Letter of compliance/Occupancy | | | 3/11/2013 | | |
|
|
|
|
BLD-Final | 11/10/2010 | 11/10/2010 | 11/10/2010 | P | PASS |
Jim Storey
|
|
|
fred Phone #: ###-####
|
DOC - Permit Finaled | 11/10/2010 | 11/10/2010 | 11/10/2010 | P | PASS |
Jim Storey
|
|
|
|
BLD-Conference | 11/4/2010 | 11/4/2010 | 11/4/2010 | P | PASS |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 11/2/2010 | 11/2/2010 | 11/4/2010 | | PASS |
Jim Storey
|
|
|
|
BLD-Energy code compliance | 8/20/2010 | 8/20/2010 | 8/20/2010 | P | PASS |
Jim Storey
|
|
|
Fred Phone #: ###-####
|
BLD-Framing/Rough-in | 8/19/2010 | 8/20/2010 | 8/20/2010 | A | PASS |
Jim Storey
|
|
|
Fred Phone #: ###-####
|
BLD-Conference | 8/12/2010 | 8/12/2010 | 8/12/2010 | A | PASS |
Jim Storey
|
|
|
exterior ok to cover
|
BLD-Other | 8/11/2010 | 8/11/2010 | 8/12/2010 | P | CANC |
Jim Storey
|
|
|
shear wall insp//Fred Phone #: ###-####
|
BLD-Other | 8/5/2010 | 8/5/2010 | 8/6/2010 | P | FAIL |
Dave Hannah
|
|
|
Fred Phone #: ###-#### talked with super told him the dosent do shear inspections but I would look that this house . after looking at the shear I told the super it was not per the plans . he wanted a c/n so I wrote him one.
|
BLD-Footing | 7/7/2010 | 7/7/2010 | 7/7/2010 | P | PASS |
Jim Storey
|
|
|
Bill Phone #: ###-####
|
OVERRIDE | | | 7/6/2010 | | |
|
|
|
|
Route to Impact Fee Review | 7/6/2010 | 7/9/2010 | 7/6/2010 | | PASS |
Cindy M. Gould
|
|
|
|
Plan assigned to (PEP) | 7/6/2010 | 7/6/2010 | 7/6/2010 | | PASS |
Perry Paine
|
|
|
7/6/2010 13:27:58 PEP - activity updated through activity BLDA022 from case BLD10-01064.
|
Routing - PLAN CHECK | 7/6/2010 | | 7/6/2010 | | PASS |
Perry Paine
|
|
|
|
Case Summary (BLD) | | | 7/6/2010 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/6/2010 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 7/6/2010 | | |
|
|
|
|
Inspection Record Card- Bld | | | 7/6/2010 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/6/2010 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/6/2010 | | DONE |
|
|
|
|
Plan resubmittals received | | | 6/30/2010 | | DONE |
|
|
|
received 2 sets of new residential plans sent to Carl M.
|
Plan resubmittals received | | | 6/30/2010 | | |
|
|
|
received 2 sets of new residential plans sent to Carl M.
|
Plan resubmittals received | | | 6/30/2010 | | |
|
|
|
received 2 sets of new residential plans sent to Carl M.
|
Plan assigned to (CDM) | 5/27/2010 | 5/27/2010 | 6/11/2010 | | FAIL |
Carl D Madsen
|
|
|
Structure is required to meet the provisions of the WUI code for zone. CDM
|
Routing - PLAN CHECK | 6/2/2010 | | 6/11/2010 | | FAIL |
Carl D Madsen
|
|
|
Structure is required to meet the provisions of the WUI code for zone B. CDM
|
1st review completed | | | 6/11/2010 | | DONE |
|
|
|
Structure is required to meet the provisions of the WUI code for zone B. CDM
|
Routing - PLANNING | 6/9/2010 | | 6/9/2010 | | PASS |
David Moser
|
|
|
New floor plans indicate that garage complies with width requiremnets (20 feet). The property is in WUI Area B. The house is still 40 feet wide and 5 foot side yard setbacks still compy.
|
Routing - PLANNING | 6/1/2010 | | 6/2/2010 | | FAIL |
Colleen T Carroll
|
|
|
Failed; need 20 foot interior garage width. call applicant on 6-2-10 at 130pm.
|
Routing - PUBLIC WORKS | 5/28/2010 | | 6/1/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 5/27/2010 | | 5/28/2010 | | PASS |
April Wing
|
|
|
|
Intake Approval | | | 5/12/2010 | | PASS |
|
|
|
ok per Carl Madsen to let come in with out energy code.dld
|
Application received | | 5/12/2010 | | | |
|
|
|
|