
Final grading and drainage approved
|
BLD-Final | 9/23/2010 | 9/24/2010 | 9/24/2010 | A | PART |
Jim Storey
|
|
|
george Phone #: ###-####pending pw/ele
|
BLD-Energy code compliance | 7/29/2010 | 7/30/2010 | 7/30/2010 | A | PASS |
Tom Arcoraci
|
|
|
George Phone #: ###-####
|
BLD-Energy code compliance | 7/29/2010 | 7/29/2010 | 7/29/2010 | P | DONE |
Tom Arcoraci
|
|
|
George Phone #: ###-####--Cancel per phone call7-29-10@ 1:08pm BAS
|
BLD-Framing/Rough-in | 7/28/2010 | 7/28/2010 | 7/28/2010 | P | PASS |
Jim Storey
|
|
|
Charlie Phone #: ###-####
|
BLD-Framing/Rough-in | 7/26/2010 | 7/26/2010 | 7/26/2010 | P | FAIL |
Jim Storey
|
|
|
charlie Phone #: ###-#### no balcony per p$z/ truss fix noted on c/n do not cover.
|
BLD-Foundation | 6/29/2010 | 6/30/2010 | 6/30/2010 | P | PASS |
Jim Storey
|
|
|
Sebastain Phone #: ###-####
|
BLD-Footing | 6/28/2010 | 6/29/2010 | 6/29/2010 | A | PASS |
Jim Storey
|
|
|
sabstian Phone #: ###-####
|
(F) Reprint permit | | | 6/10/2010 | | |
|
|
|
|
Permit Ready to Issue | | | 6/10/2010 | | DONE |
|
|
|
|
Telephone call | | | 6/10/2010 | | |
|
|
|
Called left message for George permit ready and fee given 6-10-10 DLD
|
Issue PAID IN FULL permit | | | 6/10/2010 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (CDM) | 4/29/2010 | 4/29/2010 | 6/9/2010 | | PASS |
Carl D Madsen
|
|
|
6/9/2010 16:00:36 CDM - activity updated through activity BLDA022 from case BLD10-00934.
|
Routing - PLAN CHECK | 6/4/2010 | | 6/9/2010 | | PASS |
Carl D Madsen
|
|
|
|
1st review completed | | | 6/9/2010 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 6/9/2010 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/9/2010 | | |
|
|
|
|
Inspection Record Card- Bld | | | 6/9/2010 | | DONE |
|
|
|
|
Routing - FIRE | 6/4/2010 | | 6/4/2010 | | PASS |
Scott Arellano
|
|
|
Passed, no comments
|
Route to Impact Fee Review | 4/29/2010 | 5/4/2010 | 6/3/2010 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - Erosion and Sediment | 6/3/2010 | | 6/3/2010 | | PASS |
Clint A Smith
|
|
|
ESC10-00361 plan approved per the attached conditions.
|
Routing - PLANNING | 6/2/2010 | | 6/3/2010 | | PASS |
Cody Riddle
|
|
|
Approval as redlined. The rear balcony is not allowed in the 15' setback, and the eave can encroach a maximum of 2'. This has been indicated on each plan set.
|
Routing - PUBLIC WORKS | 6/2/2010 | | 6/2/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Grading-Hillside | 6/2/2010 | | 6/2/2010 | | PASS |
Terry Records
|
|
|
Approved as category 1 by CFH10-00011
|
Routing PW Grading-Hillside | 4/30/2010 | | 4/30/2010 | | FAIL |
Terry Records
|
|
|
Because of the height of the proposed retaining wall along the reaer property line a Hillside Development Application must be approved by P&Z prior to approval of the building permit application. The applicant is aware.
|
Routing - Addressing | 4/29/2010 | | 4/30/2010 | | PASS |
April Wing
|
|
|
|
Intake Approval | | | 4/29/2010 | | PASS |
Barbara Stitt
|
|
|
Per Terry Records ok to take in with out CFH see signature on plan intake of 4-29-10 passed///4-29-10 BAS
|
Recd Pcfee & Taken To Pln CK | | | 4/29/2010 | | DONE |
Barbara Stitt
|
|
|
|
Application received | | 4/28/2010 | 4/28/2010 | | DONE |
Tisha Gallop
|
|
|
|
Intake Approval | | | 4/28/2010 | | FAIL |
Tisha Gallop
|
|
|
see attached document
|