Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD10-00959
StatusFinaled
Name EARTHCRAFT CONSTRUCTION
Site Address 2700 S VIRGINIA ST
Project Name 
Customer Number 
ePlanReviewNo
Description
This permit is for the construction of a new 800s.f. 1-story single family dwelling. R-1C ok per David Moser per redlining on planning residential review sheet attached. As this new structure is of a non typical light frame required structural engineering is provided for the pole type structure with straw bale infill for three of the exterior walls. There is a 315s.f. attached carport and 640s.f. of covered patio area at the rear and side away from the carport. All per the approved plans as marked; energy option 2; Engineering calculations and the Engineer's details; Boise City Straw Bale Construction Requirements (attached) and the plan review notes. pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/2/20109/3/20109/3/2010APASS
DetailsJim Storey
Ron - call 30 mins prior to going Phone #: ###-####
DOC - Permit Finaled9/3/20109/3/20109/3/2010PPASS
DetailsJim Storey
BLD-Final9/2/20109/2/20109/3/2010PNR
DetailsJim Storey
Ron - call 30 mins prior to going Phone #: ###-####
BLD-Energy code compliance7/26/20107/26/20107/26/2010PPASS
DetailsJim Storey
Ron-Please call prior to inspection Phone #: ###-####
BLD-Framing/Rough-in7/21/20107/22/20107/22/2010APASS
DetailsJim Storey
Ron-Please call prior to inspection for access Phone #: ###-####
BLD-Other6/23/20106/23/20106/23/2010PPASS
DetailsJim Storey
ron - staw bale inspection Phone #: ###-####
BLD-Foundation6/1/20106/2/20106/2/2010APASS
DetailsJim Storey
Rick Phone #: ###-####
BLD-Foundation5/21/20105/24/20105/24/2010APASS
DetailsJim Storey
ron Phone #: ###-####
BLD-Footing5/14/20105/17/20105/17/2010PPASS
DetailsJim Storey
Mark Phone #: ###-####
Issue PAID IN FULL permit  5/13/2010 DONE
OVERRIDE  5/12/2010  
Plan assigned to (PEP)5/7/20105/7/20105/12/2010 PASS
DetailsPerry Paine
5/12/2010 10:04:50 PEP - activity updated through activity BLDA022 from case BLD10-00959.
Route to Impact Fee Review4/30/20105/5/20105/12/2010 PASS
DetailsCindy M. Gould
Credit given for demo BLD07-01421



Routing - PLAN CHECK5/6/2010 5/12/2010 PASS
DetailsCarl D Madsen
Case Summary (BLD)  5/12/2010  
1st review completed  5/12/2010 DONE
PLANS/APPL TAKEN TO FRONT DESK  5/12/2010 DONE
Inspection Record Card- Bld  5/12/2010 DONE
Permit Ready to Issue  5/12/2010 DONE
DetailsTisha Gallop
Routing - PLANNING5/11/2010 5/11/2010 PASS
DetailsDavid Moser
Approved as redlined; The driveway shall be a min width of 9 feet, The parking area shall be paved with hard surface and be 35 feet in lenght and 9 feet wide for tandem parking, the driveway can use pavers (urbanite; see attached information) from roadway to parking area.
Plan assigned to (CDM)4/30/20104/30/20105/7/2010 DEFR
DetailsCarl D Madsen
Routing - PUBLIC WORKS5/5/2010 5/6/2010 PASS
DetailsConnie Baumgartner
Routing - PLANNING5/6/2010 5/6/2010 FAIL
DetailsDavid Moser
Need to identify driveway paving material.
Routing - Addressing4/30/2010 5/5/2010 PASS
DetailsApril Wing
Intake Approval  4/30/2010 PASS
Application received 4/30/2010