(IDAHO EPILEPSY & NEUROLOGY) Remodel of an existing 3,788 sq. ft. main floor W/ 732 sq. ft. basement tenant space for new medical office tenant in existing building per approved plans. Work to include select interior demolition & removal of 4 exterior doors & infill with fixed glazing in openings; installation of structural beams & supportper engineering & plans; 1-hour fire-resistive rating on ceiling & frame side of walls of basement storage area & stair access/egress serving basement, W/ self-closing 3/4 Hour rated door & frame at bottom of stairs; new interior walls to create offices, reception/waiting, exam, staff restroom, accessible public restrooms, HI-LO drinking fountain, break room & basement storage room. New exterior roof membrane, HVAC, and accessible route to include new concrete ramp & rails; electrical, mechanical & plumbing upgrades; replace exterior facia & wood facade elements. All per reviewed plans, red-line notes on plans and all attached plan review comments / conditions of all reviewing agencies. Maintain existing attic draft-stop. drs DRH10-00055
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 2/7/20111/26/2011 DONE
Third Notice 1/15/20111/24/2011 DONE
mailed
Second Notice 1/1/20111/10/2011 DONE
First Notice 12/12/201012/22/2010 DONE
BLD-Final12/2/201012/2/201012/2/2010PPASS
DetailsTony Young
TONY Phone #: ###-####
BLD-Final12/1/201012/2/201012/2/2010APASS
DetailsTony Young
TONY Phone #: ###-####
Permanent Occupancy  12/2/2010 DONE
DetailsChristina Prado
BLD-Final11/30/201012/1/201012/1/2010ACANC
DetailsTony Young
TONY Phone #: ###-####
FIRE-Final Inspection11/29/201011/30/201011/30/2010APASS
DetailsForrest France
Correction notice items field verified for completion. Fire life safety passed.
FIRE-Final Inspection11/23/201011/24/201011/24/2010PFAIL
DetailsForrest France
Items noted include; post one fire extinguisher at the basement level, provide approved door hardware at the first floor east exit door, remove the chevron at exit sign in the hall for dual direction per plan, install closure and seal at the rated basement door, remove the drawbridge and associated equipment at the basement stairway in non-compliance with egress requirements per IFC 2006.
Zoning Approval11/24/201011/24/201011/24/2010 DONE
DetailsMatthew A Halitsky
BLD-Conference11/23/201011/23/201011/23/2010PPASS
DetailsTony Young
Tony Phone #: ###-####,, ?s on final
Plan Reviewer's activity  11/8/2010 PASS
Received alternate request letter with floor plan asking for alternate means of providing water to the public by means of a bottle water cooler placed behind the reception counter. The receptionist will provide cups of water upon request. The Dr. deals with patients severly limited in ability to act and to understand and having the drinking fountain out in the waiting area will provide a possible source of injury and or water damage to the facility if patients play with water. The required HI-LO drinking fountain has been plumbed into the wall per original plans for future installation per alternate letter. A plan showing the proposed location of bottle water is attached to alternate letter. Jason Blais, Building Official approved the alternate and attached to this BLD10-01041. i FAXED A COPY OF THE APPROVED ALTERNATE REQUEST AND FLOOR PLAN BACK TO SHANNON at Dr. Wechslers office for their records. A copy is also attached to the original plans.
BLD-Conference11/2/201011/2/201011/1/2010PPART
DetailsTony Young
Conference with contractor on cabinet heights. Cabinets that are workstations in an exam room are exempt from ADA height requirements provided they are not needed/used by the patient during the examination. Greater height then identified on approved plans allowed in these exam rooms.
BLD-Other10/26/201010/27/201010/27/2010APASS
DetailsTony Young
Tony Phone #: ###-####,, ceiling grid
BLD-Other10/26/201010/26/201010/26/2010PPART
DetailsTony Young
Tony Phone #: ###-####,, need mech pass in ceiling 1st,, then ok
Plan resubmittals received  10/18/2010 DONE
DetailsTisha Gallop
received letter address to Jason Blais requesting alternative to drinking fountain; routed to Jason Blais.
BLD-Energy code compliance9/28/20109/29/20109/29/2010APASS
DetailsTom Arcoraci
tony Phone #: ###-#### - late morning please
BLD-Energy code compliance9/23/20109/24/20109/24/2010ANR
DetailsTony Young
Tony Phone #: ###-####
BLD-Energy code compliance9/22/20109/23/20109/23/2010ANR
DetailsTony Young
Tony Phone #: ###-####
BLD-Framing/Rough-in9/21/20109/22/20109/22/2010APART
DetailsTony Young
Tony Phone #: ###-####,, walls ok to insulate,, connect plates
Telephone call  8/10/2010 DONE
t/c w ryan at ###-#### - permit ready and fees given - also need ACHD receipt
Permit Ready to Issue  8/10/2010 DONE
Details
Issue PAID IN FULL permit  8/10/2010 DONE
DetailsTisha Gallop
Plan assigned to (SRZ)8/2/2010 8/9/2010 DONE
DetailsSam Zahorka
Re-assigned to Sam Zahorka to review resubmittals.
Case Summary (BLD)  8/9/2010 DONE
DetailsSam Zahorka
Plan resubmittals received  8/9/2010 DONE
DetailsTisha Gallop
received two copies of sheet a8.11; inserted by arch. rep. and taken back to Sam Zahorka.
PLANS/APPL TAKEN TO FRONT DESK  8/9/2010 DONE
DetailsSam Zahorka
Print Occupancy Form  8/9/2010 DONE
Routing - PLAN CHECK6/4/2010 8/9/2010 PASS
DetailsSam Zahorka
Plan corrections received and inserted into plans.
Plan assigned to (DRS)5/12/2010 8/2/2010 DEFR
DetailsJason Blais
Re-assigned to Sam Zahorka to review resubmittals.
Plan resubmittals received  7/27/2010  
received 2 comments, 2 structural calcs,(2 sent review comments) and 2 copies of sheets G0.01,G0.02,G0.03,AS1.11,AS1.12,A1.01,A1.10A1.30,A1.40,A1.41,A2.01,A2.02,A3.01,A3.02,A4.01,A4.02,A5.01,A5.50,A5.51,A6.10,A7.10,A7.11,A7.12,A7.13,A7.14,A7.15,A8.10,ID1.01,ID1.02,S1.1,M0.0,M0.1,M2.1,M2.2,M3.0,P0.0,P2.1,P2.2,P2.3,P3.0,E0.0,E0.1,E1.1,E1.2,E1.3,E1.4sent to Dan S.
Routing - FIRE6/3/20106/3/20106/4/2010 PASS
DetailsScott Arellano
Please, see attached comments.
1st review completed  6/4/2010 DONE
Failed - Plan Check
Route to Impact Fee Review6/3/20106/8/20106/3/2010 PASS
DetailsCindy M. Gould
Tenant improvement no impact fees
Plan resubmittals requested  6/3/2010 DONE
Copy of plan review e-mailed to architect.
Print Pending Permit.LaserJet4  6/3/2010  
Case Summary (BLD)  6/3/2010  
Routing - PLAN CHECK5/21/2010 6/3/2010 FAIL
DetailsDan Stuart
Copy of plan review e-mailed to architect for response. Plans routed to fire code analyst.
Routing - Design Review5/17/2010 5/21/2010 PASS
DetailsMatthew A Halitsky
Matt Halitsky - DRH10-00055

Routed to Plan Check.
Routing - Erosion and Sediment5/14/2010 5/17/2010 PASS
DetailsSteven Webb
ESC plan waiver is approved according to the ESC permit's conditions. ESC10-00393
Routing - PLUMBING5/17/2010 5/17/2010 PASS
DetailsBill VanDegrift
drainage for t&p must be provided.
Routing - PUBLIC WORKS5/12/2010 5/14/2010 PASS
DetailsBeverly Mountain
Plan resubmittals received  5/14/2010  
DetailsDan Stuart
rec'd 3 copies of asbestoes inspection packet - taken to Dan S
Routing - Addressing5/13/2010 5/13/2010 PASS
DetailsApril Wing
Pending Assignment by JCB5/11/2010 5/12/2010 DONE
DetailsJason Blais
Plan Reviewer's activity  5/12/2010 DONE
DetailsJason Blais
E-mailed architect to have him contact ACHD to determine if any additional impact fees are required.
Application received 5/10/20105/11/2010 DONE
Plans ACCEPTED BY PLAN TECH  5/11/2010 DONE
Intake Approval  5/10/2010 PASS
DetailsTim L. Woodard