(FACTORY MOTOR PARTS - West Park #3) Permit is to remodel an existing 18,622 square foot office / warehouse building. Approval contingent upon adhering to the approved plans on file. Work to include: construction of interior non-bearing walls to create a conference room and an office, installation of new breakroom sink in place of old (no new fixtures), installation of new doors / hardware, and finishes in compliance with chapter 8 of the 2006 IBC. This building is fully fire sprinklered any alterations or modifications to the sprinkler system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA #13 as regulated by the fire department. Racking that exceeds 8 ft. in height requires a separate Building Permit be submitted and approved before installation. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
MISC ACTIONS  1/19/2011 DONE
DetailsTisha Gallop
received final cert of value, GC taken off hold
MISC ACTIONS  12/29/2010 DONE
DetailsTisha Gallop
placed Schwalbe & Storey Contractors on hold until receive final cert of value for this project
Third Notice 11/8/201011/24/2010 DONE
Telephone call  11/24/2010 DONE
DetailsTisha Gallop
tt Doug and he said thought he sent it in long time ago. Told him no record of it so need him to resend if he did. He said will check on it.
Third Notice 10/11/201010/25/2010 DONE
faxed
Third Notice 8/31/20109/27/2010 DONE
faxed
Second Notice 8/26/20108/26/2010 DONE
First Notice 8/12/20108/16/2010 DONE
BLD-Final8/2/20108/2/20108/2/2010PPASS
DetailsMike Jordan
Gina Phone #: ###-####. ok for perm occ.
Permanent Occupancy UNPAID FEE  8/2/2010 DONE
BLD-Final7/30/20107/30/20107/30/2010PPASS
DetailsTroy Cobbley
Life safety passed. Fire alarm is complete
FIRE-Final Inspection7/9/20107/12/20107/12/2010APART
DetailsTroy Cobbley
A temporary occupancy was given until the project related fire alarm work has been submitted, approved and inspected.
BLD-Final7/12/20107/12/20107/12/2010PPART
DetailsMike Jordan
Temp. occupancy granted. Will be ok for perm occ once life/safety finals.
BLD-Final7/9/20107/12/20107/12/2010ACANC
DetailsMike Jordan
Doug Phone #: ###-####
Plan Reviewer's activity  7/12/2010 DONE
DetailsTim L. Woodard
Alternate approval by BO was approved and attached to the case. This alternate allowed load to be reduced to 21. With a 21 occupant load space complies with current code egress requirements and 1979 UBC (Original Code) egress requirements. TLW
Temporary Occupancy UNPAID FEE  7/12/2010 DONE
FIRE-Final Inspection7/7/20107/8/20107/9/2010AFAIL
DetailsTroy Cobbley
All life safety items have been addressed except for the secondary exit at the east/rear door
BLD-Final7/7/20107/8/20107/8/2010PNR
DetailsMike Jordan
doug Phone #: ###-####. ADA upgrades were completed. Waiting on racking permits and review of back exit door with no landing and fire/life/safety finals.
FIRE-Final Inspection7/2/20107/2/20107/2/2010PFAIL
DetailsTroy Cobbley
Tim is investigating the installation of an exit sign at the rear door with no landing and stephanie is investigating the partial alarm system. Single action door hardware needs to be provided as noted on the plans. All of the existing exit signs and emergency lights need to be repaired and tested.
BLD-Final7/2/20107/2/20107/2/2010PNR
DetailsMike Jordan
Doug Phone #: ###-####
BLD-Framing/Rough-in6/18/20106/18/20106/18/2010PPASS
DetailsTom Arcoraci
Doug Phone #: ###-#### window at entry ok, re-imformed contractor that racking over 8 ft reqires permit
Issue PAID IN FULL permit  6/15/2010  
Print Occupancy Form  6/10/2010 DONE
Telephone call  6/10/2010 DONE
6-10-10 called left message for Cornel permit ready and fee given///dld
Plan assigned to (TLW)6/4/2010 6/9/2010 PASS
DetailsTim L. Woodard
6/9/2010 16:19:34 TLW - activity updated through activity BLDA022 from case BLD10-01260.
Routing - PLAN CHECK6/4/2010 6/9/2010 PASS
DetailsTim L. Woodard
Plans approved with redlines and plan review report. TLW
Routing - FIRE  6/9/2010 PASS
DetailsTim L. Woodard
1st review completed  6/9/2010 DONE
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  6/9/2010 DONE
DetailsTim L. Woodard
Case Summary (BLD)  6/9/2010 DONE
DetailsTim L. Woodard
Print Occupancy Form  6/9/2010 DONE
Permit Ready to Issue  6/9/2010 DONE
Application received 6/4/20106/4/2010 DONE
DetailsDarla L Downs
Recd Pcfee & Taken To Pln CK  6/4/2010 DONE
Plans ACCEPTED BY PLAN TECH  6/4/2010 DONE
ok per Tim woodard to take in as a level 1