Print Statement | | | 5/9/2012 | | DONE |
|
|
|
|
Third Follow up | | | 5/2/2012 | | DONE |
Christina Prado
|
|
|
Done 5/8/12
|
Third Notice | | 3/30/2012 | 4/18/2012 | | DONE |
|
|
|
mailed and faxed to GC
|
Third Notice | | 3/15/2012 | 3/15/2012 | | DONE |
|
|
|
faxed to Sletten Construction
|
Third Notice | | 1/22/2012 | 3/1/2012 | | DONE |
|
|
|
faxed to Sletten Const.
|
Second Notice | | 1/13/2012 | 1/17/2012 | | DONE |
Christina Prado
|
|
|
faxed 1-17-12
|
First Notice | | 12/26/2011 | 1/3/2012 | | DONE |
|
|
|
|
Permanent Occupancy | | | 12/16/2011 | | DONE |
Barbara Stitt
|
|
|
|
Temporary Occupancy | 11/16/2011 | 2/14/2012 | 11/16/2011 | | DONE |
Barbara Stitt
|
|
|
Per request of Christy Little with ACHD the temp occupancy has been extended another 45 days as they are still working out an agreent regarding impact fees between the school board and ACHD commission in another 30 days. See email in the scanned documents dated 11-16-11//BAS
|
Change Expiration Date Only | | | 11/15/2011 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Aging Inspection | 10/27/2011 | 10/27/2011 | 10/27/2011 | | PASS |
Dave Hannah
|
|
|
|
Temporary Occupancy | 8/23/2011 | 11/21/2011 | 8/23/2011 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 8/18/2011 | 8/19/2011 | 8/19/2011 | A | PASS |
Dave Hannah
|
|
|
dustin Phone #: ###-#### ok for cc
|
PubWorks Occupancy Approval | 8/10/2011 | 8/10/2011 | 8/10/2011 | | DONE |
Tiffany Lowery
|
|
|
|
FIRE-Final Inspection | 8/9/2011 | 8/9/2011 | 8/9/2011 | P | PASS |
Forrest France
|
|
|
Fire life safety inspection passed.
|
BLD-Final | 8/8/2011 | 8/9/2011 | 8/9/2011 | P | PART |
Dave Hannah
|
|
|
jerry Phone #: ###-#### ok for temp occ need to add two hand rails find out from arct about ada grab bars and the rating on server room
|
Zoning Approval | 8/9/2011 | 8/9/2011 | 8/9/2011 | | PASS |
David Moser
|
|
|
The school provided a copy of the ACHD Resolution #950 granting approval to give the alleyway to the school district and the quitclaim deed (recorded) for the land transfer. Zoning approval final occup.
|
Plan resubmittals received | | | 8/9/2011 | | DONE |
Jason Blais
|
|
|
Received Right of Way Resolution and Right of Way Deed (documents attached to this case) regarding the former alley from Chris Wendrowski of the Boise School District. Documents forwarded to the Current Planning section (David Moser) and to the Subdivision section (Dave Abo).
|
FIRE-Final Inspection | 8/5/2011 | 8/8/2011 | 8/8/2011 | A | PART |
Forrest France
|
|
|
Verified prior correction items are finished. Final pending project related fire alarm permit.
|
FIRE-Final Inspection | 8/4/2011 | 8/5/2011 | 8/5/2011 | A | FAIL |
Troy Cobbley
|
|
|
Need final sign off for the fire alarm permit. Also I found a manual pull station at the north exit fo the gym that is mounted too high. There are two emergency lights that need the batteries hooked up and one combo exit sign/emergency light that is located over the main exit that did not function. The exit sign from the gym back into the school is missing as well.
|
Zoning Approval Temp | 8/5/2011 | 8/5/2011 | 8/5/2011 | | DONE |
David Moser
|
|
|
6 Month Temp Occ. The alleyway needs to be vacated or an application to vacate needs to be submitted to the City to vacate the alleyway.
|
FIRE-Conference | 7/29/2011 | 7/29/2011 | 7/29/2011 | A | DONE |
Forrest France
|
|
|
Regarding project related fire alarm permit work.
|
FIRE-Sprinkler Rough-in | 7/20/2011 | 7/20/2011 | 7/21/2011 | P | PART |
Forrest France
|
|
|
Ref. stamped fire sprinkler plans for red-line annotations regarding areas okayed for cover on the 1st and 2nd floors to date.
|
BLD-Framing/Rough-in | 7/14/2011 | 7/15/2011 | 7/15/2011 | A | PART |
Dave Hannah
|
|
|
jerry Phone #: ###-#### ceiling grid ok to cover second floor ok to all but kitchen on first floor after fire oks
|
BLD-Other | 7/13/2011 | 7/13/2011 | 7/13/2011 | P | PASS |
Dave Hannah
|
|
|
Jerry Phone #: ###-####ceiling grid ok to cover after fire oks
|
BLD-Framing/Rough-in | 6/15/2011 | 6/16/2011 | 6/16/2011 | A | PART |
Dave Hannah
|
|
|
jerry Phone #: ###-#### ok to cover roof over entery
|
FIRE-Sprinkler Rough-in | 6/6/2011 | 6/6/2011 | 6/6/2011 | P | PART |
Forrest France
|
|
|
UG fire supply line okayed for bury.
|
BLD-Framing/Rough-in | 5/24/2011 | 5/24/2011 | 5/24/2011 | P | PART |
Dave Hannah
|
|
|
jerry - as early as possible please Phone #: ###-#### strapes on each end of low roof east end of bldg ok to cover roof
|
FIRE-Sprinkler Rough-in | 5/10/2011 | 5/10/2011 | 5/11/2011 | A | PART |
Forrest France
|
|
|
Ref. stamped fire sprinkler plans for locations inspected at the 1st and 2nd floors. Also discussed coverage at combustible concealed spaces and exceptions allowed per NFPA 13.
|
BLD-Energy code compliance | 5/6/2011 | 5/9/2011 | 5/9/2011 | A | PASS |
Dave Hannah
|
|
|
jerry Phone #: ###-#### new addition area
|
BLD-Framing/Rough-in | 5/2/2011 | 5/3/2011 | 5/3/2011 | A | PART |
Dave Hannah
|
|
|
Jerry Phone #: ###-#### shear in east stair tower ok to cover
|
BLD-Energy code compliance | 4/27/2011 | 4/27/2011 | 4/27/2011 | P | PASS |
Dave Hannah
|
|
|
jerry Phone #: ###-#### east startower
|
BLD-Framing/Rough-in | 4/25/2011 | 4/26/2011 | 4/26/2011 | A | PART |
Dave Hannah
|
|
|
jerry Phone #: ###-#### ok to insulate east stair tower
|
BLD-Framing/Rough-in | 4/13/2011 | 4/14/2011 | 4/14/2011 | A | PART |
Dave Hannah
|
|
|
jerry Phone #: ###-####west stair tower shear sheeting ok to cover
|
BLD-Framing/Rough-in | 4/11/2011 | 4/11/2011 | 4/12/2011 | P | PART |
Dave Hannah
|
|
|
Jerry Phone #: ###-#### ok to cover second floor walls
|
BLD-Framing/Rough-in | 4/1/2011 | 4/1/2011 | 4/4/2011 | P | PART |
Dave Hannah
|
|
|
Jerry Phone #: ###-####framing on west stair tower ok to cover
|
BLD-Framing/Rough-in | 3/28/2011 | 3/29/2011 | 3/30/2011 | A | PART |
Dave Hannah
|
|
|
jerry Phone #: ###-#### ok to cover ext on new addition
|
BLD-Framing/Rough-in | 3/23/2011 | 3/23/2011 | 3/23/2011 | P | FAIL |
Dave Hannah
|
|
|
jerry Phone #: ###-#### ext nailing on new section
|
BLD-Framing/Rough-in | 3/22/2011 | 3/22/2011 | 3/23/2011 | P | PART |
Dave Hannah
|
|
|
jerry Phone #: ###-#### fire blocking on first floor furred out walls ok to cover first couple of rooms needs to use larger peices of insulation so they will stay in place on the rest
|
BLD-Framing/Rough-in | 3/18/2011 | 3/21/2011 | 3/21/2011 | A | PART |
Dave Hannah
|
|
|
JERRY Phone #: ###-#### ok to cover ext walls on 1 first floor
|
BLD-Framing/Rough-in | 3/16/2011 | 3/17/2011 | 3/17/2011 | P | CANC |
Dave Hannah
|
|
|
brock Phone #: ###-####///canceled by Mr Hine at 9 A.M.
|
BLD-Other | 3/15/2011 | 3/15/2011 | 3/15/2011 | P | PART |
Tony Young
|
|
|
jerry - roof sheating Phone #: ###-####,, roof nailing on the addition ok.. per plans
|
BLD-Framing/Rough-in | 3/7/2011 | 3/8/2011 | 3/8/2011 | A | PART |
Dave Hannah
|
|
|
jerry Phone #: ###-#### floor framing for ada ramp on second floor
|
FIRE-Conference | 3/7/2011 | 3/7/2011 | 3/8/2011 | A | NR |
Forrest France
|
|
|
|
BLD-Framing/Rough-in | 2/11/2011 | 2/14/2011 | 2/14/2011 | A | PASS |
Dave Hannah
|
|
|
JERRY Phone #: ###-#### roof straping and parapet connections ok to cover
|
BLD-Framing/Rough-in | 2/10/2011 | 2/11/2011 | 2/14/2011 | A | FAIL |
Dave Hannah
|
|
|
Jerry Hine Phone #: ###-#### still needs to make connections
|
BLD-Framing/Rough-in | 2/8/2011 | 2/9/2011 | 2/10/2011 | A | PART |
Dave Hannah
|
|
|
jerry Phone #: ###-#### roof bracing see on site plans for locations ok to cover
|
BLD-Framing/Rough-in | 1/24/2011 | 1/25/2011 | 1/26/2011 | P | PART |
Dave Hannah
|
|
|
Jerry Hine Phone #: ###-#### roof straping and bracing see plans on site for locations
|
BLD-Framing/Rough-in | 1/24/2011 | 1/24/2011 | 1/24/2011 | P | PART |
Dave Hannah
|
|
|
gerry Phone #: ###-#### floor in library ok to cover
|
BLD-Framing/Rough-in | 1/19/2011 | 1/20/2011 | 1/20/2011 | A | PART |
Mike Jordan
|
|
|
jerry Phone #: ###-####. Parapet connections, simpson H8 to stell I beams at roof area C North and east parapets.
|
BLD-Framing/Rough-in | 1/18/2011 | 1/19/2011 | 1/19/2011 | A | PART |
Dave Hannah
|
|
|
Jerry Phone #: ###-####room straping east end of upper roof ok
|
BLD-Framing/Rough-in | 1/18/2011 | 1/18/2011 | 1/18/2011 | P | PART |
Dave Hannah
|
|
|
jerry Phone #: ###-#### floor and ceiling connections see plan for locations
|
BLD-Aging Inspection | 12/15/2010 | 12/15/2010 | 12/20/2010 | | PASS |
Dave Hannah
|
|
|
work in progress
|
BLD-Footing | 10/14/2010 | 10/15/2010 | 10/16/2010 | A | PART |
Dave Hannah
|
|
|
jerry - late morning please Phone #: ###-#### crew working on walls mti will be on site to inspect rebar and test concrete
|
BLD-Foundation | 9/30/2010 | 10/1/2010 | 10/1/2010 | P | PART |
Dave Hannah
|
|
|
Jerry Hine--Pour at 1:30 Phone #: ###-#### elev pit mti will be on site to inspect rebar and test concrete
|
Issue PAID IN FULL permit | | | 7/30/2010 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/20/2010 | | DONE |
|
|
|
|
Telephone call | | | 7/20/2010 | | DONE |
|
|
|
t/c w joe at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 7/20/2010 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/16/2010 | | 7/19/2010 | | PASS |
John Menard
|
|
|
|
Plan Reviewer's activity | | | 7/19/2010 | | PASS |
John Menard
|
|
|
Reviewed and approved last plan revisions. JCM
|
Routing - PLANNING Land Div | 7/19/2010 | | 7/19/2010 | | PASS |
Todd Tucker
|
|
|
Prior to issuance of Certificate of Occupancy either the alley must be vacated or an application for vacation must be submitted to Boise City.
|
Routing - PLAN CHECK | 7/19/2010 | | 7/19/2010 | | PASS |
John Menard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/19/2010 | | DONE |
John Menard
|
|
|
|
Plan assigned to (JCM) | 5/10/2010 | | 7/19/2010 | | PASS |
John Menard
|
|
|
7/19/2010 16:11:01 JCM - activity updated through activity BLDA022 from case BLD10-01036.
|
Routing - FIRE | 7/15/2010 | | 7/16/2010 | | PASS |
Scott Arellano
|
|
|
Attached updates IFC comments to plans
|
Plan resubmittals received | | | 7/16/2010 | | DONE |
Tisha Gallop
|
|
|
received transmittal, repsonse letter and two copies of plan sheets A1.1, A2.4, A2.5, A2.9, A2.10; inserted into plans by arch. rep. and taken back to Fire Review.
|
Routing - PLAN CHECK | 7/14/2010 | | 7/15/2010 | | FAIL |
John Menard
|
|
|
|
Plan Reviewer's activity | | | 7/15/2010 | | PASS |
John Menard
|
|
|
Reviewed and approved structural revisions. JCM
|
Plan resubmittals requested | | | 7/15/2010 | | DONE |
John Menard
|
|
|
E-mailed the architect a letter requesting additonal revisions. JCM
|
Routing - PLANNING Land Div | 7/12/2010 | | 7/13/2010 | | FAIL |
Todd Tucker
|
|
|
Cannot pass until the alley right-of-way has been vacated by ACHD. This item will be before the ACHD Commission on July 28th.
|
Routing - PUBLIC WORKS | 7/12/2010 | | 7/12/2010 | | PASS |
Beverly Mountain
|
|
|
|
Routing - PLANNING | 7/12/2010 | | 7/12/2010 | | PASS |
David Moser
|
|
|
OK as per Jason Blais email dated 7-12-10 for Right-of-Way Vacation.
|
Routing PW Sewer Design | 7/12/2010 | | 7/12/2010 | | PASS |
Mike Sheppard
|
|
|
|
Routing - PLAN CHECK | 6/25/2010 | | 7/12/2010 | | |
John Menard
|
|
|
|
Plan resubmittals received | | | 7/9/2010 | | |
|
|
|
LOOKS LIKE THESE ARE COMPLEAT NEW SET. Alex restamped the plans and will return the set to John M. received 1 transmittal,1 structural plan check review ,1 response,2 structural specifications part A & B books, 2 asbestos abatment and lead renovation books, 2 mechanical /electrical specifications books,2 structural specification and construction books,nad 2 copiues of sheets A0.0,A0.1,C1.0,C2.0,C3.0,C4.0,L1.1,L1.2,L1.3,L2.0,A1.0,A1.1,A2.0,A2.1,A2.2,A2.3,A2.4,A2.5,A2.6,A2.7,A2.8,A2.9,A2.10,A2.11,A2.13,A2.14,A2.15,A2.16,A2.17,A2.18,A2.19,A2.20,A2.21,A2.22,A3.0,A3.1,A4.0,A5.0,A5.1,A6.0,A6.1,A6.2,A6.3,A6.4,A6.5,A6.6,A6.7,A6.8,S1.0,S1.1,S2.0,S2.1,S2.2,S3.0,S3.1,S4.0,S4.1,S4.2,M1.0M1.1,M2.0,M2.1,M2.2,M3.0,M3.1M3.2,M4.1,M4.2,M5.0,M5.1,M5.2,M6.0,M6.1,M6.2,M6.3,M7.0,M8.0,M9.0,E0.10,E1.1D,E2.1D,E0.1L,E1.1L,E2-1L,E0.1P,E1.1P,E1.2P,E2.1P,E2.2P,E0.1S,E1.1S,E2.1S,E3.0,E3.1,E3.2,E4.0,E4.1 inserted by Angelia from HSA . Plans returned to John M.
bld10-0
|
Route to Impact Fee Review | 6/21/2010 | 6/24/2010 | 6/29/2010 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - FIRE | 6/21/2010 | 6/21/2010 | 6/25/2010 | | FAIL |
Scott Arellano
|
|
|
Faxed and emailed resubmittal items to architect.
|
1st review completed | | | 6/25/2010 | | FAIL |
|
|
|
Failed Planning, Plan Check, Fire
|
Plan resubmittals requested | | | 6/21/2010 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the plan review requesting revisions. JCM
|
Routing - PLAN CHECK | 5/24/2010 | | 6/21/2010 | | FAIL |
John Menard
|
|
|
|
Routing - PLANNING | 5/21/2010 | | 5/24/2010 | | FAIL |
David Moser
|
|
|
need to start the right-of-way vacation process for the alley or gain ACHD / building department wavier. Need written approval from forestry department for tree protection plan.
|
Plan resubmittals requested | | | 5/24/2010 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the structural review requesting revisions. JCM
|
Routing - MECHANICAL | 5/21/2010 | | 5/21/2010 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 5/18/2010 | | 5/21/2010 | | PASS |
Bill VanDegrift
|
|
|
per plans and 2003 upc
|
Routing Off Site - STRUCTURAL | 5/10/2010 | | 5/21/2010 | | FAIL |
John Menard
|
|
|
called Action Couriers for pick up. DLD Received comment list from consulting strucural engineer requesting revisions. JCM
|
Routing - Erosion and Sediment | 5/18/2010 | | 5/18/2010 | | PASS |
Steven Webb
|
|
|
ESC plan is approved according to the plan and the ESC permit conditions. Notified contractor (Sloetten) that a certified Responsible Person is required prior to the issuance of the permits. ESC10-00390: RP was provided and added to the case on 5/19/10.
|
Routing - PUBLIC WORKS | 5/11/2010 | | 5/18/2010 | | FAIL |
Connie Baumgartner
|
|
|
Failed by Jon Gunnerson sewer design ###-####
|
Routing PW Sewer Rating | 5/17/2010 | | 5/18/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Environmental | 5/18/2010 | | 5/18/2010 | | PASS |
Walt Baumgartner
|
|
|
Plans revwd. Note new 1500 GI for all drainage in new kitchen area.
|
Routing PW Sewer Design | 5/17/2010 | | 5/17/2010 | | FAIL |
Jon R. Gunnerson
|
|
|
Revise sanitary sewer plans to drain into private service line.
|
Routing PW Drainage | 5/13/2010 | | 5/17/2010 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Solid Waste | 5/13/2010 | | 5/13/2010 | | PASS |
Peter J. McCullough
|
|
|
No Changes to SW
|
Routing - Addressing | 5/12/2010 | | 5/12/2010 | | PASS |
April Wing
|
|
|
|
Routing - PLANNING Land Div | 5/10/2010 | | 5/11/2010 | | FAIL |
Todd Tucker
|
|
|
Prior to approval, documentation must be provided showing that the existing alley right-of-way has been vacated.
|
Application received | | 5/10/2010 | 5/10/2010 | | DONE |
Darla L Downs
|
|
|
|
Pending Assignment by JCM | 5/10/2010 | | 5/10/2010 | | BLDA |
John Menard
|
|
|
5/10/2010 14:20:55 JCM - activity updated through activity BLDA166 from case BLD10-01036.
|
Plans ACCEPTED BY PLAN TECH | | | 5/10/2010 | | DONE |
|
|
|
Ok per Carl Westfall to take in as a New Commercial
|
Plan routing begun/NEW & ADDTN | | | 5/10/2010 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/10/2010 | | |
|
|
|
|