BLD-Final | 12/14/2010 | 12/15/2010 | 12/15/2010 | A | PASS |
Mike Jordan
|
|
|
mike Phone #: ###-####
|
DOC - Permit Finaled | 12/15/2010 | 12/15/2010 | 12/15/2010 | P | PASS |
Mike Jordan
|
|
|
Certificate of occupancy was issued.
|
BLD-Aging Inspection | 11/15/2010 | 11/15/2010 | 11/17/2010 | | PASS |
Mike Jordan
|
|
|
wORK IN PROGRESS.
|
BLD-Energy code compliance | 9/10/2010 | 9/13/2010 | 9/13/2010 | A | PASS |
Mike Jordan
|
|
|
mike Phone #: ###-####
|
BLD-Framing/Rough-in | 9/2/2010 | 9/3/2010 | 9/3/2010 | P | PASS |
Mike Jordan
|
|
|
###-#### Mike
|
BLD-Framing/Rough-in | 7/12/2010 | 7/12/2010 | 7/12/2010 | P | PART |
Mike Jordan
|
|
|
mike Phone #: ###-####. Plate washers ok.
|
BLD-Foundation | 6/30/2010 | 6/30/2010 | 6/30/2010 | P | PASS |
Mike Jordan
|
|
|
Ryan Phone #: ###-####. ESC issues were resolved.
|
BLD-Foundation | 6/29/2010 | 6/29/2010 | 6/29/2010 | P | CANC |
Mike Jordan
|
|
|
Ryan Phone #: ###-####
|
BLD-Footing | 6/29/2010 | 6/29/2010 | 6/29/2010 | P | PEND |
Mike Jordan
|
|
|
Ryan Phone #: ###-####. Footing ok, has ESC issues, must be corrected prior to concrete.
|
OVERRIDE | | | 6/22/2010 | | |
|
|
|
|
OVERRIDE | | | 6/22/2010 | | |
|
|
|
|
Telephone call | | | 6/22/2010 | | |
|
|
|
Called Michael Duvall and told him that permit is ready & fees due BAS
|
Issue PAID IN FULL permit | | | 6/22/2010 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/22/2010 | | DONE |
|
|
|
|
Plan assigned to (CDM) | 5/25/2010 | 5/25/2010 | 6/18/2010 | | DONE |
Carl D Madsen
|
|
|
|
Routing - PLANNING | 6/1/2010 | | 6/18/2010 | | PASS |
Colleen T Carroll
|
|
|
Not in floodplain per Jim Wylie.
|
Plan resubmittals received | | | 6/18/2010 | | DONE |
Tisha Gallop
|
|
|
received two sets structural calcs; taken to Carl M.
|
Routing - PLAN CHECK | 6/18/2010 | | 6/18/2010 | | PASS |
Carl D Madsen
|
|
|
|
Case Summary (BLD) | | | 6/18/2010 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/18/2010 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/18/2010 | | DONE |
|
|
|
|
1st review completed | | | 6/9/2010 | | FAIL |
|
|
|
Tall wall engineering, truss engineering and engineering for the column and roof section at covered patio on the east end of the structure is required. Sent E-mail to the builder on 6-9-10 CDM
|
Routing - PLAN CHECK | | | 6/9/2010 | | FAIL |
Carl D Madsen
|
|
|
Tall wall engineering, truss engineering and engineering for the column and roof section at covered patio on the east end of the structure is required. Sent E-mail to the builder on 6-9-10 CDM
|
Route to Impact Fee Review | 5/24/2010 | 5/27/2010 | 6/7/2010 | | PASS |
Cindy M. Gould
|
|
|
|
Routing PW Flood Plain | 5/28/2010 | | 6/1/2010 | | PASS |
Jim Wyllie
|
|
|
Letter of Map Revision removed property from floodplain. Jim Wyllie (###-####)
|
Routing - Addressing | 5/25/2010 | | 5/28/2010 | | PASS |
April Wing
|
|
|
|
Routing - PUBLIC WORKS | 5/28/2010 | | 5/28/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Application received | | 5/24/2010 | 5/24/2010 | | DONE |
Barbara Stitt
|
|
|
|
Intake Approval | | | 5/24/2010 | | PASS |
Barbara Stitt
|
|
|
|