Telephone call | | | 3/8/2011 | | DONE |
Tisha Gallop
|
|
|
Per phone call with Lisa from RA Schultz send bill for final value to Thornton Oliver Keller attn: Ben Shalz.
|
Third Notice | | 3/17/2011 | 3/4/2011 | | DONE |
|
|
|
|
Third Notice | | 2/22/2011 | 3/3/2011 | | DONE |
|
|
|
faxed
|
Second Notice | | 2/14/2011 | 2/17/2011 | | DONE |
Christina Prado
|
|
|
Faxed 2-17-11 @ 9AM
|
First Notice | | 1/21/2011 | 2/4/2011 | | DONE |
|
|
|
|
Permanent Occupancy | | | 1/11/2011 | | |
|
|
|
|
BLD-Final | 1/7/2011 | 1/10/2011 | 1/10/2011 | P | PASS |
Jim Sly
|
|
|
Matt Phone #: ###-#### OK for Perm Occ
|
FIRE-Final Inspection | 1/7/2011 | 1/10/2011 | 1/10/2011 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
FIRE-Final Inspection | 1/7/2011 | 1/7/2011 | 1/7/2011 | P | CANC |
Troy Cobbley
|
|
|
Life safety inspection was not performed due to the project related fire alarm permit not being finished yet.
|
FIRE-Final Inspection | 11/1/2010 | 11/2/2010 | 11/2/2010 | A | FAIL |
Troy Cobbley
|
|
|
Provide inspection/final on the project related fire alarm permit and repair the exit sign out of the back office area and provide an emergency light in the warehouse area.
|
FIRE-Final Inspection | 10/29/2010 | 10/29/2010 | 11/1/2010 | P | NR |
Forrest France
|
|
|
Matt Phone #: ###-####
|
FIRE-Conference | 9/20/2010 | 9/20/2010 | 9/20/2010 | P | DONE |
Troy Cobbley
|
|
|
I went over possible fire alarm requirements with Matt.
|
BLD-Framing/Rough-in | 9/10/2010 | 9/10/2010 | 9/10/2010 | P | PART |
Jim Sly
|
|
|
Ceiling grid inspection-Matt Phone #: ###-#### Grid OK
|
BLD-Framing/Rough-in | 8/11/2010 | 8/11/2010 | 8/11/2010 | P | PASS |
Jim Sly
|
|
|
Matt phone...###-####
|
BLD-Framing/Rough-in | 8/10/2010 | 8/11/2010 | 8/11/2010 | A | CANC |
Jim Sly
|
|
|
matt Phone #: ###-####
|
Issue PAID IN FULL permit | | | 7/27/2010 | | DONE |
|
|
|
|
Plan assigned to (CDM) | 6/30/2010 | 6/30/2010 | 7/14/2010 | | DONE |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 7/1/2010 | | 7/14/2010 | | PASS |
Carl D Madsen
|
|
|
|
Case Summary (BLD) | | | 7/14/2010 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/14/2010 | | |
|
|
|
|
Print Occupancy Form | | | 7/14/2010 | | DONE |
|
|
|
|
Telephone call | | | 7/14/2010 | | DONE |
Barbara Stitt
|
|
|
Called Bob Camp and told him that permit is ready & fees due on 7-14-10 @ 3:20pm
|
Permit Ready to Issue | | | 7/14/2010 | | DONE |
Barbara Stitt
|
|
|
|
Plan resubmittals received | | | 7/13/2010 | | |
Carl D Madsen
|
|
|
rec'd two copies of sheet A2.1 - taken to Carl M
|
1st review completed | | | 7/8/2010 | | FAIL |
|
|
|
|
Routing - FIRE | | | 7/8/2010 | | PASS |
|
|
|
Verify in field CDM
|
Application received | | 6/30/2010 | 7/1/2010 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/30/2010 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/30/2010 | | DONE |
Tisha Gallop
|
|
|
|
Intake Approval | | | 6/30/2010 | | PASS |
Tisha Gallop
|
|
|
|