Third Notice | | 4/13/2012 | 4/10/2012 | | DONE |
|
|
|
faxed to Golis//FV done by CP
|
Print Statement | | | 4/10/2012 | | DONE |
|
|
|
|
Third Notice | | 3/20/2012 | 3/30/2012 | | DONE |
|
|
|
faxed to Golis Const
|
Second Notice | | 3/11/2012 | 3/15/2012 | | DONE |
Christina Prado
|
|
|
faxed 3-15-2012
|
First Notice | 2/29/2012 | 2/29/2012 | 3/1/2012 | | DONE |
Dave Hannah
|
|
|
|
BLD-Final | 2/28/2012 | 2/28/2012 | 2/29/2012 | P | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 2/29/2012 | 2/29/2012 | 2/29/2012 | A | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 2/28/2012 | 2/28/2012 | 2/28/2012 | | PEND |
Dave Hannah
|
|
|
|
FIRE-Conference | 7/11/2011 | 7/11/2011 | 7/11/2011 | A | DONE |
Forrest France
|
|
|
Project related FIR permits are finaled- fire life safety inspection needed.
|
FIRE-Conference | 7/6/2011 | 7/6/2011 | 7/6/2011 | P | CANC |
Forrest France
|
|
|
John-PLease co-ordinate with Building inspector Phone #: ###-#### *Note- incorrect permit number requested**
|
BLD-Conference | 7/6/2011 | 7/6/2011 | 7/6/2011 | P | CANC |
Jim Storey
|
|
|
John-Please co-ordinate with the Fire inspector Phone #: ###-####
|
Override - Parcel Holds | 7/6/2011 | 1/1/1900 | 7/6/2011 | | |
|
|
|
Not in the plan mod area
|
Override - Parcel Holds | 7/6/2011 | 1/1/1900 | 7/6/2011 | | |
|
|
|
not in the plan modification area
|
BLD-Wall cover | 6/27/2011 | 6/27/2011 | 6/27/2011 | P | CANC |
Dave Hannah
|
|
|
John Phone #: ###-####
|
Override - Parcel Holds | 6/27/2011 | 1/1/1900 | 6/27/2011 | | |
|
|
|
Wall cover
|
BLD-Aging Inspection | 4/6/2011 | 4/6/2011 | 4/14/2011 | | PASS |
Dave Hannah
|
|
|
talked with brandon he will get finals ###-####
|
BLD-Aging Inspection | 12/28/2010 | 12/28/2010 | 12/28/2010 | | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 10/27/2010 | 10/27/2010 | 10/27/2010 | | PASS |
Dave Hannah
|
|
|
|
BLD-Footing | 8/25/2010 | 8/26/2010 | 8/26/2010 | A | PART |
Dave Hannah
|
|
|
bryan Phone #: ###-#### tree wells crew still working on forms and rebar using specal inspection all work is to plans
|
Issue PAID IN FULL permit | | | 7/21/2010 | | DONE |
Tisha Gallop
|
|
|
|
OVERRIDE | | | 6/28/2010 | | |
|
|
|
|
Inspection Record Card- Bld | | | 6/28/2010 | | DONE |
|
|
|
|
Telephone call | | | 6/28/2010 | | DONE |
|
|
|
t/c w keith at ###-#### - permit ready and fees given - also need gc name, rce#, rp and ACHD receipt
|
Permit Ready to Issue | | | 6/28/2010 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/24/2010 | | PASS |
|
|
|
To permit desk to issue. ACHD approval letter required.
|
Inspection Record Card- Bld | | | 6/24/2010 | | DONE |
|
|
|
|
Plan assigned to (DRS) | 6/3/2010 | | 6/24/2010 | | PASS |
Dan Stuart
|
|
|
6/24/2010 07:42:55 DRS - activity updated through activity BLDA022 from case BLD10-01230.
|
Routing - PLAN CHECK | 6/21/2010 | | 6/23/2010 | | PASS |
Dan Stuart
|
|
|
Plans passed by Planning. Received written direction from Eric Jensen, Jensen Belts Associates concerning the exit path bridge to be constructed from LATTA, INC., Jefferson St. side exit over the vault. copy attached to permit. Routing to permit desk to issue.
|
Telephone call | | | 6/22/2010 | | DONE |
|
|
|
Keith Jones called to say the developement team had done a walk through the project today and had reviewed the need to maintain the required 2nd exit from Latta, Inc. onto Jefferson St. An addendum is to be issued to the contractor to provide a bridge and railings designed to carry loads as part of an exit system and pedestrian protection from the 2nd Jefferson side exit over the excavation to the curb. This will be a deferred Submittal and the contractor will be responsible to submit design data for approval before installing. Keith will provide copies of the addendum for our records. Remidned him we still need ACHD approval of project in writing for the permit desk before a permit will be issued.
|
Routing - PLAN CHECK | 6/18/2010 | | 6/21/2010 | | PEND |
Dan Stuart
|
|
|
Routing back to Planning for approval.
|
Routing - Design Review | 6/21/2010 | | 6/21/2010 | | PASS |
Josh Wilson
|
|
|
REDLINES sheets ST-1 and ST-2. 9th Street must be planted with Sweetgum 'Cherokee' and Jefferson Street must be planted with Chanticleer Pear
|
Routing - FIRE | 6/17/2010 | | 6/18/2010 | | PASS |
Scott Arellano
|
|
|
Please, see attached comments.
|
1st review completed | | | 6/18/2010 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 6/17/2010 | | DONE |
|
|
|
Reminder notice e-mailed to Keith Jones, Design Professional of Record with copy to Eric Jensen, Jensen Belt Associates; and Nicholas Kraus, Quadrant Consulting, Inc., concerning need for written documentation on methods to be used to maintain the required exits from tenant and stair enclosure that are to the Jeffereson Street sidewalk and letter from ACHD stating theyn have approved the plans and received or made arrangements to receive any fee's that may be due for this project.
|
Routing - PLAN CHECK | 6/9/2010 | | 6/17/2010 | | PASS |
Dan Stuart
|
|
|
Resubmittals not required. Plans routed to fire code analyst for review.
|
Routing - Erosion and Sediment | | | 6/9/2010 | | PASS |
Steven Webb
|
|
|
ESC plan is approved according to the ESC plan and ESC permit conditions. ESC10-00460: Need certified RP.
|
Routing - PUBLIC WORKS | 6/3/2010 | | 6/8/2010 | | PASS |
Beverly Mountain
|
|
|
|
Routing PW Street Lights | 6/7/2010 | | 6/8/2010 | | PASS |
Hank Alarcon
|
|
|
|
Routing PW Drainage | 6/8/2010 | | 6/8/2010 | | PASS |
Brian Murphy
|
|
|
ACHD SIDEWALKS
|
Routing PW Sewer Rating | 6/7/2010 | | 6/7/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 6/4/2010 | | 6/4/2010 | | PASS |
April Wing
|
|
|
|
Telephone call | | | 6/3/2010 | | DONE |
|
|
|
Call to Nicholas Kraus, Quadrant Consulting, Inc, 342-009, to provide completed ESC application and narrative for project. Nicholas out of office so I talked with Steve Sweet. He will provide ASAP.
|
Recd Pcfee & Taken To Pln CK | | | 6/3/2010 | | |
|
|
|
|
Pending Assignment by JCB | 6/3/2010 | | 6/3/2010 | | DONE |
Jason Blais
|
|
|
|
Application received | | 6/2/2010 | 6/2/2010 | | DONE |
Darla L Downs
|
|
|
|
Intake Approval | | | 6/2/2010 | | PASS |
Dan Stuart
|
|
|
NOTE:Need copy of ACHD signed agreement or approval letter before permit can be issued. Planning DRH10-00104 has 10 day appeal period.
|