Third Notice | | 7/20/2014 | 8/29/2014 | | DONE |
|
|
|
old permit
|
Second Notice | | 7/25/2014 | 7/15/2014 | | DONE |
Barbara Stitt
|
|
|
Faxed 7-15-14
|
First Notice | 6/24/2014 | 6/24/2014 | 7/15/2014 | | DONE |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 6/17/2014 | 6/17/2014 | 6/24/2014 | | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 6/24/2014 | 6/24/2014 | 6/24/2014 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 3/18/2014 | 3/18/2014 | 3/19/2014 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 11/14/2013 | 11/14/2013 | 11/22/2013 | | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 2/26/2013 | 2/26/2013 | 3/1/2013 | | PASS |
Dave Hannah
|
|
|
|
BLD-Other | 4/19/2011 | 4/20/2011 | 4/20/2011 | A | NR |
Dave Hannah
|
|
|
jerry - structrual steel inspection Phone #: ###-#### needs to get specal inspection items cleaned up and finish bolting
|
Plan Reviewer's activity | | | 4/15/2011 | | DONE |
|
|
|
Received copies of partial special inspections for welding & high strength bolting from MTI. Forwarde to Structural Building Inspector, Paul Hannah for his consideration and records.
|
BLD-Aging Inspection | 4/6/2011 | 4/6/2011 | 4/7/2011 | | DEFR |
Dave Hannah
|
|
|
waiting on them to start
|
CHANGE STATUS TO (ISS) | | | 3/8/2011 | | DONE |
Barbara Stitt
|
|
|
|
(F) Reprint permit | | | 3/8/2011 | | DONE |
Barbara Stitt
|
|
|
|
Override - Parcel Holds | | | 3/3/2011 | | |
|
|
|
|
Permit Ready to Issue | | | 3/3/2011 | | |
|
|
|
|
Telephone call | | | 3/3/2011 | | DONE |
|
|
|
3-3-11 called left message permit ready and fee given ///dld
|
Plan assigned to (DRS) | 2/15/2011 | 2/15/2011 | 3/2/2011 | | PASS |
Dan Stuart
|
|
|
|
Plan assigned to (DRS) | 1/18/2011 | 1/18/2011 | 3/2/2011 | | PASS |
Dan Stuart
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/2/2011 | | PASS |
|
|
|
|
Print Occupancy Form | | | 3/2/2011 | | DONE |
|
|
|
|
Telephone call | | | 3/1/2011 | | DONE |
|
|
|
Call from Wayne Kohler, CH2MHILL requesting approval for him to contact the design structural engineer directly to discuss concern. I told him that would be fine by e-mail.
|
Routing - PLAN CHECK | 3/1/2011 | | 3/1/2011 | | PASS |
Dan Stuart
|
|
|
Structural plan review complete. Routing plans to permit desk to issue permit.
|
Telephone call | | | 3/1/2011 | | DONE |
|
|
|
Call to Wayne Kohler, Sturctural Plan Review engineer to request a breakdown and value for the time spent with this plan modification review. Left voice message to call me or e-mail me a cost analysis.
|
Routing Off Site - STRUCTURAL | 2/15/2011 | | 3/1/2011 | | PASS |
Dan Stuart
|
|
|
Called Action Couriers for Pick up @ 2:50pm
3/1/11 - Received e-mail from Structural Engineering firm performiong the structural plan review stating their review was completed. No further submittals are required.
|
Telephone call | | | 2/23/2011 | | DONE |
|
|
|
Call from cory, Modus Architects concerning status of review. Structural resubmittal plans still under review by contracted structural engineer.
|
Telephone call | | | 2/23/2011 | | DONE |
|
|
|
I called contracted structural engineer reviewing structural resubmittal plans to see current status. I was told they would check into status and call me back.
|
Telephone call | | | 2/23/2011 | | DONE |
|
|
|
Engineer indicated resubmittal review was not complete.
|
Routing - PLAN CHECK | 1/19/2011 | | 2/15/2011 | | FAIL |
Dan Stuart
|
|
|
RESUBMITTALS IN RESPONSE TO BUILDING CODE PLAN REVIEW OF 1/19/11 RECEIVED AND RESPONSE TO STRUCTURAL PLAN REVIEW COMMENTS OF 1/12/11. pLANS ROUTING OFF-SITE FOR FOLLOW-UP STRUCTURAL REVIEW OF RESUBMITTALS.
|
Plan resubmittals received | | | 2/15/2011 | | |
Barbara Stitt
|
|
|
Received 2 copies of revised cerificate of value, 2 copies of Project Start Up for Special Inspections, 2 copies of snow drift roof strengthening cals, 2 copies of plan check response calcs, 2 copies of sheet A0.1 and taken to Dan Stuart
|
BLD-Final | 1/31/2011 | 2/1/2011 | 2/1/2011 | A | PART |
Dave Hannah
|
|
|
Wants temp occ plan mod still in review---Jerry-###-#### ok for temp occ
|
Override - Parcel Holds | | | 2/1/2011 | | |
|
|
|
|
Temporary Occupancy UNPAID FEE | | | 2/1/2011 | | DONE |
Christina Prado
|
|
|
|
Plan resubmittals received | | | 2/1/2011 | | DONE |
Christina Prado
|
|
|
Recieved letter from Bruce Poe-Architect advising plans for breakroom have changed. The previously proposed breakroom will remain empty pending future TI. Routed letter to Dan S for review.
|
FIRE-Final Inspection | 1/31/2011 | 1/31/2011 | 1/31/2011 | P | PASS |
Forrest France
|
|
|
C/N items finished, max. occupant load sign to be posted as discussed.
|
Override - Parcel Holds | | | 1/31/2011 | | |
|
|
|
|
FIRE-Final Inspection | 1/27/2011 | 1/28/2011 | 1/28/2011 | A | FAIL |
Forrest France
|
|
|
Post two fire extinguishers as discussed, install one exit sign at the second classroom exit door per plan. Mechanical inspector to review damper installation.
|
Plan resubmittals requested | | | 1/28/2011 | | DONE |
|
|
|
Copy of Structural Plan Review Conditions and comments needing to be addressed by Design Professional of Record was e-mailed to Bruce Poe and Cory Nelson, Modus Architects for response.
|
Routing Off Site - STRUCTURAL | 1/19/2011 | | 1/28/2011 | | FAIL |
Barbara Stitt
|
|
|
Called Action courier for pick up on 1-19-11 @2:25pm
1/28/11 - Copy of Structural plan Review received. Resubmittals Required.
|
FIRE-Final Inspection | 1/27/2011 | 1/27/2011 | 1/27/2011 | P | CANC |
Forrest France
|
|
|
###-#### - jerry//cancelled by Jerry and rescheduled for tomorrow AM--1/27/11 11:57am leg
|
Override - Parcel Holds | | | 1/27/2011 | | |
|
|
|
|
Telephone call | | | 1/27/2011 | | DONE |
|
|
|
Call from Bruce Poe, Modus Architects & Jerry, Contractor, Vertical construction. Contractor wants inspection by fire inspector for IDL but there is a hold on inspections due to the submittal of structural roof system upgrade next to new Concordia University that was allowed to be added to the open permit for IDL. The structural upgrade area is several hundred feet away from the IDL tenant space and the inspection for the tenant space will not be affected by inspections for a temporary occupancy while the required resubmittals for the structural upgrade are prepared and resubmitted. A permanent certificate of occupancy cannot be issued for IDL until the attached plan mod and all required work completed and approved by required inspectors. Permit counter working with contractor (Jerry) Vertical Construction to scheduel inspections.
|
Override - Parcel Holds | | | 1/27/2011 | | |
|
|
|
|
Plan resubmittals requested | | | 1/19/2011 | | DONE |
|
|
|
Resubmittals required. Need Special Inspection requirements called out on plans and a completed "Project Start Up For Special Inspection" form, 2 copies. E-mailed architect of requirements.
|
Routing - PLAN CHECK | 1/18/2011 | | 1/19/2011 | | FAIL |
Dan Stuart
|
|
|
PLAN MOD ADDING STRUCTURAL ROOF UPGRADE ALONG GRID LINE 'f' FROM 3.8 TO 7, TO REINFORCE STRUCTURE TO CARRY NEW DRIFTING SNOW LOADS CREATED BY NEW ADJACENT CONCORDIA UNIVERSITY BUILDING. Special Inspection required. Specifics for special inspection and Project Start Up for Special Inspection was not provided. Routing off-site for structural plan review.
|
Plan Modification Accepted | | | 1/18/2011 | | DONE |
Barbara Stitt
|
|
|
Plan modification accepted for the addition of structural bracing along the east wall. PLan mod app with new cert of value, sheet A0.1, partial roof plan, structural calcs were submitted.
|
Plan Modification Accepted | | | 1/18/2011 | | DONE |
Dan Stuart
|
|
|
Plan sheet and engineering calcs & design submitted for structural roof upgrade along grid line 'F' from 3.8 to 7, to support new added drifting snow loads created by new adjacent building.
|
BLD-Other | 12/13/2010 | 12/14/2010 | 12/14/2010 | A | PASS |
Jim Storey
|
|
|
Jerry this is for fire wall inspection Phone #: ###-#### ok for 2 nd layer per plan.
|
BLD-Conference | 12/8/2010 | 12/9/2010 | 12/9/2010 | A | PASS |
Dave Hannah
|
|
|
jerry Phone #: ###-#### shaft wall on back side of two hr wall ok to cover
|
BLD-Framing/Rough-in | 12/8/2010 | 12/9/2010 | 12/9/2010 | A | PASS |
Dave Hannah
|
|
|
jerry Phone #: ###-#### ceiling framing ok also shaft wall on back side of two hr wall ok to cover
|
FIRE-Conference | 12/8/2010 | 12/9/2010 | 12/9/2010 | A | DONE |
Forrest France
|
|
|
Regarding smoke detectors at new dampers in the rated wall.
|
BLD-Conference | 11/30/2010 | 12/1/2010 | 12/1/2010 | A | PASS |
Dave Hannah
|
|
|
Jerry Phone #: ###-#### ok to build a 2hr sheetrock assembly between roof joist
|
Issue PAID IN FULL permit | | | 11/30/2010 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 11/22/2010 | | DONE |
Tisha Gallop
|
|
|
spoke to Cory Nelson/arch. rep. and told him permit is ready, fees, and need ACHD.
|
Permit Ready to Issue | | | 11/22/2010 | | DONE |
Tisha Gallop
|
|
|
|
Routing - FIRE | 11/18/2010 | | 11/19/2010 | | PASS |
Scott Arellano
|
|
|
Attached updated IFC comments to plans
|
Routing - PLAN CHECK | 11/19/2010 | | 11/19/2010 | | PASS |
Dan Stuart
|
|
|
To permit desk to issue opermit.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/19/2010 | | PASS |
|
|
|
|
Plan assigned to (DRS) | 5/13/2010 | | 11/19/2010 | | PASS |
Dan Stuart
|
|
|
|
Routing - PLAN CHECK | 10/20/2010 | | 11/18/2010 | | PASS |
Dan Stuart
|
|
|
New plan sheets inserted into original plans. Plan review comments and permit scope modified based on resubmittals. Plans routed to fire code analyst for re-review.
|
Plan resubmittals received | | | 11/12/2010 | | |
Barbara Stitt
|
|
|
Received 2 copies of plan review response dated 11-9-10 from Modus Architecture, Major Tenant Improvement App,Structrural Engeering Calcs, Sheets, A0.0, A0.1, A0.2, A1.0, A2.0, A3.0, A3.1, A4.0, A5.0, A5.1, A6.0, A6.1, S1.0, M0.0, M0.2, M2.D, M2.1, M2.2, M3.2, E1.0, E2.0, E3.0, E4.0, E5.0
|
Routing - FIRE | 10/15/2010 | | 10/20/2010 | | FAIL |
Scott Arellano
|
|
|
Routed back to plan check until Occupancy classification has been resolved by architect. Final occupancy classification will significantly affect the final plan review conducted by Fire.
|
Telephone call | | | 10/15/2010 | | DONE |
|
|
|
Call from Bruce Poe, Modus architects concerning the IDL project and what would be needed to make the occupant load of Classroom 109 greater than 50. I reviewed the original plan review requirements with him and told him I would e-mail a copy of mu second review to him as well as Cory. Changing the occupant load back to more than 50 will require a new plan review and submittals if this is done. Notified jason Blais of Bruce Poes question.
|
Routing - PLAN CHECK | 6/15/2010 | | 10/15/2010 | | FAIL |
Dan Stuart
|
|
|
Resubmittals of 10/5/10 inserted into plans. Resubmittals were not complete or correct. Modification to occupancy use classification made based on several phone conversations with Cory Nelson. Copy of second plan review e-mailed to Bruce Poe & cory Nelson. plans routed back to fire code analyst.
|
Plan Reviewer's activity | | | 10/14/2010 | | DONE |
|
|
|
To Cory Nelson after discussion with Jason Blais, Building Official.
Cory - we understand that IDL understands the limitation of the occupant load to be 49 or less based on size of room and occupancy use category, "B", now desired, to alleviate code requirements that are applicable to an "A3" occupancy as original plans submitted indicate. The letter sholud be on U of I letterhead and signed by Mr. Wymelenberg for IDL and by responsible representative of U of I setting up and operating the classroom or IDL & U of I responsible parties could submit there specific own acknowledgement and signature but the permit could not be issued until both acceptable letters were received and approved.
Include the following:
The undersigned, representing Integrated Design Lab and University of Idaho - Section 105.4, Validity of Permit & Section 110.4 Revocation (of occupancy certificate).
|
Plan Reviewer's activity | | | 10/13/2010 | | DONE |
|
|
|
Received e-mail from Cory Nelson indicating that the room would be less than 750 sq. ft. and using the occupant load factor for a classroom, 20 per Tbl 1004.1.1, the occupant load would be a maximum of 49 and then qualify as a "B" occupancy. The previous design submittal data had use an occupant load factor of 7 and the architect declared the tenant needed a minimum occupant load of 107.
|
Plan Reviewer's activity | | | 10/13/2010 | | DONE |
|
|
|
I e-mailed Cory Nelson asking how the change in occupant load, from 107 to 49, would be monitored and would require a letter from U of I, user of classroom, responsible person indicating they were aware of and agreed to the limiting of the classroom occupant load to 49.
|
Plan Reviewer's activity | | | 10/13/2010 | | DONE |
|
|
|
Cory Nelson e-mailed back stating that IDL (Integrated Design Lab) is independant of U of I, but IDL is operated by U of I. Kevin Van Den Wymeleberg is the director of IDL and will be the person signing the letter.
|
Plan Reviewer's activity | | | 10/12/2010 | | DONE |
|
|
|
Reviewed plan resubmittal from architect reducing the area of the classroom (109) to be less than 750 sq. ft. but with a continuing high occupant load of 107 required, siting section 303.1, exc. #1 to reclasify the room as a "B" occupancy. Noted code section indicates that if the classroom is accessory to another occupancy, i.e. not having the classroom would not effect the main use being for office. The classroom is necessary and appears in fact to be the primary use which the office supports. With an occupant load of 50 or greater, this remains and "A3" occupancy. E-mailed this interpretation as to occupancy use of classroom to Cory Nelson, Modus Arch.
|
Plan resubmittals received | | | 10/5/2010 | | |
Barbara Stitt
|
|
|
Received 2 copies of transmittal response letter dated 9-29-10 (4 pgs), 2 copies of page 2 of major TI application. 2 copies of cert of value, 2 copies of response letter dated 10-5-10 from Tamarack Grove Engineering (2 pgs), 2 copies of response letter dated 9-22-10 from Mulder Engineering Inc, 2 copies of sheets A0.0, A0.1, A0.2, A1.0, A2.0, A4.0, M0.0, M0.2, M2.DM2.1, M2.2, M3.2 and taken to Dan Stuart on 10-5-10 @ 3:10pm
|
Route to Impact Fee Review | 6/10/2010 | 6/15/2010 | 6/15/2010 | | PASS |
Cindy M. Gould
|
|
|
Tenant improvement no impact fees
|
Routing - FIRE | 6/10/2010 | 6/10/2010 | 6/15/2010 | | FAIL |
Scott Arellano
|
|
|
Faxed and emailed resubmittal items to architect.
|
1st review completed | | | 6/15/2010 | | FAIL |
|
|
|
Failed Plan Check, Fire
|
Plan resubmittals requested | | | 6/10/2010 | | DONE |
|
|
|
Copy of plan review e-mailed to architect.
|
Routing - PLAN CHECK | 5/17/2010 | | 6/10/2010 | | FAIL |
Dan Stuart
|
|
|
Resubmittals required. Plan review e-mailed to architect. Plans routing to fire code analyst for review.
|
Routing - Design Review | 5/17/2010 | | 5/17/2010 | | PASS |
Josh Wilson
|
|
|
Josh Wilson - DRH10-00073
|
Routing PW Sewer Rating | 5/14/2010 | | 5/17/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Plan resubmittals received | | | 5/17/2010 | | DONE |
Tisha Gallop
|
|
|
received transmittal, ESC application and waiver letter (ESC10-00403), and four copies of plan sheets A0.0, M2.1, M3.1; taken to Tim Woodard.
|
Routing - PUBLIC WORKS | 5/17/2010 | | 5/17/2010 | | PASS |
Beverly Mountain
|
|
|
|
Routing - PUBLIC WORKS | 5/13/2010 | | 5/14/2010 | | PASS |
April Wing
|
|
|
Address was change from 314 s 6th St to 306 S 6th St 1/4/2011
|
Pending Assignment by JCB | 5/12/2010 | | 5/13/2010 | | DONE |
Jason Blais
|
|
|
|
Application received | | 5/12/2010 | 5/12/2010 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/12/2010 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/12/2010 | | DONE |
Tisha Gallop
|
|
|
|
Intake Approval | | | 5/12/2010 | | PASS |
Tim L. Woodard
|
|
|
Intake approved. ESC Waiver Previously approved under Shell and Core permit (ESC10-00345). Verified ok with Steve Webb. TLW
|