Permit NumberBLD10-01293
StatusFinaled
Name R SQUARED CONSTRUCTION
Site Address 1734 W STATE ST
Project NameIDAHO STATE LIQUOR STORE
Customer Number 
ePlanReviewNo
Description
(IDAHO STATE LIQUOR STORE - Albertsons Marketplace) Permit is to remodel an existing 830 square foot office space and a 2,689 square foot mercantile space to be a new 3,519 square foot Liquor Store. Approval contingent upon adhering to the approved plans on file. Work to include: demolition of approximately 210 linear feet of interior non bearing wall, [construction of interior non-bearing wall to create a two separate sex fully accessible bathrooms, an office, and a break room, installation of new accessible bathroom fixtures, and finishes in compliance with chapter 8 of the 2006 IBC. This building is fully fire sprinklered any alterations or modifications to the sprinkler system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA #13 as regulated by the fire department. Racking that exceeds 8 ft. in height requires a separate Building Permit be submitted and approved before installation. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 10/11/201010/5/2010 DONE
Third Notice 9/18/20109/27/2010 DONE
faxed
Second Notice 9/5/20109/13/2010 DONE
First Notice 8/14/20108/26/2010 DONE
Permanent Occupancy UNPAID FEE  8/4/2010  
BLD-Final7/30/20108/2/20108/2/2010PPASS
DetailsTony Young
Phone #: ###-#### >> Inspection requested via web by Danton Walker
FIRE-Final Inspection7/30/20108/2/20108/2/2010APASS
DetailsForrest France
Fire life safety inspection passed. Correction items verified for completion.
Zoning Approval7/29/20107/29/20107/29/2010 PASS
DetailsAndrea Tuning
BLD-Other7/22/20107/23/20107/23/2010PPASS
DetailsTony Young
ceiling grid inspection for cover Phone #: ###-#### >> Inspection requested via web by Danton Walker
BLD-Framing/Rough-in7/12/20107/13/20107/13/2010PPART
DetailsTony Young
Phone #: ###-#### >> Inspection requested via web by Danton Walker,, walls ok to cover
Issue PAID IN FULL permit  7/6/2010 DONE
DetailsTisha Gallop
OVERRIDE  7/1/2010  
Plan assigned to (TLW)6/25/2010 7/1/2010 PASS
DetailsTim L. Woodard
7/1/2010 11:20:16 TLW - activity updated through activity BLDA022 from case BLD10-01293.
Routing - PLAN CHECK7/1/2010 7/1/2010 PASS
DetailsTim L. Woodard
Approved with redlines. TLW
PLANS/APPL TAKEN TO FRONT DESK  7/1/2010 DONE
DetailsTim L. Woodard
Case Summary (BLD)  7/1/2010 DONE
DetailsTim L. Woodard
Print Occupancy Form  7/1/2010 DONE
Routing - Erosion and Sediment7/1/2010 7/1/2010 PASS
DetailsTim L. Woodard
Waiver Request approved. Applicant must comply with the attached conditions. TLW
Telephone call  7/1/2010 DONE
t/c w doug at ###-#### - permit ready and fees given - also need gc name and rce#
Permit Ready to Issue  7/1/2010 DONE
Details
Plan resubmittals received  6/30/2010  
DetailsTim L. Woodard
rec'd response letter and 2 copies of A1.1 - taken to Tim
Case Summary (BLD)  6/29/2010 DONE
Plan assigned to (CDM)6/8/20106/8/20106/25/2010 DEFR
DetailsCarl D Madsen
Plan Review defered to Tim Woodard.
Routing - PLAN CHECK6/11/2010 6/25/2010 FAIL
DetailsTim L. Woodard
Need Additional Infromation on the plans refer to plan review report. TLW
Routing - FIRE  6/25/2010 PASS
DetailsTim L. Woodard
Field Verify
1st review completed  6/25/2010 FAIL
DetailsTim L. Woodard
Failed Building Dept. Review
Routing PW Sewer Rating6/11/2010 6/11/2010 PASS
DetailsConnie Baumgartner
Routing - PUBLIC WORKS6/9/2010 6/11/2010 PASS
DetailsConnie Baumgartner
Routing - Addressing6/10/2010 6/10/2010 PASS
DetailsApril Wing
Application received 6/8/20106/9/2010 DONE
DetailsTisha Gallop
Plans ACCEPTED BY PLAN TECH  6/8/2010 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  6/8/2010 DONE
DetailsTisha Gallop