BLD-Final | 4/20/2011 | 4/22/2011 | 4/22/2011 | A | PASS |
Tony Young
|
|
|
Bob Phone #: ###-####
|
DOC - Permit Finaled | 4/22/2011 | 4/22/2011 | 4/22/2011 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Final | 4/18/2011 | 4/19/2011 | 4/21/2011 | P | NR |
Tony Young
|
|
|
Bob Phone #: ###-####
|
BLD-Final | 4/19/2011 | 4/20/2011 | 4/20/2011 | P | NR |
Tony Young
|
|
|
Bob Phone #: ###-####
|
BLD-Final | 4/18/2011 | 4/18/2011 | 4/19/2011 | P | NR |
Tony Young
|
|
|
Bob Phone #: ###-####
|
BLD-Final | 4/15/2011 | 4/18/2011 | 4/18/2011 | A | PART |
Tony Young
|
|
|
Bob Phone #: ###-####,,, most ok,, need landing out rear door door,, firecaulk,, temp glass,, guardrail bottom space...
|
BLD-Final | 4/15/2011 | 4/15/2011 | 4/15/2011 | P | NR |
Tony Young
|
|
|
Bob Phone #: ###-####
|
BLD-Final | 4/14/2011 | 4/15/2011 | 4/15/2011 | A | NR |
Tony Young
|
|
|
Bob Phone #: ###-####
|
BLD-Final | 4/13/2011 | 4/14/2011 | 4/15/2011 | A | NR |
Tony Young
|
|
|
Bob Phone #: ###-####
|
BLD-Grading Inspection | 4/15/2011 | 4/15/2011 | 4/15/2011 | P | DONE |
Terry Records
|
|
|
Final grading and drainage approved
|
BLD-Foundation | 3/21/2011 | 3/22/2011 | 3/22/2011 | A | PASS |
Tom Arcoraci
|
|
|
jay Phone #: ###-####
|
BLD-Footing | 3/17/2011 | 3/17/2011 | 3/17/2011 | P | PASS |
Jim Storey
|
|
|
bob Phone #: ###-#### south sde of lot ft ok
|
PubWorks Subgrade Approval | 3/17/2011 | 3/17/2011 | 3/17/2011 | | DONE |
Terry Records
|
|
|
Footing subgrade approved
|
Routing Walk-In (BLD) | 3/14/2011 | 3/14/2011 | 3/14/2011 | P | PASS |
Perry Paine
|
|
|
|
Permit Ready to Issue | | | 3/14/2011 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 3/14/2011 | | DONE |
Christina Prado
|
|
|
|
Case Summary (BLD) | | | 3/14/2011 | | |
|
|
|
|
Inspection Record Card- Bld | | | 3/14/2011 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/14/2011 | | |
|
|
|
|
BLD-Framing/Rough-in | 2/16/2011 | 2/16/2011 | 2/16/2011 | P | PASS |
Tony Young
|
|
|
Bob Phone #: ###-####,, soffits ok per WUI
|
BLD-Wall cover | 12/22/2010 | 12/23/2010 | 12/23/2010 | P | PASS |
Tony Young
|
|
|
Bob Phone #: ###-####,, interior shear ok
|
BLD-Energy code compliance | 12/22/2010 | 12/22/2010 | 12/23/2010 | P | PASS |
Tony Young
|
|
|
Bob Phone #: ###-####
|
BLD-Framing/Rough-in | 12/10/2010 | 12/10/2010 | 12/10/2010 | P | PASS |
Tony Young
|
|
|
bob Phone #: ###-####
|
BLD-Wall cover | 11/5/2010 | 11/8/2010 | 11/8/2010 | A | PART |
Tony Young
|
|
|
shear wall insp//Bob Phone #: ###-####,, call 1st/// exterior,, see other notes
|
BLD-Other | 11/5/2010 | 11/5/2010 | 11/8/2010 | P | PART |
Tony Young
|
|
|
shear wall insp//Bob Phone #: ###-####,, will need a couple hold downs in front,, can see at main frame inspection,, ok to cover exterior and roof,, NOTE: I did not verify truss engineering, just straps on roof and nailing
|
BLD-Foundation | 9/16/2010 | 9/16/2010 | 9/16/2010 | P | PART |
Tony Young
|
|
|
bill Phone #: ###-####,, work in progress
|
BLD-Footing | 9/14/2010 | 9/15/2010 | 9/15/2010 | A | PART |
Tony Young
|
|
|
bill Phone #: ###-####,, main level ok
|
PubWorks Subgrade Approval | 9/14/2010 | 9/14/2010 | 9/14/2010 | | DONE |
Terry Records
|
|
|
subgrade for upper level footings approved by the geotechnical engineer
|
BLD-Footing | 9/10/2010 | 9/13/2010 | 9/13/2010 | P | NR |
Tony Young
|
|
|
bill Phone #: ###-####,, need soils report
|
BLD-Foundation | 9/3/2010 | 9/3/2010 | 9/3/2010 | P | PART |
Dave Hannah
|
|
|
bill - ###-#### basement walls ok to pour
|
BLD-Footing | 8/27/2010 | 8/27/2010 | 8/27/2010 | P | PART |
Tony Young
|
|
|
Bill Phone #: ###-####,, work in progress basement ftgs,, tying rebar
|
PubWorks Subgrade Approval | 8/26/2010 | 8/26/2010 | 8/26/2010 | | PART |
Terry Records
|
|
|
Subgrade for basement footings approved by the geotechnical engineer
|
Issue PAID IN FULL permit | | | 8/17/2010 | | DONE |
|
|
|
|
Plan assigned to (CDM) | 8/12/2010 | 8/12/2010 | 8/16/2010 | | DONE |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 8/12/2010 | | 8/16/2010 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/16/2010 | | |
|
|
|
|
Plan resubmittals received | | | 8/12/2010 | | DONE |
Tisha Gallop
|
|
|
Received two copies of revised sheets A0.1, S1.1; inserted by the contractor and rerouted to Carl Madsen.
|
Plan assigned to (CDM) | 6/1/2010 | 6/1/2010 | 7/7/2010 | | PASS |
Carl D Madsen
|
|
|
7/7/2010 09:24:16 CDM - activity updated through activity BLDA022 from case BLD10-01208.
|
Routing - PLAN CHECK | 6/8/2010 | | 7/7/2010 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/7/2010 | | |
|
|
|
|
Inspection Record Card- Bld | | | 7/7/2010 | | DONE |
|
|
|
|
Telephone call | | | 7/7/2010 | | DONE |
|
|
|
left vm for shane at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 7/7/2010 | | DONE |
|
|
|
|
Plan resubmittals received | | | 6/30/2010 | | DONE |
|
|
|
received 1 letter of transmittal, resopnse letter and 2 copies of sheets A-1.4 , A-3.1 taken to Carl M.
|
Telephone call | | | 6/21/2010 | | DONE |
|
|
|
Left message with Shane at Jayo Construction requesting additional information for WUI compliance 6-21-10 CDM
|
Case Summary (BLD) | | | 6/20/2010 | | DONE |
|
|
|
|
1st review completed | | | 6/19/2010 | | DONE |
|
|
|
|
Routing - FIRE | 6/7/2010 | | 6/8/2010 | | PASS |
Scott Arellano
|
|
|
No fire sprinklers required.
|
Route to Impact Fee Review | 5/28/2010 | 6/3/2010 | 6/7/2010 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - Erosion and Sediment | 6/4/2010 | | 6/7/2010 | | PASS |
Steven Webb
|
|
|
ESC plan is approved according to the ESC plan and ESC permit conditions. ESC10-00447
|
Routing - PUBLIC WORKS | 6/1/2010 | | 6/4/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLANNING | 6/4/2010 | | 6/4/2010 | | PASS |
Colleen T Carroll
|
|
|
|
Routing PW Grading-Hillside | 6/4/2010 | | 6/4/2010 | | PASS |
Terry Records
|
|
|
Retaining wall was modified to be no more than four feet above grade. Approved as Category 3.
|
Routing PW Grading-Hillside | 6/1/2010 | | 6/1/2010 | | FAIL |
Terry Records
|
|
|
Because of proposed 6 to 7 foot high retaining wall needs Hillside Development application approval from Planning and Zoning prior to approving building permit app. Spoke with contractor and Jim Glancey
|
Intake Approval | | | 6/1/2010 | | PASS |
|
|
|
|
Routing - Addressing | 6/1/2010 | | 6/1/2010 | | PASS |
April Wing
|
|
|
|
Application received | | 5/28/2010 | | | |
|
|
|
|