Information based on query as of Wednesday, August 14, 2024.
Permit Information
Permit NumberBLD10-01604
StatusFinaled
Name VAN AUKER CONSTRUCTION
Site Address 3491 S TK AVE
Project NameB and D Foods
Customer Number 
ePlanReviewNo
Description
B and D Foods - Warehouse and Freezer Addition - To construct a 12,585 square foot, one story, pre-engineered metal building warehouse and freezer addition on the east side of an existing 26,000 square foot, one story office and warehouse building. The addition will have within it a 4,340 square foot freezer warehouse and an 895 square foot, wood framed mezzanine above the breakroom/restroom area. This permit also includes related site improvements. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  6/1/2016 DONE
Second Notice 5/7/20115/11/2011 DONE
DetailsChristina Prado
Faxed 5-11-11
First Notice4/11/20114/11/20114/27/2011 DONE
DetailsJim Storey
BLD-Final4/11/20114/11/20114/11/2011PPASS
DetailsJim Storey
DOC - Permit Finaled4/11/20114/11/20114/11/2011PPASS
DetailsJim Storey
Zoning Approval4/8/20114/8/20114/8/2011 DONE
DetailsJosh Wilson
Ok to release bond for landscaping
BLD-Aging Inspection3/23/20113/23/20113/23/2011 PASS
DetailsJim Storey
building ok pending permit sign off p$z and esc.
BLD-Final1/20/20111/21/20111/21/2011PPART
DetailsJim Storey
jim Phone #: ###-#### building ok pending bld racking permit sign off as well sa p$z and esc.
FIRE-Final Inspection1/20/20111/21/20111/21/2011APASS
DetailsForrest France
Fire life safety inspection passed after corrections made while on site.
FIRE-Final Inspection1/18/20111/19/20111/19/2011APEND
DetailsForrest France
Fire life safety final pending project related fire sprinkler permit work. Some items incomplete at this time.
Zoning Approval Temp1/18/20111/18/20111/18/2011 PASS
DetailsJosh Wilson
180 temporary occupancy- Bond of $8549.20 has been submitted for landscaping to be completed
PubWorks Occupancy Approval1/14/20111/14/20111/14/2011 DONE
DetailsBrian Murphy
PubWorks Occupancy Approval1/14/20111/14/20111/14/2011 DONE
DetailsTiffany Lowery
FIRE-Sprinkler Rough-in1/12/20111/12/20111/13/2011PPART
DetailsForrest France
Overhead fire sprinkler work okay for cover at the grid ceiling areas.
BLD-Other1/12/20111/12/20111/12/2011PPASS
DetailsJim Storey
ceilling grid
BLD-Grading Inspection1/11/20111/12/20111/12/2011PDEFR
DetailsJim Storey
Jim Phone #: ###-####
Plan Reviewer's activity  1/6/2011 DONE
DetailsTim L. Woodard
Changed required signatures to now include C of O. TLW
BLD-Energy code compliance12/22/201012/27/201012/27/2010APASS
DetailsJim Storey
late am please//Jim Phone #: ###-####
BLD-Framing/Rough-in12/22/201012/23/201012/23/2010PPASS
DetailsJim Storey
Jim Phone #: ###-#### ceilling ok pending ele aproval.
BLD-Footing11/2/201011/3/201011/3/2010APASS
DetailsJim Storey
footing/rebar insp--wants late am--Jim Phone #: ###-#### center peirs as per engineering submited ot frost protection.
BLD-Footing11/2/201011/2/201011/3/2010PPASS
DetailsJim Storey
Jim Phone #: ###-####
BLD-Energy code compliance10/22/201010/25/201010/25/2010APART
DetailsJim Storey
jim Phone #: ###-####
BLD-Foundation10/22/201010/25/201010/25/2010APASS
DetailsJim Storey
jim - rebar Phone #: ###-####
BLD-Footing10/18/201010/19/201010/19/2010APASS
DetailsJim Storey
Footing & Re-bar inspection please-Jim Phone #: ###-#### 1/2 north east walls ok.
BLD-Footing10/12/201010/13/201010/13/2010APASS
DetailsJim Storey
request late am//Dan Phone #: ###-####
Issue PAID IN FULL permit  9/20/2010 DONE
Permit Ready to Issue  8/31/2010  
Telephone call  8/31/2010  
8-31-10 called Gayle Jensen permit ready and fee fiven. Also need ACHD ///dld
Plan assigned to (JCM)7/14/20107/14/20108/30/2010 PASS
DetailsJohn Menard
8/30/2010 14:26:53 JCM - activity updated through activity BLDA022 from case BLD10-01604.
Routing - PLAN CHECK8/27/2010 8/30/2010 PASS
DetailsJohn Menard
Plan Reviewer's activity  8/30/2010 PASS
DetailsJohn Menard
Reviewed and approved structural and nonstructural revisions.JCM
PLANS/APPL TAKEN TO FRONT DESK  8/30/2010 DONE
DetailsJohn Menard
Inspection Record Card- Bld  8/30/2010 DONE
Routing - FIRE8/24/2010 8/27/2010 PASS
DetailsScott Arellano
Please, see attached review.
Routing PW Drainage8/23/2010 8/24/2010 PASS
DetailsBrian Murphy
Routing PW Sewer Rating  8/24/2010 PASS
DetailsBeverly Mountain
Routing - PUBLIC WORKS8/23/2010 8/24/2010 PASS
DetailsBeverly Mountain
Plan resubmittals received  8/23/2010  
DetailsTisha Gallop
received transmittal two copies of response to structural comments, response to fire comments, letter from B & D Foods, letter from engineer, ES Report, and plan sheets A-1, A-2, A-4, A-5, M-1; inserted by Gayle Jensen and taken back to Brian Murphy.
Routing - PLAN CHECK8/13/2010 8/23/2010 FAIL
DetailsJohn Menard
Routing Off Site - STRUCTURAL8/11/2010 8/19/2010 FAIL
DetailsJohn Menard
Received comment list from consulting structural engineer requesting revisions. JCM
Plan resubmittals requested  8/19/2010 DONE
DetailsJohn Menard
E-mailed the applicant a copy of the structural review requesting revisions. JCM
Routing - FIRE8/11/20108/11/20108/13/2010 FAIL
DetailsScott Arellano
Failed Fire, Public Works
Route to Impact Fee Review8/11/20108/16/20108/12/2010 PASS
DetailsCindy M. Gould
Plan resubmittals requested  8/11/2010 DONE
DetailsJohn Menard
E-mailed the applicant a copy of the structural review requesting revisions. JCM
Routing - PLAN CHECK7/28/2010 8/11/2010 FAIL
DetailsJohn Menard
Plan resubmittals received  8/10/2010  
DetailsJohn Menard
rec'd transmittal sheet and calcs and three copies of sheet S.0.1; S-1; S-2; S-3 - inserted and taken back to John
Routing - PLUMBING8/2/2010 8/2/2010 PASS
DetailsBill VanDegrift
per plans and 2003 upc
Plan resubmittals received  8/2/2010  
Recieved 1 cover transmittal 2 copies of Drainage Syste O & M Manual, 5 copies of sheet C-2
Plan resubmittals received  7/29/2010 DONE
Plumbing clarification letter given to Bill VandeGrift
Routing Off Site - STRUCTURAL7/26/2010 7/28/2010 FAIL
DetailsJohn Menard
called Action Couriers for pick up - Received comment list from consulting structural engineer requesting revisions. JCM
Plan resubmittals requested  7/28/2010 DONE
DetailsJohn Menard
E-mailed the applicant a copy of the structural review from the consulting structural engineer requesting revisions. JCM
Routing - PLUMBING7/26/2010 7/28/2010 FAIL
DetailsBill VanDegrift
verify materials of existing sewer and water services prior to plumbing plan approval.
Routing - PLANNING7/28/2010 7/28/2010 PASS
DetailsJosh Wilson
DRH10-00063
Routing - PUBLIC WORKS7/14/2010 7/26/2010 FAIL
DetailsConnie Baumgartner
Routing - Erosion and Sediment7/26/2010 7/26/2010 PASS
DetailsSteven Webb
ESC plan is approved according to the ESC plan and ESC permit conditions. ESC10-00540
Routing PW Sewer Rating7/26/2010 7/26/2010 PASS
DetailsConnie Baumgartner
Routing PW Environmental  7/26/2010 PASS
DetailsWalt Baumgartner
Rvwd by TA, no additional wet processes, warehouse space only
Plan resubmittals received  7/26/2010 DONE
DetailsJohn Menard
Received 3 copies of pre-engineered metal building structural calculations. JCM
Routing PW Drainage7/19/2010 7/23/2010 FAIL
DetailsBrian Murphy
O AND M NEEDS ADDITIONAL INFO. SWALE TREATMENT?
BRIAN MURPHY ###-####
Routing PW Solid Waste7/23/2010 7/23/2010 PASS
DetailsPeter J. McCullough
Plan resubmittals requested  7/20/2010 DONE
DetailsJohn Menard
E-mailed the applicant requesting three sets of the structural calculations for the pre-engineered metal building. JCM
Routing PW Sewer Design7/15/2010 7/19/2010 PASS
DetailsMike Sheppard
Application received 7/14/20107/14/2010 DONE
DetailsAlexandra L. DeYoung
Plans ACCEPTED BY PLAN TECH  7/14/2010 DONE
Routing - PLANNING Land Div7/14/2010 7/14/2010 PASS
DetailsDave Abo
Lot 1 and south 1/2 vacated r-o-w in Broadway Place Subdivision.
Intake Approval  7/14/2010 PASS
DetailsJohn Menard