Permit Information
Permit NumberBLD10-01207
StatusFinaled
Name RADIX CONSTRUCTION INC
Site Address 8233 W FRANKLIN RD
Project NameFRANKLIN TOWNE PLAZA
Customer Number 
ePlanReviewNo
Description
(CAFE RIO - EAST END OF BUILDING) (8-16-10 PLAN MODIFICATION TO CHANGE THE CURP RAMP AND TO CHANGE THE MOUNTING OF THE TRACK FOR THE ROLL-DOWN FIRE DOOR). Partial fire sprinkler system required for fire area occupant load. To remodel an existing 2,580 square foot tenant space and convert it to a restaurant with a kitchen. Work it to include 2 restrooms accessible to the disabled, interior nonbearing walls, four (4) Type I grease hoods, one (1) Type II hood, interior decorative canopies, a suspended decorative log ceiling element, suspended acoustical ceilings, structural work to support new roof top equipment (concrete footings, steel and wood columns, steel and wood beams, etc.), kitchen equipment, a grease trap, and finishes. Transfer blocks and bottom cord sleepers will be added to the existing roof trusses as part of the structural modifications needed to support hoods and new roof top equipment. In addition, a 2-hr fire-resistance-rated fire barrier wall will be constructed to completely separate this building, the canopy included, into two separate fire areas. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire area containing this tenant space is required to be fire sprinklered in conjunction with this permit. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. Interior nonstructural demolition was done under permit BLD10-01546. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 9/25/201010/11/2010 DONE
Permanent Occupancy  9/15/2010 DONE
BLD-Final9/10/20109/13/20109/13/2010PPASS
DetailsMike Jordan
Scott Phone #: ###-####. ok for perm. occ.
FIRE-Final Inspection9/10/20109/13/20109/13/2010APASS
DetailsTroy Cobbley
life safety passed
Temporary Occupancy UNPAID FEE  9/13/2010 DONE
DetailsTisha Gallop
BLD-Final9/9/20109/10/20109/10/2010PNR
DetailsMike Jordan
Scott Phone #: ###-####
FIRE-Final Inspection9/9/20109/10/20109/10/2010AFAIL
DetailsForrest France
See fire code review notes items # 5, 6, 11, and 30 for items in need of revision including knox box, address numbers, EM lighting, signage at the riser room door. Replace ceiling at the comm room and provide missing escutcheon.
Zoning Approval9/9/20109/9/20109/9/2010 PASS
DetailsJosh Wilson
BLD-Framing/Rough-in9/7/20109/7/20109/7/2010PPASS
DetailsMike Jordan
2hr. fire wall at canopy and remainder on tennant side.
BLD-Framing/Rough-in9/3/20109/7/20109/7/2010APART
DetailsMike Jordan
SCOTT Phone #: ###-####. Remainder of 2hr. firewall on tenant side. work in progress.
CHANGE STATUS TO (ISS)  8/27/2010 DONE
DetailsTisha Gallop
paid for and picked up plan mod
BLD-Framing/Rough-in8/25/20108/26/20108/26/2010PPASS
DetailsMike Jordan
Ceiling grid ok.
BLD-Conference8/25/20108/25/20108/25/2010PDONE
DetailsMike Jordan
BLD-Framing/Rough-in8/18/20108/18/20108/18/2010APASS
DetailsMike Jordan
INterior steel stud walls for riser room.
Plan assigned to (CJW)8/10/20108/10/20108/16/2010 PASS
DetailsCarl Westfall
8/16/2010 10:44:22 CJW - activity updated through activity BLDA022 from case BLD10-01207.
Routing - PLAN CHECK8/10/2010 8/16/2010 PASS
DetailsCarl Westfall
Reviewed and approved the plan modification.
PLANS/APPL TAKEN TO FRONT DESK  8/16/2010 DONE
Print Occupancy Form  8/16/2010 DONE
Telephone call  8/16/2010 DONE
left vm for terry at ###-#### - permit (plan mod) ready and fees given
Permit Ready to Issue  8/16/2010 DONE
Details
BLD-Framing/Rough-in8/13/20108/13/20108/13/2010PCANC
DetailsMike Jordan
BLD-Framing/Rough-in8/13/20108/13/20108/13/2010ACANC
DetailsMike Jordan
BLD-Framing/Rough-in8/12/20108/12/20108/12/2010PPASS
DetailsMike Jordan
REmainder of slip joint at 2hr. firebarrier wall.
BLD-Framing/Rough-in8/11/20108/11/20108/11/2010PPASS
DetailsMike Jordan
Interior steel stud framed walls and hardlid only. Contractor now has the required 90 minute door frames for the 2hr. fire barrier wall. Also verified class C smoke and flame spread for kraft paper.
BLD-Framing/Rough-in8/11/20108/11/20108/11/2010ACANC
DetailsMike Jordan
BLD-Framing/Rough-in8/10/20108/10/20108/10/2010PFAIL
DetailsMike Jordan
Needs to provide listed door frame in 2hr. firebarrier wall. Correction notice issued.
BLD-Framing/Rough-in8/10/20108/10/20108/10/2010APART
DetailsMike Jordan
Slip joint at roof deck, south wall for 2hr. firebarrier wall, also 3rd layer of 5/8 type x rock at south firebarrier wall.
BLD-Framing/Rough-in8/9/20108/9/20108/10/2010APART
DetailsMike Jordan
Slip joint at roof deck behind restroom framing at 2hr. firebarrier wall. 1st and 2nd layers of 5/8 type x rock on north wall behind restroom framing.
Plan Modification Accepted  8/10/2010  
DetailsCarl Westfall
Plan Mod Rec'd to improve ADA ramp to account for planter that was not shown on plans and improve details for roll-down door to better establish a vertical surface for the rolling door track - sheets A3.1; A6.2; SD1.1
BLD-Framing/Rough-in8/9/20108/9/20108/9/2010PPART
DetailsMike Jordan
1st and 2nd. layers of 5/8 type x rock for 2hr. fire barrier wall, south wall. Also went over flame spread and smoke development requirments for bamboo and exposed paper at ceiling over insulation.
BLD-Framing/Rough-in8/5/20108/6/20108/9/2010PCANC
DetailsMike Jordan
BLD-Framing/Rough-in8/5/20108/6/20108/6/2010APART
DetailsMike Jordan
!st layer of 5/8 type x rock for 2hr. firebarrier wall, south portion.
BLD-Framing/Rough-in8/4/20108/5/20108/5/2010PNR
DetailsMike Jordan
BLD-Framing/Rough-in8/4/20108/5/20108/5/2010APART
DetailsMike Jordan
2nd and 3rd layers of 5/8 type x rock for 2hr. fire barrier wall at restroom area and 1st and 2nd layers at return at north wall exterior side.
BLD-Framing/Rough-in8/3/20108/4/20108/4/2010PPART
DetailsMike Jordan
1st layer of 5/8 type x rock and all patch backs ok for 2hr. fire barrier wall, tenant side.
BLD-Framing/Rough-in8/3/20108/4/20108/4/2010ADONE
DetailsMike Jordan
Scott Phone #: ###-####. On site conferance regarding 2hr. fire barrier wall and construction schdeule.
BLD-Footing7/29/20107/30/20107/30/2010PPASS
DetailsJim Sly
scott - early afternoon if possible Phone #: ###-####
3 footing pads for new columns....OK.
Routing - PLAN CHECK7/27/2010 7/28/2010 DONE
DetailsCarl Westfall
Take drawings to the permits desk.
PLANS/APPL TAKEN TO FRONT DESK  7/28/2010 DONE
Print Occupancy Form  7/28/2010 DONE
Telephone call  7/28/2010 DONE
t/c w dave at ###-#### - permit ready and fees given- also need gc name and rce#
Permit Ready to Issue  7/28/2010 DONE
Details
Issue PAID IN FULL permit  7/28/2010  
Plan assigned to (CJW)6/9/2010 7/28/2010 PASS
DetailsCarl Westfall
7/28/2010 08:27:33 CJW - activity updated through activity BLDA022 from case BLD10-01207.
Routing - PLAN CHECK7/21/2010 7/27/2010 PASS
DetailsCarl Westfall
Drawings approved after resubmittal review. Occupant load stayed at 114 for the public area.
Routing - PLUMBING7/27/2010 7/27/2010 PASS
DetailsBill VanDegrift
individual reduced pressure backflow preventors will be required for the different equipment. one for the hood, one for the soda mechines, one for the fill and drain system, one upstream of the filtered water system, etc. vent FD-3 in kitchen 104
Plan resubmittals received  7/21/2010 DONE
DetailsTisha Gallop
received transmittal, two copes of letter from engineer with calculations, two copies of resonse to plan review, two copies of plan sheets G1.1, SD1.1, G1.2, A1.1, A1.3, D1.1, A3.1, A4.1, A5.1, A6.1, F1.1, A6.2, M1.1, SO.1, S2.1, S7.2; taken to Carl Westfall
Routing - FIRE7/15/2010 7/21/2010 PASS
DetailsScott Arellano
Attached updated IFC comments to plans
Routing - PLAN CHECK7/7/2010 7/15/2010 FAIL
DetailsCarl Westfall
Resubmittals of 7/12/10 were incomplete. Copy of notes W/ architects response resubmittals e-mailed to architect.Plan rerouting to fire code analyst and plumbing for re-review while waiting for architects resubmittal response to plan review of 7/15/10.
Plan resubmittals received  7/12/2010  
DetailsCarl Westfall
rec'd response letters and two copies of sheets G1.1; G1.2; SD1.1; D1.1; A1.1; A1.3; A3.1; A4.1; A5.1; A6.1; A6.2; F1.1; E3.1; E4.1; E5.1; E5.2; E6.1 -taken to Carl W
Plan Reviewer's activity  7/9/2010 DONE
Sent an E-mail to the Architect. I am willing to increae the occupant load of the queuing area to 49 based on aisle width. Total occupant load would be 74 dining, 49 queuing, 6 kitchen. Occupant load sign would be 123.
Route to Impact Fee Review7/2/20107/8/20107/7/2010 PASS
DetailsCindy M. Gould
Tenant improvement no impact fees
Routing - FIRE7/2/20107/2/20107/7/2010 FAIL
DetailsScott Arellano
Faxed and emailed resubmittal items to architect.
1st review completed  7/7/2010 FAIL
Failed Plumbing, Plan Check, Fire
(F) Reprint permit  7/6/2010 DONE
DetailsTisha Gallop
Routing - PLAN CHECK6/17/2010 7/2/2010 FAIL
DetailsCarl Westfall
The IBC plan review was started on June 18, 2010 and finished on July 2, 2010. The review was delayed for a week while the architect considered fire sprinklering the entire building or constructing a fire barrier wall. Revised drawings are required. See the plan review report.
Plan resubmittals received  6/24/2010  
DetailsCarl Westfall
Received 1 cover transmittal, 2 copies of response letter from Richard Jensen dated 6-22-10, 2 copies of sheets P1.1, P2.1 and taken to Carl Westfall to insert into plans///6-24-10 BAS
Telephone call  6/22/2010 DONE
Called Will Scott with "evans + associates architecture". Discussed the problem with fire area and the two options available (1) fire sprinkler the entire building or (2) build a 2-hr fire barrier wall and fire sprinkler this tenant space. Waiting for a decission.
Routing - Design Review6/16/2010 6/17/2010 PASS
DetailsJosh Wilson
PASS- allowed use in C-2D zone and no exterior improvements requiring Design Review approval are proposed
Routing - PLUMBING6/14/2010 6/16/2010 FAIL
DetailsBill VanDegrift
reduced pressure backflow preventer required on the soda machine, filtered water system, evaporative cooler fill and drain system, additional cross connection protection may be required, additionally an r.p. will be required on the ansol system, install r.p.'s over a floor sink. vent all floor drains. provide a drain for the steam table P-2 located on the bottom left corner of page P1.1, fixture schedule calls for drainage.
Routing - Erosion and Sediment6/11/2010 6/14/2010 PASS
DetailsSteven Webb
ESC plan waiver is approved according to the ESC permit attached conditions. ESC10-00473. Certified RP is required prior to issuance of any permits.
Routing - PUBLIC WORKS6/9/2010 6/11/2010 PASS
DetailsConnie Baumgartner
Routing PW Environmental6/11/2010 6/11/2010 PASS
DetailsWalt Baumgartner
WestBoise Sewer District jurisdiction. Grease interceptor is noted on plans. 1500 gallon size is required.
Routing PW Sewer Rating6/11/2010 6/11/2010 PASS
DetailsConnie Baumgartner
Routing - Addressing6/10/2010 6/10/2010 PASS
DetailsApril Wing
Application received 5/28/20106/9/2010 DONE
DetailsTisha Gallop
Pending Assignment by JCB6/9/2010 6/9/2010 DONE
DetailsJason Blais
Intake Approval  6/8/2010 PASS
DetailsSam Zahorka
Missing intake checklist items recieved. Notified applicant of requirement to contact ACHD for evaluation of possible additional impact fees.
Plans ACCEPTED BY PLAN TECH  6/8/2010  
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  6/8/2010  
DetailsTisha Gallop
Intake Approval  5/28/2010 FAIL
DetailsSam Zahorka
Refer to circled items on plan intake checklist. SRZ