Second Notice | | 10/7/2010 | 9/27/2010 | | DONE |
|
|
|
|
First Notice | | 9/19/2010 | 9/27/2010 | | DONE |
|
|
|
|
Permanent Occupancy UNPAID FEE | | | 9/9/2010 | | DONE |
|
|
|
|
BLD-Final | 8/30/2010 | 8/31/2010 | 8/31/2010 | A | PASS |
Tom Arcoraci
|
|
|
Phone #: ###-####
|
Temporary Occupancy UNPAID FEE | | | 8/31/2010 | | DONE |
|
|
|
|
FIRE-Final Inspection | 8/27/2010 | 8/30/2010 | 8/30/2010 | A | PASS |
Forrest France
|
|
|
Correction items verified for completion. Fire life safety finaled.
|
FIRE-Final Inspection | 8/27/2010 | 8/27/2010 | 8/27/2010 | P | NR |
Forrest France
|
|
|
Tom Phone #: ###-####
|
FIRE-Final Inspection | 8/26/2010 | 8/27/2010 | 8/27/2010 | A | NR |
Forrest France
|
|
|
Project related fire alarm permit must be requested for and pass final inspection prior to building fire life safety approval. Notified contractor of the necessary steps to be completed for occupancy.
|
BLD-Final | 8/24/2010 | 8/25/2010 | 8/25/2010 | P | NR |
Tony Young
|
|
|
Tom Phone #: ###-####
|
FIRE-Final Inspection | 8/24/2010 | 8/25/2010 | 8/25/2010 | A | FAIL |
Forrest France
|
|
|
Project related fire alarm permit must be issued and requested for final inspection prior to building fire life safety approval. Also need to provide and post one fire extinguisher per plan, replace door closures, access ramps are not yet finished.
|
BLD-Conference | 8/23/2010 | 8/23/2010 | 8/23/2010 | P | FAIL |
Tony Young
|
|
|
tom Phone #: ###-####,, door approach needs 24"
|
BLD-Framing/Rough-in | 8/9/2010 | 8/10/2010 | 8/11/2010 | A | PART |
Tony Young
|
|
|
Tom Phone #: ###-####,, hold downs ok
|
BLD-Framing/Rough-in | 8/9/2010 | 8/10/2010 | 8/10/2010 | A | PART |
Tony Young
|
|
|
Tom Phone #: ###-####,, work in progress on skirting frame..
|
Issue PAID IN FULL permit | | | 8/2/2010 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/7/2010 | | |
|
|
|
|
Telephone call | | | 7/7/2010 | | DONE |
|
|
|
7-7-10 called left message with Kristen for Richard permit ready and fee given Also need GC number///dld
|
Route to Impact Fee Review | 6/30/2010 | 7/6/2010 | 7/6/2010 | | PASS |
Cindy M. Gould
|
|
|
|
Plan assigned to (DRS) | 6/14/2010 | | 7/6/2010 | | PASS |
Dan Stuart
|
|
|
7/6/2010 10:47:42 DRS - activity updated through activity BLDA022 from case BLD10-01336.
|
Routing - PLAN CHECK | 7/2/2010 | | 7/6/2010 | | PASS |
Dan Stuart
|
|
|
Plans to permit desk to process for issuance of permit.
|
Plan Reviewer's activity | | | 7/6/2010 | | DONE |
|
|
|
Received confirmation on anchor placement from Dean Briggs, Structural engineering, through richard Honsinger, Erstad Arch.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/6/2010 | | PASS |
|
|
|
|
Print Occupancy Form | | | 7/6/2010 | | DONE |
|
|
|
|
Routing - FIRE | 6/30/2010 | 6/30/2010 | 7/2/2010 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 7/2/2010 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 6/23/2010 | | 6/30/2010 | | PEND |
Dan Stuart
|
|
|
Pending clarification from Weston at Erstad Arch concerning the appearant difference between anchor call out on engineering vs. that shown on plans.Routing to fire code analyst for review.
|
Telephone call | | | 6/30/2010 | | DONE |
|
|
|
Call to Dean Briggs to verify anchor design data. Will call me back when available.
|
Telephone call | | | 6/30/2010 | | DONE |
|
|
|
Call to Richard Hunsinger concerning anchor differences between architectural plans and engineering. Richard not in, talked with Weston. Weston will check out and call me back
|
Telephone call | | | 6/30/2010 | | DONE |
|
|
|
Returned call to Dale Burley, school district. left message that plans are routing to fire code analyst and arch is checking on anchoring diferences and will get back with me.
|
Plan resubmittals received | | | 6/28/2010 | | |
|
|
|
Received cover transmittal and 2 copies of sheet a1.01
|
Routing - PLANNING | | | 6/23/2010 | | PASS |
Cody Riddle
|
|
|
cup10-00022
|
Routing - PUBLIC WORKS | | | 6/22/2010 | | PASS |
|
|
|
|
Routing PW Solid Waste | 6/17/2010 | | 6/22/2010 | | PASS |
Peter J. McCullough
|
|
|
|
Routing PW Drainage | 6/17/2010 | | 6/21/2010 | | PASS |
Brian Murphy
|
|
|
|
Routing - Addressing | 6/15/2010 | | 6/15/2010 | | PASS |
April Wing
|
|
|
|
Routing - PLANNING Land Div | 6/14/2010 | | 6/15/2010 | | PASS |
Todd Tucker
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/14/2010 | | DONE |
|
|
|
|
Pending Assignment by JCM | 6/14/2010 | | 6/14/2010 | | BLDA |
John Menard
|
|
|
6/14/2010 11:14:15 JCM - activity updated through activity BLDA168 from case BLD10-01337.
|
Application received | | 6/14/2010 | | | |
|
|
|
|
Routing - Erosion and Sediment | 6/22/2010 | | | | |
Steven Webb
|
|
|
|