Permit Information
Permit NumberBLD10-01347
StatusFinaled
Name ARBOR FINISH CARPENTRY INC
Site Address 1041 S BROADWAY AVE
Project NameR BAR
Customer Number 
ePlanReviewNo
Description
(R BAR) Remodel for a new bar/tavern tenant in a 1,286 sq. ft. space of existing building per approved plans. Work to include: [construction of interior non-bearing walls to create separate sex fully accessible bathrooms and an equipment / maintenance room, installation of new plumbing, structural lintel installed above new opening, and finishes in compliance with chapter 8 of the 2006 IBC. This building is not fire sprinklered. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 9/6/20109/9/2010 DONE
BLD-Final8/26/20108/27/20108/27/2010PPASS
DetailsJim Storey
chris Phone #: ###-####
FIRE-Final Inspection8/26/20108/27/20108/27/2010APASS
DetailsForrest France
Life safety inspection passed, fire extinguisher to be posted as discussed.
Permanent Occupancy UNPAID FEE  8/27/2010  
Zoning Approval8/25/20108/25/20108/25/2010 DONE
DetailsJoshua Johnson
BLD-Framing/Rough-in8/12/20108/12/20108/12/2010PPART
DetailsJim Storey
pending others sign off ok to cover
BLD-Framing/Rough-in8/12/20108/12/20108/12/2010PCANC
DetailsJim Storey
Chris Edy Phone #: ###-#### 8-12-10 per Chris need to cnacel this inspection ///dld
Print Occupancy Form  7/28/2010 DONE
Telephone call  7/28/2010 DONE
t/c w ryan at ###-#### - permit ready and fees given - also need rp name
Permit Ready to Issue  7/28/2010 DONE
Issue PAID IN FULL permit  7/28/2010 DONE
Routing - PLAN CHECK7/15/2010 7/27/2010 PASS
DetailsTim L. Woodard
Plans approved with resubmittals. TLW
Routing - PLANNING7/26/2010 7/27/2010 PASS
DetailsJoshua Johnson
moved exterior cooler location. TLW
PLANS/APPL TAKEN TO FRONT DESK  7/27/2010 DONE
DetailsTim L. Woodard
Case Summary (BLD)  7/27/2010 DONE
DetailsTim L. Woodard
Plan assigned to (TLW)7/9/2010 7/27/2010 PASS
DetailsTim L. Woodard
7/27/2010 16:20:24 TLW - activity updated through activity BLDA022 from case BLD10-01347.
Plan resubmittals received  7/22/2010 DONE
DetailsTisha Gallop
received transmittal, structural calcs, ACHD letter and two copies of plan sheets Cover, A1.0, A1.1; taken to Tim Woodard
1st review completed  7/15/2010 FAIL
Failed Planning, Plan Check
Routing - FIRE7/12/2010 7/15/2010 PASS
DetailsScott Arellano
Attached IFC comments to plans
Routing - PLAN CHECK6/30/2010 7/12/2010 FAIL
DetailsSam Zahorka
Reffer to plan review report. Provide additional structural calcs. TLW
Plan assigned to (SRZ)6/15/2010 7/9/2010 DEFR
DetailsSam Zahorka
Plans Deffered To Tim Woodard. TLW
Routing - Design Review6/24/2010 6/25/2010 PASS
DetailsAndrea Tuning
Andrea Tuning - CZC10-00120
Routing - PLANNING6/25/2010 6/25/2010 FAIL
DetailsJoshua Johnson
Josh Johnson - CUP10-00029 awaiting planning approval
Routing - PLUMBING6/23/2010 6/24/2010 PASS
DetailsBill VanDegrift
per plans and 2003 upc, additional cross connection protection may be required.
Routing - Erosion and Sediment6/22/2010 6/23/2010 PASS
DetailsSteven Webb
ESC plan waiver is approved according to the ESC permit conditions. ESC10-00490
Routing - PUBLIC WORKS6/16/2010 6/22/2010 PASS
DetailsBeverly Mountain
Routing PW Sewer Rating6/21/2010 6/22/2010 PASS
DetailsConnie Baumgartner
Routing - Addressing6/18/2010 6/18/2010 PASS
DetailsApril Wing
Plan resubmittals received  6/16/2010 DONE
DetailsJason Blais
Received ESC Application and Plan Waiver Request Letter.
Intake Approval  6/16/2010 PASS
DetailsJason Blais
Received ESC Application and Plan Waiver Request Letter.
Plan Reviewer's activity  6/15/2010 DONE
DetailsJason Blais
E-mailed architect letting him know an Erosion & Sediment Control application and Plan Waiver Request letter is required because of the extensive saw cutting for under slab plumbing. Also reminded him to contact ACHD to evaluation of any additional impact fees due. A verification letter from ACHD will need to be provided prior to permit issuance.
Pending Assignment by JCB6/14/2010 6/15/2010 DONE
DetailsJason Blais
Intake Approval  6/15/2010 FAIL
DetailsSam Zahorka
Need ESC Application and Plan Waiver Request Letter.
Application received 6/14/20106/14/2010 DONE
DetailsTisha Gallop
Plans ACCEPTED BY PLAN TECH  6/14/2010 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  6/14/2010 DONE
DetailsTisha Gallop