Second Notice | | 8/22/2010 | 8/26/2010 | | DONE |
|
|
|
|
First Notice | | 8/6/2010 | 8/12/2010 | | DONE |
|
|
|
|
BLD-Final | 7/26/2010 | 7/27/2010 | 7/27/2010 | P | PASS |
Jim Sly
|
|
|
TJ MIller Phone #: ###-#### OK for Perm Occ.
|
FIRE-Final Inspection | 7/27/2010 | 7/27/2010 | 7/27/2010 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
FIRE-Final Inspection | 7/26/2010 | 7/27/2010 | 7/27/2010 | A | FAIL |
Troy Cobbley
|
|
|
No sticker has been provided at the main exit as listed on the original correction notice. I was unable to reach the contact on the phone and no one was on site.
|
Permanent Occupancy UNPAID FEE | | | 7/27/2010 | | DONE |
|
|
|
|
BLD-Conference | 7/13/2010 | 7/14/2010 | 7/14/2010 | A | NR |
Jim Sly
|
|
|
Bill or Marty Phone #: ###-####
|
FIRE-Final Inspection | 7/13/2010 | 7/14/2010 | 7/14/2010 | A | FAIL |
Troy Cobbley
|
|
|
A wall has been removed which left several sprinkler pendants located too close to one another which will require a sprinkler permit, provide single action lever hardware on the three doors as discussed, provide tagged fire extinguisher, provide suite number and sticker at the main exit.
|
Plan assigned to (CDM) | 6/17/2010 | 6/17/2010 | 6/25/2010 | | DONE |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 6/17/2010 | | 6/25/2010 | | PASS |
Carl D Madsen
|
|
|
|
Routing - FIRE | | | 6/25/2010 | | PASS |
|
|
|
|
1st review completed | | | 6/25/2010 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 6/25/2010 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/25/2010 | | |
|
|
|
|
Print Occupancy Form | | | 6/25/2010 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/25/2010 | | DONE |
|
|
|
|
Telephone call | | | 6/25/2010 | | DONE |
|
|
|
Called Liz permit ready 6-25-10 dld
|
Issue PAID IN FULL permit | | | 6/25/2010 | | |
|
|
|
|
(F) Reprint permit | | | 6/25/2010 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/17/2010 | | DONE |
|
|
|
|
Application received | | 6/16/2010 | 6/16/2010 | | DEFR |
Darla L Downs
|
|
|
|