BLD-Final | 11/10/2010 | 11/10/2010 | 11/10/2010 | P | PASS |
Jim Storey
|
|
|
fred Phone #: ###-####
|
DOC - Permit Finaled | 11/10/2010 | 11/10/2010 | 11/10/2010 | P | PASS |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 11/3/2010 | 11/3/2010 | 11/3/2010 | | PASS |
Jim Storey
|
|
|
|
BLD-Energy code compliance | 8/27/2010 | 8/27/2010 | 8/30/2010 | P | PASS |
Jim Storey
|
|
|
Fred Phone #: ###-####
|
BLD-Framing/Rough-in | 8/24/2010 | 8/25/2010 | 8/25/2010 | A | PART |
Jim Storey
|
|
|
Ollie Phone #: ###-#### pending mech c/n ok to insulate.
|
BLD-Framing/Rough-in | 8/24/2010 | 8/25/2010 | 8/25/2010 | A | PART |
Jim Storey
|
|
|
Fred Phone #: ###-#### pending mech c/n ok to insulate.
|
BLD-Framing/Rough-in | 8/24/2010 | 8/24/2010 | 8/24/2010 | P | PART |
Jim Storey
|
|
|
Fred Phone #: ###-#### defered for mech insp. need truss engineering to check girders.
|
OVERRIDE | | | 7/17/2010 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 7/17/2010 | | DONE |
|
|
|
|
BLD-Footing | 7/7/2010 | 7/7/2010 | 7/7/2010 | P | PASS |
Jim Storey
|
|
|
Bill Phone #: ###-####
|
Plan assigned to (PEP) | 7/6/2010 | 7/6/2010 | 7/6/2010 | | PASS |
Perry Paine
|
|
|
7/6/2010 16:16:21 PEP - activity updated through activity BLDA022 from case BLD10-01066.
|
Plan assigned to (CDM) | 5/27/2010 | 5/27/2010 | 7/6/2010 | | PASS |
Perry Paine
|
|
|
7/6/2010 16:16:21 PEP - activity updated through activity BLDA022 from case BLD10-01066.
|
Case Summary (BLD) | | | 7/6/2010 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/6/2010 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/6/2010 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/6/2010 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/6/2010 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/2/2010 | | 6/14/2010 | | FAIL |
Carl D Madsen
|
|
|
Wall bracing is not addressed on the plans or in the calculations. Foundation depth shown at 18" depth is required to be 24" below finished grade. 6-13-10 CDM
|
1st review completed | | | 6/14/2010 | | FAIL |
|
|
|
Wall bracing is not addressed on the plans or in the calculations. Foundation depth shown at 18" depth is required to be 24" below finished grade. 6-13-10 CDM
|
Route to Impact Fee Review | 5/12/2010 | 5/17/2010 | 6/3/2010 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLANNING | 6/1/2010 | | 6/2/2010 | | PASS |
Colleen T Carroll
|
|
|
|
Routing - PUBLIC WORKS | 5/28/2010 | | 6/1/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 5/27/2010 | | 5/28/2010 | | PASS |
April Wing
|
|
|
|
Intake Approval | | | 5/27/2010 | | PASS |
Darla L Downs
|
|
|
|
Application received | | 5/12/2010 | 5/12/2010 | | DONE |
Darla L Downs
|
|
|
|
Intake Approval | | | 5/12/2010 | | FAIL |
|
|
|
5-27-10 ok per Carl Madsen to send through with out energy code. dld
|