First Notice | 8/20/2010 | 8/20/2010 | 8/26/2010 | | DONE |
Tom Arcoraci
|
|
|
|
BLD-Final | 8/20/2010 | 8/20/2010 | 8/20/2010 | P | PASS |
Tom Arcoraci
|
|
|
glenn - please call 1/2 hr prior Phone #: ###-####
|
DOC - Permit Finaled | 8/20/2010 | 8/20/2010 | 8/20/2010 | P | PASS |
Tom Arcoraci
|
|
|
|
FIRE-Final Inspection | 8/20/2010 | 8/20/2010 | 8/20/2010 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. I notified Glenn with Darigold that if the new racking that was stacked out in the parking lot was to be installed inside new plans would be required.
|
BLD-Conference | 8/6/2010 | 8/6/2010 | 8/6/2010 | P | PASS |
Tom Arcoraci
|
|
|
Glenn-Please call at least 30 mins prior to inspection Phone #: ###-####
|
FIRE-Final Inspection | 8/5/2010 | 8/6/2010 | 8/6/2010 | A | FAIL |
Troy Cobbley
|
|
|
Maximum storage height signs are to be posted as discussed. Also the new fire sprinkler and fire alarm monitoring system shall be signed off/approved prior to utilizing the racking system. I gave my approval for using the floor area in the racks.
|
BLD-Final | 8/5/2010 | 8/6/2010 | 8/6/2010 | P | CANC |
Tom Arcoraci
|
|
|
glen - please call 1/2 hr prior so he can meet you there Phone #: ###-####
|
Plan assigned to (CDM) | 7/30/2010 | 7/30/2010 | 8/4/2010 | | PASS |
Carl D Madsen
|
|
|
8/4/2010 09:18:49 CDM - activity updated through activity BLDA022 from case BLD10-01645.
|
Routing - PLAN CHECK | 8/3/2010 | | 8/4/2010 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/4/2010 | | |
|
|
|
|
Inspection Record Card- Bld | | | 8/4/2010 | | DONE |
|
|
|
|
Telephone call | | | 8/4/2010 | | DONE |
|
|
|
t/c w glen at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 8/4/2010 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/4/2010 | | DONE |
Tisha Gallop
|
|
|
|
Routing - PLAN CHECK | 7/30/2010 | | 8/3/2010 | | PASS |
Carl D Madsen
|
|
|
|
Routing - FIRE | 8/3/2010 | | 8/3/2010 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
Case Summary (BLD) | | | 8/3/2010 | | DONE |
|
|
|
|
1st review completed | | | 8/3/2010 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/30/2010 | | DONE |
|
|
|
|
Application received | | 7/19/2010 | 7/19/2010 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Intake Approval | | | 7/19/2010 | | PASS |
|
|
|
Needs Architecturallife safety plan CDM
|