Second Notice | | 5/7/2011 | 5/11/2011 | | DONE |
|
|
|
Faxed 5-11-11
|
First Notice | | 4/10/2011 | 4/27/2011 | | DONE |
|
|
|
|
Permanent Occupancy | | | 3/31/2011 | | DONE |
Tisha Gallop
|
|
|
|
FIRE-Alarm Testing | 3/23/2011 | 3/23/2011 | 3/23/2011 | A | PASS |
Forrest France
|
|
|
Fire alarm testing passed.
|
BLD-Final | 3/22/2011 | 3/23/2011 | 3/23/2011 | A | PASS |
Dave Hannah
|
|
|
ron Phone #: ###-####
|
FIRE-Final Inspection | 3/21/2011 | 3/22/2011 | 3/22/2011 | A | PASS |
Forrest France
|
|
|
Fire life safety finaled, inspection passed.
|
FIRE-Sprinkler Rough-in | 3/2/2011 | 3/2/2011 | 3/2/2011 | P | PART |
Forrest France
|
|
|
Okay to cover overhead fire sprinkler modifications at the drop ceilings.
|
BLD-Framing/Rough-in | 2/25/2011 | 2/28/2011 | 2/28/2011 | P | PASS |
Dave Hannah
|
|
|
ceiling cover Phone #: ###-####
|
BLD-Other | 2/24/2011 | 2/25/2011 | 2/28/2011 | P | PASS |
Dave Hannah
|
|
|
Ron Phone #: ###-#### ceiling grid ok to cover but will need to install sprader bars
|
FIRE-Conference | 2/16/2011 | 2/16/2011 | 2/16/2011 | P | DONE |
Forrest France
|
|
|
Discussion with contractor regarding exit signs per approved plans.
|
BLD-Framing/Rough-in | 12/28/2010 | 12/28/2010 | 12/28/2010 | P | PASS |
Dave Hannah
|
|
|
ron Phone #: ###-####
|
BLD-Aging Inspection | 12/28/2010 | 12/28/2010 | 12/28/2010 | | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 10/26/2010 | 10/27/2010 | 10/27/2010 | A | PASS |
Dave Hannah
|
|
|
ron Phone #: ###-####
|
FIRE-Final Inspection | 10/26/2010 | 10/26/2010 | 10/26/2010 | P | PASS |
Forrest France
|
|
|
Fire life safety passed inspection. No fire alarm or sprinkler permit work required due to new wall finishes per construction documents.
|
BLD-Framing/Rough-in | 10/25/2010 | 10/26/2010 | 10/26/2010 | A | PART |
Dave Hannah
|
|
|
Ron Phone #: ###-#### temp wall for files ok
|
BLD-Aging Inspection | 10/25/2010 | 10/25/2010 | 10/25/2010 | | PASS |
Dave Hannah
|
|
|
exps on 01/22/11
|
Telephone call | | | 10/20/2010 | | DONE |
|
|
|
t/c w curtis at ###-#### - permit (plan mod) ready and fees given
|
CHANGE STATUS TO (ISS) | | | 10/20/2010 | | DONE |
Tisha Gallop
|
|
|
picked up plan mod
|
OVERRIDE | | | 10/19/2010 | | |
|
|
|
|
Print Occupancy Form | | | 10/19/2010 | | DONE |
Barbara Stitt
|
|
|
|
Permit Ready to Issue | | | 10/19/2010 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (CDM) | 10/12/2010 | 10/12/2010 | 10/18/2010 | | PASS |
Carl D Madsen
|
|
|
|
Case Summary (BLD) | | | 10/18/2010 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/18/2010 | | 10/18/2010 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/18/2010 | | |
|
|
|
|
Plan Modification Accepted | | | 10/12/2010 | | |
|
|
|
Plan modification excepted for BLD10-01525 for the construction of approcimately 20ft x 20 ft file room in a nearby auxiliary space. Sheets affected A0.01, & A2.02 . routed to Carl M for review.
|
Issue & PRINT to be Invoiced | | | 7/26/2010 | | |
|
|
|
|
OVERRIDE | | | 7/23/2010 | | |
|
|
|
|
Plan assigned to (CDM) | 7/7/2010 | 7/7/2010 | 7/23/2010 | | DONE |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 7/7/2010 | | 7/23/2010 | | PASS |
Carl D Madsen
|
|
|
|
1st review completed | | | 7/23/2010 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 7/23/2010 | | DONE |
|
|
|
|
Routing - FIRE | | | 7/23/2010 | | PASS |
|
|
|
Verify in field CDM
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/23/2010 | | |
|
|
|
|
Print Occupancy Form | | | 7/23/2010 | | DONE |
|
|
|
|
Telephone call | | | 7/23/2010 | | DONE |
|
|
|
t/c w curtis at ###-#### - permit ready and fees given - also need RP name
|
Permit Ready to Issue | | | 7/23/2010 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 7/7/2010 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/7/2010 | | DONE |
|
|
|
|
Application received | | 7/2/2010 | 7/2/2010 | | DONE |
Tisha Gallop
|
|
|
|
Intake Approval | | | 7/2/2010 | | PASS |
|
|
|
|