Permit Information
Permit NumberBLD10-00960
StatusFinaled
Name PACIFIC SIERRA CONSTRUCTION
Site Address 805 W IDAHO ST 200
Project NameBOISE CITY NATL BANK BLDG
Customer Number 
ePlanReviewNo
Description
(The Caprock Group) - The fire sprinkler system substitutes for the 1-hr fire-resistance-rating of the building structure. To remodel an existing 4,000 square foot, office tenant space, on the second floor, of an existing building. Work to include: minor demolition per plans; construct new 2X4, wood, interior non-bearing, partition walls to create a storage room and an open office area; construct a partial height wall for an entry feature; related interior finishes in compliance with chapter 8 of the 2006 IBC; repair and replace existing ceiling system as required; upgrade the lighting layout; modify the existing exit lighting; plumbing, mechanical, and electrical work. All work per the approved plans, attached plan review report, and all other reviewing agencies approvals. NOTE: This building is fully fire sprinklered. Any alterations or modifications to the fire sprinkler system shall be per NFPA #13 as regulated by the fire department and will require a separate permit. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  7/11/2012 DONE
DetailsTisha Gallop
Third Notice 2/7/20122/2/2012 DONE
Second Notice 1/27/20122/2/2012 DONE
DetailsChristina Prado
mailed 2-3-12
First Notice 1/8/20121/17/2012 DONE
BLD-Aging Inspection12/22/201112/23/201112/29/2011APASS
DetailsDave Hannah
Per Dave Hannah give Occupancy
Print Occupancy Form  12/29/2011  
Permanent Occupancy  12/29/2011 DONE
DetailsBarbara Stitt
BLD-Aging Inspection3/8/20113/8/20113/8/2011 PASS
DetailsDave Hannah
BLD-Conference1/6/20111/6/20111/6/2011APASS
DetailsDave Hannah
BLD-Aging Inspection1/6/20111/6/20111/6/2011 PASS
DetailsDave Hannah
BLD-Conference10/14/201010/14/201010/19/2010PPASS
DetailsDave Hannah
BLD-Final8/6/20108/6/20108/7/2010PPART
DetailsDave Hannah
scott Phone #: ###-#### ok for temp occ
FIRE-Final Inspection8/6/20108/6/20108/6/2010PPASS
DetailsForrest France
Fire life safety inspection completed acceptable.
FIRE-Final Inspection8/3/20108/4/20108/5/2010PNR
DetailsForrest France
Pending project related FIR permit completions. Noted missing "door to remain....." signage at the tenant main entry/exit door during walkthrough- notified contractor to post prior to final.
BLD-Final8/5/20108/5/20108/5/2010PNR
DetailsDave Hannah
BLD-Final8/4/20108/5/20108/5/2010ANR
DetailsDave Hannah
Scott Phone #: ###-####
BLD-Other7/15/20107/19/20107/20/2010PPART
DetailsDave Hannah
Scott - ceiling Phone #: ###-#### 2nd floor ok
FIRE-Conference7/13/20107/13/20107/13/2010PDONE
DetailsForrest France
Regarding project related fire sprinkler permit work.
BLD-Framing/Rough-in6/17/20106/17/20106/17/2010PPASS
DetailsDave Hannah
Scott Phone #: ###-####
Issue PAID IN FULL permit  6/4/2010 DONE
Telephone call  6/2/2010 DONE
called David Ruby SWR fees have gone up and told new fees 6-2-10 dld
Plan assigned to (SRZ)5/3/20105/3/20105/14/2010 PASS
DetailsSam Zahorka
5/14/2010 08:38:15 SRZ - activity updated through activity BLDA022 from case BLD10-00960.
Routing - PLAN CHECK5/13/2010 5/14/2010 PASS
DetailsSam Zahorka
Case Summary (BLD)  5/14/2010 DONE
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  5/14/2010 DONE
DetailsSam Zahorka
Print Occupancy Form  5/14/2010 DONE
Telephone call  5/14/2010 DONE
left vm for david at ###-#### - permit ready and fees given
Permit Ready to Issue  5/14/2010 DONE
Details
1st review completed  5/13/2010 PASS
Routing - FIRE5/12/2010 5/13/2010 PASS
DetailsScott Arellano
Attached IFC comments to plans. *This building is engaged in active fire protection upgrades.*
Routing - Addressing5/12/2010 5/12/2010 PASS
DetailsApril Wing
Routing - PLAN CHECK5/3/2010 5/12/2010 PASS
DetailsSam Zahorka
Routing - PUBLIC WORKS5/12/2010 5/12/2010 PASS
DetailsBeverly Hall
Replacing sink and toilet near conference room. Adding Sink in Work room.
Application received 4/30/20105/3/2010 DONE
DetailsTisha Gallop
Plans ACCEPTED BY PLAN TECH  4/30/2010 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  4/30/2010 DONE
DetailsTisha Gallop