BLD-Final | 11/8/2010 | 11/8/2010 | 11/8/2010 | P | PASS |
Jim Storey
|
|
|
TIM PLEASE CALL BEFORE GOING OUT AS TIM WOULD LIKE TO BE THERE THANKS Phone #: ###-####
|
DOC - Permit Finaled | 11/8/2010 | 11/8/2010 | 11/8/2010 | P | PASS |
Jim Storey
|
|
|
|
BLD-Conference | 10/25/2010 | 10/26/2010 | 10/26/2010 | P | PART |
Jim Storey
|
|
|
tim - around 3 if possible please Phone #: ###-#### final ok pending gaurdrail on back deck.
|
BLD-Wall cover | 9/15/2010 | 9/15/2010 | 9/15/2010 | P | PASS |
Jim Storey
|
|
|
soffits and overhangs ok to cover gyp ok
|
BLD-Energy code compliance | 9/10/2010 | 9/13/2010 | 9/13/2010 | P | PASS |
Jim Storey
|
|
|
Tim Phone #: ###-####
|
BLD-Framing/Rough-in | 9/9/2010 | 9/10/2010 | 9/10/2010 | P | PASS |
Jim Storey
|
|
|
tim - please call 1/2 hr prior Phone #: ###-####
|
BLD-Conference | 9/1/2010 | 9/1/2010 | 9/1/2010 | P | PASS |
Jim Storey
|
|
|
|
BLD-Conference | 8/25/2010 | 8/25/2010 | 8/25/2010 | P | PASS |
Jim Storey
|
|
|
reviewed fire treated wood and conection to meet Wild land enterface code pervisions as well as fire blk's required in basement fur out areas.
|
BLD-Footing | 8/19/2010 | 8/19/2010 | 8/19/2010 | P | PASS |
Jim Storey
|
|
|
rob Phone #: ###-####
|
BLD-Foundation | 8/13/2010 | 8/13/2010 | 8/13/2010 | P | PASS |
Jim Storey
|
|
|
Manuel Phone #: ###-####
|
BLD-Foundation | 8/11/2010 | 8/12/2010 | 8/12/2010 | P | PASS |
Jim Storey
|
|
|
Manuel Phone #: ###-####
|
PubWorks Subgrade Approval | 8/11/2010 | 8/11/2010 | 8/11/2010 | | DONE |
Terry Records
|
|
|
Footing subgrade for upper level footings approved by the geotechnical engineer
|
BLD-Foundation | 8/5/2010 | 8/5/2010 | 8/5/2010 | P | PASS |
Mike Jordan
|
|
|
ian Phone #: ###-####
|
BLD-Footing | 8/4/2010 | 8/4/2010 | 8/4/2010 | P | PASS |
Tom Arcoraci
|
|
|
Dane Phone #: ###-####
|
PubWorks Subgrade Approval | 8/4/2010 | 8/4/2010 | 8/4/2010 | | PART |
Terry Records
|
|
|
Footing subgrade for basement footing approved by the geotechnical engineer. Upper level footing subgrade must have separate approval.
|
Telephone call | | | 7/26/2010 | | DONE |
|
|
|
t/c w tanya at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 7/26/2010 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/26/2010 | | DONE |
|
|
|
|
Plan assigned to (PEP) | 7/2/2010 | 7/2/2010 | 7/23/2010 | | DONE |
Perry Paine
|
|
|
|
1st review completed | | | 7/23/2010 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/23/2010 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/23/2010 | | DONE |
|
|
|
|
Routing - PLAN CHECK | | | 7/23/2010 | | PASS |
Perry Paine
|
|
|
|
Routing - PLAN CHECK | 6/28/2010 | | 7/23/2010 | | PASS |
Perry Paine
|
|
|
|
Plan assigned to (CDM) | 6/23/2010 | 6/23/2010 | 7/2/2010 | | DEFR |
Carl D Madsen
|
|
|
|
Case Summary (BLD) | | | 7/2/2010 | | |
|
|
|
|
Route to Impact Fee Review | 6/23/2010 | 6/28/2010 | 6/28/2010 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - Erosion and Sediment | 6/25/2010 | | 6/28/2010 | | PASS |
Steven Webb
|
|
|
The ESC plan is approved according to the ESC plan and ESC permit conditions. Informed CBH (Tanya) that the RP listed on the application has expired and that a certified RP is required prior to issuance of the permits. ESC10-00509
|
Routing - FIRE | 6/28/2010 | | 6/28/2010 | | PASS |
Scott Arellano
|
|
|
No fire sprinklers required. This property is located in WUI area "B" and is an outer perimeter strucutre abutting undeveloped land. The special building construction regualtions of BMC 7-01-69 section 4906 will apply.
|
Routing - PUBLIC WORKS | | | 6/25/2010 | | PASS |
|
|
|
|
Routing - PLANNING | 6/25/2010 | | 6/25/2010 | | PASS |
Colleen T Carroll
|
|
|
Subject property is in WUI Area B
|
Routing - Addressing | 6/23/2010 | | 6/24/2010 | | PASS |
April Wing
|
|
|
|
Routing PW Grading-Hillside | 6/24/2010 | | 6/24/2010 | | PASS |
Terry Records
|
|
|
Footing subgrade must be approved by the applicants geotechnical engineer prior to scheduling footing inspection. No other Public Works hillside requirements.
|
Application received | | 6/23/2010 | 6/23/2010 | | DONE |
Tisha Gallop
|
|
|
|
Intake Approval | | | 6/23/2010 | | PASS |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/23/2010 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/23/2010 | | DONE |
Tisha Gallop
|
|
|
|