Permit Information
Permit NumberBLD10-01058
StatusFinaled
Name VERTICAL CORP
Site Address 306 S 6TH ST
Project NameIntegrated Design Lab
Customer Number 
ePlanReviewNo
Description
(INTEGRATED DESIGN LAB) PLAN MODIFICATION, 1/18/11, EXPANDING SCOPE OF WORK TO INCLUDE STRUCTURAL SUPPORT UPGRADE OF ROOF STRUCTURE ALONG GRIDLINE 'F' BETWEEN GRID POINT 3.8 TO 7, ADJACENT TO NEW CONCORDIA UNIVERSITY, IN ACCORDANCE WITH SUBMITTED STRUCTURAL ENGINEERING DESIGN CALCS & DETAILS. REMAINDER OF PERMIT AND ALL ATTACHMENTS REMAIN AS ORIGINALLY APPROVED. DRS Remodel a 2,640 sq. ft. portion of the 8,714 sq. ft. shell space created under BLD10-00902 for use by Integrated Design Lab as an office, testing & training facility per the reviewed plans. Compliance with building code for restroom and drinking fountain requirements are part of BLD10-01061 which creates common core area facilities. Work to include select interior demolition; perform structural modifications to portions of roof for new skylights and HVAC units; construction of 2-hour fire barrier walls around the open office / conference room to create a separate 2,118 sq. ft. fire area ( designated as fire area 1B on plans) containing an "A3" occupancy so a fire suppression system is not required. The fire barrier walls will also be a part of a required 1-hour fire rated common exit corridors that will serve this tenant space, existing tenants and future tenant spaces. All doors serving as part of the egress system from the "A3" assembly occupancy to the exit discharge shall be panic hardware if door hardware is provided. Modify electrical, mechanical, plumbing, interior finishes and millwork. Install new stairway at the end of and as part of the rated corridor system created under BLD10-01061 designated on plans as corridor 107 & stair 108. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 7/20/20148/29/2014 DONE
old permit
Second Notice 7/25/20147/15/2014 DONE
DetailsBarbara Stitt
Faxed 7-15-14
First Notice6/24/20146/24/20147/15/2014 DONE
DetailsDave Hannah
BLD-Aging Inspection6/17/20146/17/20146/24/2014 PASS
DetailsDave Hannah
DOC - Permit Finaled6/24/20146/24/20146/24/2014PPASS
DetailsDave Hannah
BLD-Aging Inspection3/18/20143/18/20143/19/2014 PEND
DetailsDave Hannah
BLD-Aging Inspection11/14/201311/14/201311/22/2013 PASS
DetailsDave Hannah
BLD-Aging Inspection2/26/20132/26/20133/1/2013 PASS
DetailsDave Hannah
BLD-Other4/19/20114/20/20114/20/2011ANR
DetailsDave Hannah
jerry - structrual steel inspection Phone #: ###-#### needs to get specal inspection items cleaned up and finish bolting
Plan Reviewer's activity  4/15/2011 DONE
Received copies of partial special inspections for welding & high strength bolting from MTI. Forwarde to Structural Building Inspector, Paul Hannah for his consideration and records.
BLD-Aging Inspection4/6/20114/6/20114/7/2011 DEFR
DetailsDave Hannah
waiting on them to start
CHANGE STATUS TO (ISS)  3/8/2011 DONE
DetailsBarbara Stitt
(F) Reprint permit  3/8/2011 DONE
DetailsBarbara Stitt
Override - Parcel Holds  3/3/2011  
Permit Ready to Issue  3/3/2011  
Telephone call  3/3/2011 DONE
3-3-11 called left message permit ready and fee given ///dld
Plan assigned to (DRS)2/15/20112/15/20113/2/2011 PASS
DetailsDan Stuart
Plan assigned to (DRS)1/18/20111/18/20113/2/2011 PASS
DetailsDan Stuart
PLANS/APPL TAKEN TO FRONT DESK  3/2/2011 PASS
Print Occupancy Form  3/2/2011 DONE
Telephone call  3/1/2011 DONE
Call from Wayne Kohler, CH2MHILL requesting approval for him to contact the design structural engineer directly to discuss concern. I told him that would be fine by e-mail.
Routing - PLAN CHECK3/1/2011 3/1/2011 PASS
DetailsDan Stuart
Structural plan review complete. Routing plans to permit desk to issue permit.
Telephone call  3/1/2011 DONE
Call to Wayne Kohler, Sturctural Plan Review engineer to request a breakdown and value for the time spent with this plan modification review. Left voice message to call me or e-mail me a cost analysis.
Routing Off Site - STRUCTURAL2/15/2011 3/1/2011 PASS
DetailsDan Stuart
Called Action Couriers for Pick up @ 2:50pm
3/1/11 - Received e-mail from Structural Engineering firm performiong the structural plan review stating their review was completed. No further submittals are required.
Telephone call  2/23/2011 DONE
Call from cory, Modus Architects concerning status of review. Structural resubmittal plans still under review by contracted structural engineer.
Telephone call  2/23/2011 DONE
I called contracted structural engineer reviewing structural resubmittal plans to see current status. I was told they would check into status and call me back.
Telephone call  2/23/2011 DONE
Engineer indicated resubmittal review was not complete.
Routing - PLAN CHECK1/19/2011 2/15/2011 FAIL
DetailsDan Stuart
RESUBMITTALS IN RESPONSE TO BUILDING CODE PLAN REVIEW OF 1/19/11 RECEIVED AND RESPONSE TO STRUCTURAL PLAN REVIEW COMMENTS OF 1/12/11. pLANS ROUTING OFF-SITE FOR FOLLOW-UP STRUCTURAL REVIEW OF RESUBMITTALS.
Plan resubmittals received  2/15/2011  
DetailsBarbara Stitt
Received 2 copies of revised cerificate of value, 2 copies of Project Start Up for Special Inspections, 2 copies of snow drift roof strengthening cals, 2 copies of plan check response calcs, 2 copies of sheet A0.1 and taken to Dan Stuart
BLD-Final1/31/20112/1/20112/1/2011APART
DetailsDave Hannah
Wants temp occ plan mod still in review---Jerry-###-#### ok for temp occ
Override - Parcel Holds  2/1/2011  
Temporary Occupancy UNPAID FEE  2/1/2011 DONE
DetailsChristina Prado
Plan resubmittals received  2/1/2011 DONE
DetailsChristina Prado
Recieved letter from Bruce Poe-Architect advising plans for breakroom have changed. The previously proposed breakroom will remain empty pending future TI. Routed letter to Dan S for review.
FIRE-Final Inspection1/31/20111/31/20111/31/2011PPASS
DetailsForrest France
C/N items finished, max. occupant load sign to be posted as discussed.
Override - Parcel Holds  1/31/2011  
FIRE-Final Inspection1/27/20111/28/20111/28/2011AFAIL
DetailsForrest France
Post two fire extinguishers as discussed, install one exit sign at the second classroom exit door per plan. Mechanical inspector to review damper installation.
Plan resubmittals requested  1/28/2011 DONE
Copy of Structural Plan Review Conditions and comments needing to be addressed by Design Professional of Record was e-mailed to Bruce Poe and Cory Nelson, Modus Architects for response.
Routing Off Site - STRUCTURAL1/19/2011 1/28/2011 FAIL
DetailsBarbara Stitt
Called Action courier for pick up on 1-19-11 @2:25pm
1/28/11 - Copy of Structural plan Review received. Resubmittals Required.
FIRE-Final Inspection1/27/20111/27/20111/27/2011PCANC
DetailsForrest France
###-#### - jerry//cancelled by Jerry and rescheduled for tomorrow AM--1/27/11 11:57am leg
Override - Parcel Holds  1/27/2011  
Telephone call  1/27/2011 DONE
Call from Bruce Poe, Modus Architects & Jerry, Contractor, Vertical construction. Contractor wants inspection by fire inspector for IDL but there is a hold on inspections due to the submittal of structural roof system upgrade next to new Concordia University that was allowed to be added to the open permit for IDL. The structural upgrade area is several hundred feet away from the IDL tenant space and the inspection for the tenant space will not be affected by inspections for a temporary occupancy while the required resubmittals for the structural upgrade are prepared and resubmitted. A permanent certificate of occupancy cannot be issued for IDL until the attached plan mod and all required work completed and approved by required inspectors. Permit counter working with contractor (Jerry) Vertical Construction to scheduel inspections.
Override - Parcel Holds  1/27/2011  
Plan resubmittals requested  1/19/2011 DONE
Resubmittals required. Need Special Inspection requirements called out on plans and a completed "Project Start Up For Special Inspection" form, 2 copies. E-mailed architect of requirements.
Routing - PLAN CHECK1/18/2011 1/19/2011 FAIL
DetailsDan Stuart
PLAN MOD ADDING STRUCTURAL ROOF UPGRADE ALONG GRID LINE 'f' FROM 3.8 TO 7, TO REINFORCE STRUCTURE TO CARRY NEW DRIFTING SNOW LOADS CREATED BY NEW ADJACENT CONCORDIA UNIVERSITY BUILDING. Special Inspection required. Specifics for special inspection and Project Start Up for Special Inspection was not provided. Routing off-site for structural plan review.
Plan Modification Accepted  1/18/2011 DONE
DetailsBarbara Stitt
Plan modification accepted for the addition of structural bracing along the east wall. PLan mod app with new cert of value, sheet A0.1, partial roof plan, structural calcs were submitted.
Plan Modification Accepted  1/18/2011 DONE
DetailsDan Stuart
Plan sheet and engineering calcs & design submitted for structural roof upgrade along grid line 'F' from 3.8 to 7, to support new added drifting snow loads created by new adjacent building.
BLD-Other12/13/201012/14/201012/14/2010APASS
DetailsJim Storey
Jerry this is for fire wall inspection Phone #: ###-#### ok for 2 nd layer per plan.
BLD-Conference12/8/201012/9/201012/9/2010APASS
DetailsDave Hannah
jerry Phone #: ###-#### shaft wall on back side of two hr wall ok to cover
BLD-Framing/Rough-in12/8/201012/9/201012/9/2010APASS
DetailsDave Hannah
jerry Phone #: ###-#### ceiling framing ok also shaft wall on back side of two hr wall ok to cover
FIRE-Conference12/8/201012/9/201012/9/2010ADONE
DetailsForrest France
Regarding smoke detectors at new dampers in the rated wall.
BLD-Conference11/30/201012/1/201012/1/2010APASS
DetailsDave Hannah
Jerry Phone #: ###-#### ok to build a 2hr sheetrock assembly between roof joist
Issue PAID IN FULL permit  11/30/2010 DONE
DetailsChristina Prado
Telephone call  11/22/2010 DONE
DetailsTisha Gallop
spoke to Cory Nelson/arch. rep. and told him permit is ready, fees, and need ACHD.
Permit Ready to Issue  11/22/2010 DONE
DetailsTisha Gallop
Routing - FIRE11/18/2010 11/19/2010 PASS
DetailsScott Arellano
Attached updated IFC comments to plans
Routing - PLAN CHECK11/19/2010 11/19/2010 PASS
DetailsDan Stuart
To permit desk to issue opermit.
PLANS/APPL TAKEN TO FRONT DESK  11/19/2010 PASS
Plan assigned to (DRS)5/13/2010 11/19/2010 PASS
DetailsDan Stuart
Routing - PLAN CHECK10/20/2010 11/18/2010 PASS
DetailsDan Stuart
New plan sheets inserted into original plans. Plan review comments and permit scope modified based on resubmittals. Plans routed to fire code analyst for re-review.
Plan resubmittals received  11/12/2010  
DetailsBarbara Stitt
Received 2 copies of plan review response dated 11-9-10 from Modus Architecture, Major Tenant Improvement App,Structrural Engeering Calcs, Sheets, A0.0, A0.1, A0.2, A1.0, A2.0, A3.0, A3.1, A4.0, A5.0, A5.1, A6.0, A6.1, S1.0, M0.0, M0.2, M2.D, M2.1, M2.2, M3.2, E1.0, E2.0, E3.0, E4.0, E5.0
Routing - FIRE10/15/2010 10/20/2010 FAIL
DetailsScott Arellano
Routed back to plan check until Occupancy classification has been resolved by architect. Final occupancy classification will significantly affect the final plan review conducted by Fire.
Telephone call  10/15/2010 DONE
Call from Bruce Poe, Modus architects concerning the IDL project and what would be needed to make the occupant load of Classroom 109 greater than 50. I reviewed the original plan review requirements with him and told him I would e-mail a copy of mu second review to him as well as Cory. Changing the occupant load back to more than 50 will require a new plan review and submittals if this is done. Notified jason Blais of Bruce Poes question.
Routing - PLAN CHECK6/15/2010 10/15/2010 FAIL
DetailsDan Stuart
Resubmittals of 10/5/10 inserted into plans. Resubmittals were not complete or correct. Modification to occupancy use classification made based on several phone conversations with Cory Nelson. Copy of second plan review e-mailed to Bruce Poe & cory Nelson. plans routed back to fire code analyst.
Plan Reviewer's activity  10/14/2010 DONE
To Cory Nelson after discussion with Jason Blais, Building Official.
Cory - we understand that IDL understands the limitation of the occupant load to be 49 or less based on size of room and occupancy use category, "B", now desired, to alleviate code requirements that are applicable to an "A3" occupancy as original plans submitted indicate. The letter sholud be on U of I letterhead and signed by Mr. Wymelenberg for IDL and by responsible representative of U of I setting up and operating the classroom or IDL & U of I responsible parties could submit there specific own acknowledgement and signature but the permit could not be issued until both acceptable letters were received and approved.

Include the following:
The undersigned, representing Integrated Design Lab and University of Idaho - Section 105.4, Validity of Permit & Section 110.4 Revocation (of occupancy certificate).
Plan Reviewer's activity  10/13/2010 DONE
Received e-mail from Cory Nelson indicating that the room would be less than 750 sq. ft. and using the occupant load factor for a classroom, 20 per Tbl 1004.1.1, the occupant load would be a maximum of 49 and then qualify as a "B" occupancy. The previous design submittal data had use an occupant load factor of 7 and the architect declared the tenant needed a minimum occupant load of 107.
Plan Reviewer's activity  10/13/2010 DONE
I e-mailed Cory Nelson asking how the change in occupant load, from 107 to 49, would be monitored and would require a letter from U of I, user of classroom, responsible person indicating they were aware of and agreed to the limiting of the classroom occupant load to 49.
Plan Reviewer's activity  10/13/2010 DONE
Cory Nelson e-mailed back stating that IDL (Integrated Design Lab) is independant of U of I, but IDL is operated by U of I. Kevin Van Den Wymeleberg is the director of IDL and will be the person signing the letter.
Plan Reviewer's activity  10/12/2010 DONE
Reviewed plan resubmittal from architect reducing the area of the classroom (109) to be less than 750 sq. ft. but with a continuing high occupant load of 107 required, siting section 303.1, exc. #1 to reclasify the room as a "B" occupancy. Noted code section indicates that if the classroom is accessory to another occupancy, i.e. not having the classroom would not effect the main use being for office. The classroom is necessary and appears in fact to be the primary use which the office supports. With an occupant load of 50 or greater, this remains and "A3" occupancy. E-mailed this interpretation as to occupancy use of classroom to Cory Nelson, Modus Arch.
Plan resubmittals received  10/5/2010  
DetailsBarbara Stitt
Received 2 copies of transmittal response letter dated 9-29-10 (4 pgs), 2 copies of page 2 of major TI application. 2 copies of cert of value, 2 copies of response letter dated 10-5-10 from Tamarack Grove Engineering (2 pgs), 2 copies of response letter dated 9-22-10 from Mulder Engineering Inc, 2 copies of sheets A0.0, A0.1, A0.2, A1.0, A2.0, A4.0, M0.0, M0.2, M2.DM2.1, M2.2, M3.2 and taken to Dan Stuart on 10-5-10 @ 3:10pm
Route to Impact Fee Review6/10/20106/15/20106/15/2010 PASS
DetailsCindy M. Gould
Tenant improvement no impact fees
Routing - FIRE6/10/20106/10/20106/15/2010 FAIL
DetailsScott Arellano
Faxed and emailed resubmittal items to architect.
1st review completed  6/15/2010 FAIL
Failed Plan Check, Fire
Plan resubmittals requested  6/10/2010 DONE
Copy of plan review e-mailed to architect.
Routing - PLAN CHECK5/17/2010 6/10/2010 FAIL
DetailsDan Stuart
Resubmittals required. Plan review e-mailed to architect. Plans routing to fire code analyst for review.
Routing - Design Review5/17/2010 5/17/2010 PASS
DetailsJosh Wilson
Josh Wilson - DRH10-00073
Routing PW Sewer Rating5/14/2010 5/17/2010 PASS
DetailsConnie Baumgartner
Plan resubmittals received  5/17/2010 DONE
DetailsTisha Gallop
received transmittal, ESC application and waiver letter (ESC10-00403), and four copies of plan sheets A0.0, M2.1, M3.1; taken to Tim Woodard.
Routing - PUBLIC WORKS5/17/2010 5/17/2010 PASS
DetailsBeverly Mountain
Routing - PUBLIC WORKS5/13/2010 5/14/2010 PASS
DetailsApril Wing
Address was change from 314 s 6th St to 306 S 6th St 1/4/2011
Pending Assignment by JCB5/12/2010 5/13/2010 DONE
DetailsJason Blais
Application received 5/12/20105/12/2010 DONE
DetailsTisha Gallop
Plans ACCEPTED BY PLAN TECH  5/12/2010 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  5/12/2010 DONE
DetailsTisha Gallop
Intake Approval  5/12/2010 PASS
DetailsTim L. Woodard
Intake approved. ESC Waiver Previously approved under Shell and Core permit (ESC10-00345). Verified ok with Steve Webb. TLW