Third Notice | | 10/26/2010 | 10/18/2010 | | DONE |
|
|
|
|
Third Notice | | 10/5/2010 | 10/12/2010 | | DONE |
|
|
|
faxed
|
Second Notice | | 9/19/2010 | 9/30/2010 | | DONE |
|
|
|
|
First Notice | | 9/6/2010 | 9/9/2010 | | DONE |
|
|
|
|
Permanent Occupancy | | | 8/27/2010 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 8/26/2010 | 8/26/2010 | 8/26/2010 | P | PASS |
Dave Hannah
|
|
|
Don ###-####
|
Plan resubmittals received | | | 8/19/2010 | | DONE |
Tisha Gallop
|
|
|
additional info requested by pluming department; received two copies of letter from mechanical engineer addressing lavatory sinks. Put on Lee Rice's desk.
|
BLD-Final | 8/11/2010 | 8/12/2010 | 8/12/2010 | P | PART |
Dave Hannah
|
|
|
Don Phone #: ###-#### ok for temp occ needs other trades to go perm and fix ada restrooms
|
FIRE-Final Inspection | 8/11/2010 | 8/12/2010 | 8/12/2010 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Previous items on the correction notice have been addressed.
|
Temporary Occupancy | 8/12/2010 | 11/10/2010 | 8/12/2010 | | DONE |
Tisha Gallop
|
|
|
|
FIRE-Final Inspection | 8/9/2010 | 8/10/2010 | 8/11/2010 | P | FAIL |
Forrest France
|
|
|
See activity notes 8/11.
|
FIRE-Final Inspection | 8/11/2010 | 8/11/2010 | 8/11/2010 | P | FAIL |
Forrest France
|
|
|
Post two fire extinguishers per plan annotations, remove one exit sign per review comments and plan resubmittal sheet A4.0, provide exit discharge lighting at the west exit, post address numbers. Remainder of life safety items passed.
|
Zoning Approval | 8/10/2010 | 8/10/2010 | 8/10/2010 | | PASS |
Josh Wilson
|
|
|
|
FIRE-Conference | 7/22/2010 | 7/22/2010 | 7/23/2010 | P | DONE |
Forrest France
|
|
|
Regarding type one hood suppression system.
|
Print Occupancy Form | | | 7/7/2010 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 7/7/2010 | | |
|
|
|
|
Permit Ready to Issue | | | 7/7/2010 | | DONE |
|
|
|
|
Telephone call | | | 7/7/2010 | | DONE |
|
|
|
lm for jeffery permit ready fees given
|
CHANGE STATUS TO (ISS) | | | 7/7/2010 | | DONE |
Tisha Gallop
|
|
|
picked up and paid for plan mod
|
Case Summary (BLD) | | | 7/7/2010 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (TLW) | 6/23/2010 | | 7/6/2010 | | PASS |
Tim L. Woodard
|
|
|
7/6/2010 15:16:23 TLW - activity updated through activity BLDA022 from case BLD10-01116.
|
Routing - PLAN CHECK | 7/6/2010 | | 7/6/2010 | | PASS |
Tim L. Woodard
|
|
|
Approved plan modification #2. TLW
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/6/2010 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 7/6/2010 | | DONE |
Tim L. Woodard
|
|
|
|
BLD-Footing | 6/28/2010 | 6/28/2010 | 6/28/2010 | A | CANC |
Dave Hannah
|
|
|
jeffrey - ###-#### Cancel per Jeffery 6-28-10 9:54 am ///dld
|
Override - Parcel Holds | | | 6/28/2010 | | |
|
|
|
|
BLD-Framing/Rough-in | 6/23/2010 | 6/23/2010 | 6/23/2010 | P | PASS |
Dave Hannah
|
|
|
tony Phone #: ###-####
|
BLD-Footing | 6/22/2010 | 6/23/2010 | 6/23/2010 | A | PASS |
Dave Hannah
|
|
|
Tony Phone #: ###-####
|
Plan Modification Accepted | | | 6/23/2010 | | |
Tisha Gallop
|
|
|
Plan modification accepted for Bld10-01116 (The Matador Restaurant) for the rearrangement of rooms (no change in occupancy load), partitian location changes, lighting arrangement changes; submitted on sheets A1.0, A2.0, A3.0, A4.0, A5.0, A6.0; routed to Tim Woodard
|
Plan assigned to (TLW) | 6/16/2010 | | 6/22/2010 | | PASS |
Tim L. Woodard
|
|
|
6/22/2010 10:05:32 TLW - activity updated through activity BLDA022 from case BLD10-01116.
|
Routing - PLAN CHECK | 6/22/2010 | | 6/22/2010 | | PASS |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/22/2010 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 6/22/2010 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 6/22/2010 | | DONE |
|
|
|
|
Telephone call | | | 6/22/2010 | | DONE |
|
|
|
t/c w jeffrey at ###-#### - permit (plan mod) ready and fees given
|
Permit Ready to Issue | | | 6/22/2010 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 6/22/2010 | | DONE |
Tisha Gallop
|
|
|
paid for and picked up plan mod
|
Routing - PLAN CHECK | 6/16/2010 | | 6/21/2010 | | FAIL |
Tim L. Woodard
|
|
|
Sent correction to engineer and architect. TLW
|
Plan Modification Accepted | | | 6/16/2010 | | DONE |
|
|
|
Plan modification excepted for BLD10-01116 for the redesign of sheet A2.0 & structural calculations and details. To remove a steel columns,add beam and two columns to support and provide a clear aisle in kitchen.
|
Issue PAID IN FULL permit | | | 6/14/2010 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 5/18/2010 | | 6/11/2010 | | PASS |
Tim L. Woodard
|
|
|
6/11/2010 13:28:29 SRZ - activity updated through activity BLDA022 from case BLD10-01116.
|
Routing - FIRE | 6/10/2010 | | 6/11/2010 | | PASS |
Scott Arellano
|
|
|
Attached updated IFC comments to plans
|
Routing - PLAN CHECK | 6/11/2010 | | 6/11/2010 | | PASS |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/11/2010 | | DONE |
Sam Zahorka
|
|
|
|
Print Occupancy Form | | | 6/11/2010 | | DONE |
|
|
|
|
Telephone call | | | 6/11/2010 | | DONE |
|
|
|
t/c w jeffrey at ###-#### - permit ready and fees given - also need gc name and rce#
|
Telephone call | | | 6/11/2010 | | DONE |
|
|
|
left vm for elizabeth cooper at ###-#### - permit ready and fees given - also need gc name and rce#
|
Permit Ready to Issue | | | 6/11/2010 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 6/10/2010 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 6/8/2010 | | 6/10/2010 | | PASS |
Tim L. Woodard
|
|
|
Latest resubmittals address all concerns. Plans approved with plan review report. TLW
|
Plan resubmittals received | | | 6/9/2010 | | |
Tisha Gallop
|
|
|
received response letter and two copies of plan sheets A0.0, A2.0, A4.0, A6.0; taken to Tim Woodard
|
Routing - FIRE | 6/4/2010 | | 6/8/2010 | | FAIL |
Scott Arellano
|
|
|
Attached IFC comments to plans.
|
1st review completed | | | 6/8/2010 | | FAIL |
|
|
|
Failed Plan Check, Fire
|
Plan resubmittals received | | | 6/7/2010 | | |
Tim L. Woodard
|
|
|
rec'd response letter and structural calcs; two copies of sheets S1; A0.0; A2.0 - taken to Tim W
|
Routing - PLAN CHECK | 5/26/2010 | | 6/4/2010 | | FAIL |
Tim L. Woodard
|
|
|
Refer to attached plan review report for corrections. TLW
|
Routing - PUBLIC WORKS | | | 5/26/2010 | | PASS |
Beverly Mountain
|
|
|
|
Routing PW Environmental | 5/25/2010 | | 5/25/2010 | | PASS |
Walt Baumgartner
|
|
|
Plans reviewd 5/25/10. Spoke to Bob Tikker at Tikker Engineering and then to owner to verify kitchen has pre rinse station and T/S. Both will route to correct flow rate sized Big Dipper Thermaco
|
Routing - Addressing | 5/20/2010 | | 5/21/2010 | | PASS |
April Wing
|
|
|
|
Application received | | 5/18/2010 | 5/20/2010 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/18/2010 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/18/2010 | | DONE |
Tisha Gallop
|
|
|
|