BLD-Final | 1/6/2011 | 1/6/2011 | 1/8/2011 | P | PASS |
Tony Young
|
|
|
JOHN Phone #: ###-####
|
BLD-Final | 1/4/2011 | 1/6/2011 | 1/7/2011 | A | PASS |
Tony Young
|
|
|
JOHN Phone #: ###-####
|
DOC - Permit Finaled | 1/6/2011 | 1/6/2011 | 1/6/2011 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Final | 1/3/2011 | 1/4/2011 | 1/4/2011 | A | PASS |
Tony Young
|
|
|
JOHN Phone #: ###-####
|
BLD-Grading Inspection | 1/4/2011 | 1/4/2011 | 1/4/2011 | P | DONE |
Terry Records
|
|
|
Final grading and drainage approved.
|
BLD-Final | 12/30/2010 | 12/30/2010 | 12/30/2010 | P | FAIL |
Tony Young
|
|
|
john Phone #: ###-####,, need hillside sign off,, needs mech final,, needs sheet rock on garage (oppisite side) wall,, seal firewall
|
BLD-Energy code compliance | 10/18/2010 | 10/19/2010 | 10/19/2010 | A | PASS |
Tony Young
|
|
|
JOhn Phone #: ###-####
|
BLD-Framing/Rough-in | 10/14/2010 | 10/15/2010 | 10/15/2010 | A | PASS |
Tony Young
|
|
|
john Phone #: ###-####,, ok to insulate
|
BLD-Framing/Rough-in | 10/14/2010 | 10/14/2010 | 10/14/2010 | P | FAIL |
Tony Young
|
|
|
john Phone #: ###-####,, need seal package,, walk through conf only
|
BLD-Framing/Rough-in | 9/20/2010 | 9/21/2010 | 9/21/2010 | P | PART |
Jim Sly
|
|
|
John-Shear wall inspection Phone #: ###-#### Shear OK.
|
BLD-Conference | 9/8/2010 | 9/9/2010 | 9/13/2010 | A | PEND |
Tony Young
|
|
|
John Phone #: ###-####,, stair and shear, and WUI
|
BLD-Conference | 9/8/2010 | 9/8/2010 | 9/8/2010 | P | PART |
Tony Young
|
|
|
John Phone #: ###-####,, need reviewed plans
|
BLD-Foundation | 8/11/2010 | 8/11/2010 | 8/11/2010 | P | PASS |
Jim Sly
|
|
|
Adam Phone #: ###-####
|
BLD-Footing | 8/4/2010 | 8/5/2010 | 8/5/2010 | A | PART |
Tony Young
|
|
|
Adam Phone #: ###-####,, work in progress
|
PubWorks Subgrade Approval | 8/4/2010 | 8/4/2010 | 8/4/2010 | | DONE |
Terry Records
|
|
|
Footing subgrade approved by the geotechnical engineer
|
Issue PAID IN FULL permit | | | 7/30/2010 | | DONE |
|
|
|
|
Plan assigned to (CDM) | 7/1/2010 | 7/1/2010 | 7/22/2010 | | DONE |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 7/19/2010 | | 7/22/2010 | | PASS |
Carl D Madsen
|
|
|
|
Case Summary (BLD) | | | 7/22/2010 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/22/2010 | | |
|
|
|
|
Inspection Record Card- Bld | | | 7/22/2010 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/22/2010 | | DONE |
|
|
|
|
Telephone call | | | 7/22/2010 | | DONE |
|
|
|
7-22-10 called Sara permit ready and fee given ///dld
|
1st review completed | | | 7/19/2010 | | FAIL |
|
|
|
|
Routing - FIRE | 7/15/2010 | | 7/19/2010 | | PASS |
Scott Arellano
|
|
|
No fire sprinklers required. An existing fire hydrant is available appoximately 275 from the proposed structure.
|
Routing - Erosion and Sediment | 7/13/2010 | | 7/15/2010 | | PASS |
Steven Webb
|
|
|
ESC plan is approved according to the ESC plan and ESC permit conditions. ESC10-00518
|
Routing PW Grading-Hillside | 7/13/2010 | | 7/13/2010 | | PASS |
Terry Records
|
|
|
Approved as Category 3
|
Routing - PUBLIC WORKS | | | 7/13/2010 | | PASS |
|
|
|
|
Route to Impact Fee Review | 6/30/2010 | 7/6/2010 | 7/9/2010 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLANNING | 7/7/2010 | | 7/7/2010 | | PASS |
Colleen T Carroll
|
|
|
|
Routing - Addressing | 7/1/2010 | | 7/2/2010 | | PASS |
April Wing
|
|
|
|
Routing PW Grading-Hillside | 7/2/2010 | | 7/2/2010 | | FAIL |
Terry Records
|
|
|
Geotechnical report needs to be updated. Left message with Sarah Seidl.
|
Application received | | 6/30/2010 | 7/1/2010 | | DONE |
Tisha Gallop
|
|
|
|
Intake Approval | | | 7/1/2010 | | PASS |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/1/2010 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/1/2010 | | DONE |
Tisha Gallop
|
|
|
|
Routing - PLAN CHECK | 7/7/2010 | | | | FAIL |
Carl D Madsen
|
|
|
Structure is required to meet WUI zone A requirements 7-19-10 CDM
|