Third Notice | | 3/4/2011 | 3/7/2011 | | DONE |
|
|
|
|
Third Notice | | 2/9/2011 | 2/18/2011 | | DONE |
|
|
|
faxed
|
Second Notice | | 1/30/2011 | 2/4/2011 | | DONE |
|
|
|
|
First Notice | | 1/6/2011 | 1/20/2011 | | DONE |
|
|
|
|
BLD-Final | 12/27/2010 | 12/27/2010 | 12/27/2010 | P | PASS |
Dave Hannah
|
|
|
Please check handrail- temp occupancy expired 12-13-10 thanks Barb
|
Permanent Occupancy | | | 12/27/2010 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Aging Inspection | 12/1/2010 | 12/1/2010 | 12/3/2010 | | PASS |
Dave Hannah
|
|
|
|
Telephone call | | | 11/23/2010 | | DONE |
Barbara Stitt
|
|
|
Called Mark Guho at ###-#### to remind him that the temp occupancy expires on 12-13-10. He is aware of the expiration date and is meeting with the handrail person this afternoon and hoping to have it installed by the end of this week, so that he meets his deadline.
|
BLD-Final | 9/13/2010 | 9/14/2010 | 9/14/2010 | A | PART |
Dave Hannah
|
|
|
Boyd Phone #: ###-#### ok for temp occ needs to fix handrail
|
Temporary Occupancy UNPAID FEE | | | 9/14/2010 | | |
|
|
|
|
FIRE-Final Inspection | 9/10/2010 | 9/13/2010 | 9/13/2010 | A | PASS |
Forrest France
|
|
|
Correction notice items verified for completion. Life safety finaled.
|
FIRE-Final Inspection | 9/10/2010 | 9/10/2010 | 9/10/2010 | P | FAIL |
Forrest France
|
|
|
Provide approved door hardware at two locations, remove the manual thumbturn at the lower level exit.
|
Zoning Approval | 9/10/2010 | 9/10/2010 | 9/10/2010 | | PASS |
Andrea Tuning
|
|
|
|
Issue PAID IN FULL permit | | | 8/2/2010 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/29/2010 | | DONE |
|
|
|
|
Telephone call | | | 7/29/2010 | | DONE |
|
|
|
t/c w david at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 7/29/2010 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/28/2010 | | 7/28/2010 | | PASS |
Tim L. Woodard
|
|
|
Resubmittals address corrections. TLW
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/28/2010 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 7/28/2010 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - Erosion and Sediment | 7/28/2010 | | 7/28/2010 | | PASS |
Tim L. Woodard
|
|
|
No ESC permit required at this point. However, if the existing ramp is torn out an ESC permit will be required. Called architect and went over these requirements.
|
Plan assigned to (TLW) | 7/14/2010 | | 7/28/2010 | | PASS |
Tim L. Woodard
|
|
|
7/28/2010 11:37:01 TLW - activity updated through activity BLDA022 from case BLD10-01600.
|
Plan resubmittals received | | | 7/27/2010 | | DONE |
|
|
|
received 1 transmittal , and 2 copies of sheets A2.11, A2.21 sent to Tim W
|
Routing - PLAN CHECK | 7/26/2010 | | 7/26/2010 | | PEND |
Tim L. Woodard
|
|
|
Plans are awaiting reply from architect. TLW
|
Routing - FIRE | | | 7/26/2010 | | PASS |
Tim L. Woodard
|
|
|
Field Verify
|
1st review completed | | | 7/26/2010 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 7/26/2010 | | DONE |
Tim L. Woodard
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/14/2010 | | DONE |
|
|
|
|
Application received | | 7/13/2010 | 7/13/2010 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Intake Approval | | | 7/13/2010 | | PASS |
Sam Zahorka
|
|
|
|