Third Follow up | | | 5/11/2011 | | DONE |
Tisha Gallop
|
|
|
received final value for elec, mech, plmb from GC.
|
Third Notice | | 3/31/2011 | 3/21/2011 | | DONE |
|
|
|
|
Meeting | | | 3/21/2011 | | DONE |
Tisha Gallop
|
|
|
tenant came into office. He only knows overall project value of what he paid Wellman Construction. The subcontractors were hired by Wellman, therefore the tenant doesn't know the breakdown of the value. I told him to just provide what his payment to Wellman was for the Project Value and I will continue to try to contact Wellman for the breakdow of the subs.
|
Third Notice | | 3/8/2011 | 3/17/2011 | | DONE |
|
|
|
mailed to GC and applicant
|
Second Notice | | 2/27/2011 | 3/3/2011 | | DONE |
Christina Prado
|
|
|
mailed 3-3-11
|
First Notice | | 2/10/2011 | 2/17/2011 | | DONE |
Christina Prado
|
|
|
Mailed 2-17-11. No fax given
|
BLD-Aging Inspection | 1/24/2011 | 1/24/2011 | 1/31/2011 | | PASS |
Tom Arcoraci
|
|
|
|
Permanent Occupancy | | | 1/31/2011 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Aging Inspection | 11/22/2010 | 11/22/2010 | 11/22/2010 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 9/22/2010 | 9/22/2010 | 9/22/2010 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Final | 9/22/2010 | 9/22/2010 | 9/22/2010 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Final | 7/23/2010 | 7/23/2010 | 7/23/2010 | P | PART |
Tom Arcoraci
|
|
|
jim Phone #: ###-#### ok for temp needs sign at door
|
FIRE-Final Inspection | 7/23/2010 | 7/23/2010 | 7/23/2010 | P | PASS |
Forrest France
|
|
|
Fire life safety passed with the exception of door hardware at two locations and max occupant load sign to be revised. These items to be verified for compliance by the structural inspector.
|
BLD-Framing/Rough-in | 7/22/2010 | 7/22/2010 | 7/22/2010 | P | PASS |
Tom Arcoraci
|
|
|
Ceiling grid inspection please-Jim Phone #: ###-####
|
FIRE-Conference | 7/12/2010 | 7/12/2010 | 7/14/2010 | P | DONE |
Troy Cobbley
|
|
|
I went over life safety requirements with jim which included the hood suppression system.
|
BLD-Framing/Rough-in | 7/12/2010 | 7/12/2010 | 7/12/2010 | P | PASS |
Tom Arcoraci
|
|
|
jim Phone #: ###-####
|
Plan assigned to (CDM) | 7/1/2010 | 7/1/2010 | 7/6/2010 | | DONE |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 7/6/2010 | | 7/6/2010 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/6/2010 | | |
|
|
|
|
Print Occupancy Form | | | 7/6/2010 | | DONE |
|
|
|
|
Telephone call | | | 7/6/2010 | | DONE |
|
|
|
left vm for jim at ###-#### - permit ready and fees given - also need gc name and rce#
|
Permit Ready to Issue | | | 7/6/2010 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/6/2010 | | |
|
|
|
|
Case Summary (BLD) | | | 7/2/2010 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 7/1/2010 | | 7/2/2010 | | PASS |
Beverly Mountain
|
|
|
|
Plan resubmittals received | | | 7/1/2010 | | |
Carl D Madsen
|
|
|
rec'd 2 copies of sheets A-1 & A3.1 - taken to Carl M
|
Plan assigned to (CDM) | 6/11/2010 | 6/11/2010 | 6/29/2010 | | PASS |
Carl D Madsen
|
|
|
6/29/2010 08:41:28 CDM - activity updated through activity BLDA022 from case BLD10-01321.
|
Routing - PLAN CHECK | 6/14/2010 | | 6/29/2010 | | PASS |
Carl D Madsen
|
|
|
|
Routing - FIRE | | | 6/29/2010 | | PASS |
|
|
|
Verify in field CDM
|
Case Summary (BLD) | | | 6/29/2010 | | DONE |
|
|
|
|
1st review completed | | | 6/28/2010 | | FAIL |
|
|
|
|
Routing PW Sewer Rating | 6/14/2010 | | 6/14/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 6/11/2010 | | 6/14/2010 | | PASS |
April Wing
|
|
|
|
Routing - PUBLIC WORKS | 6/14/2010 | | 6/14/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/11/2010 | | DONE |
|
|
|
|
Application received | | 6/10/2010 | | | |
|
|
|
|