To construct a new 2016s.f. 1-story detached accessory building with R-1A approved through CZC09-00141 by Colleen Carroll for Susan Riggs. Separate ESC permit is required. All per the approved plans as marked, Engineer's calculations along with the plan review notes. pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/22/20109/24/20109/24/2010APASS
DetailsMike Jordan
DOC - Permit Finaled9/24/20109/24/20109/24/2010PPASS
DetailsMike Jordan
BLD-Final9/21/20109/22/20109/21/2010ACANC
DetailsMike Jordan
Mike Phone #: ###-####
BLD-Framing/Rough-in9/2/20109/3/20109/3/2010APASS
DetailsMike Jordan
Mike Phone #: ###-####
Routing Walk-In (BLD)9/3/20109/3/20109/3/2010ADONE
DetailsAlexandra L. DeYoung
9/3/2010 11:41:05 ALR - activity updated through activity BLDI252 from case BLD10-01516.
Routing Walk-In (BLD)9/3/20109/3/20109/3/2010APASS
DetailsPerry Paine
BLD-Concrete8/16/20108/17/20108/17/2010PPASS
DetailsMike Jordan
Mike Phone #: ###-####. INterior column pad footings. ok. Wiil be placed with interior slab on grade.
BLD-Footing8/11/20108/12/20108/12/2010APASS
DetailsMike Jordan
Mike Phone #: ###-####South footing and stemwall.
BLD-Concrete8/9/20108/10/20108/10/2010APASS
DetailsMike Jordan
Michael Phone #: ###-####. Perimeter stemwalls ok.
BLD-Footing8/4/20108/6/20108/6/2010APART
DetailsMike Jordan
CJ Pierce- around 11:30-12 if possible please Phone #: ###-####. Permiter footing ok, work inprogress on installing reinforcment at column pad footings.
OVERRIDE  7/2/2010  
Routing Walk-In (BLD)7/2/20107/2/20107/2/2010ADONE
DetailsPerry Paine
7/2/2010 10:15:45 PEP - activity updated through activity BLDA022 from case BLD10-01516.
Plan assigned to (PEP)7/1/20107/1/20107/2/2010 PASS
DetailsPerry Paine
7/2/2010 10:15:45 PEP - activity updated through activity BLDA022 from case BLD10-01516.
Case Summary (BLD)  7/2/2010  
Inspection Record Card- Bld  7/2/2010  
1st review completed  7/2/2010 DONE
PLANS/APPL TAKEN TO FRONT DESK  7/2/2010 DONE
Permit Ready to Issue  7/2/2010 DONE
Issue PAID IN FULL permit  7/2/2010 DONE
Application received 7/1/20107/1/2010 DONE
DetailsAlexandra L. DeYoung
Routing Walk-In (Zoning)7/1/20107/1/20107/1/2010PPASS
DetailsColleen T Carroll
Routing Walk-In (BLD)7/1/20107/1/20107/1/2010PFAIL
DetailsPerry Paine
need engineering for long wall
1st review completed  7/1/2010 FAIL