Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD10-01664
StatusFinaled
Name GAFFORD CONSTRUCTION INC
Site Address 6001 W CASSIA ST
Project NameBORAH HIGH SCHOOL
Customer Number 
ePlanReviewNo
Description
(BORAH HIGH SCHOOL - KITCHEN REMODEL) NOTE: This building is partially fire sprinklered at the 3 classroom wings only; for allowable area increase. The remainder of the building IS NOT fire sprinklered. Remodel to a 2,530 sq. ft. kitchen area in an existing school building per the approved plans and structural engineering. Work to include: Remove an existing cooler/freezer unit, the existing concrete slab underneath the equipment, (1) non-bearing full height wall, (1) half height wall and (2) existing exhaust fans. Install a new concrete slab, a new cooler/freezer unit, (2) new A/C units and a new hood in the existing kitchen area. All work per the approved plans, Engineering, and attached plan review report. **SRZ/SJA**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 10/2/201110/6/2011 DONE
First Notice9/19/20119/19/20119/22/2011 DONE
DetailsTom Arcoraci
BLD-Final9/16/20119/19/20119/19/2011APASS
DetailsTom Arcoraci
Please call at least 30 mins prior to inspection-Shawn Phone #: ###-####
DOC - Permit Finaled9/19/20119/19/20119/19/2011PPASS
DetailsTom Arcoraci
FIRE-Final Inspection9/16/20119/16/20119/16/2011PPASS
DetailsForrest France
Previously noted correction items verified for completion. Fire life safety finaled.
BLD-Final8/18/20118/19/20118/19/2011PCANC
DetailsJim Storey
call 30 min prior//Shawn Phone #: ###-####
FIRE-Final Inspection8/18/20118/19/20118/19/2011AFAIL
DetailsTim Frost
The main exit from the kitchen has a turn knob not lever hardware. I told Shawn it had to be lever hardware.

I could not test the eggress illumination. Shawn did not know how or where to turn off the breaker. Must be verified at a later date. -TRF-



call 30 min prior//Shawn Phone #: ###-####
Inspection Record Card- Bld  8/12/2011 DONE
BLD-Wall cover8/8/20118/8/20118/8/2011PCANC
DetailsTom Arcoraci
BLD-Framing/Rough-in6/7/20116/7/20116/7/2011PPASS
DetailsTom Arcoraci
BLD-Framing/Rough-in6/6/20116/7/20116/7/2011APASS
DetailsTom Arcoraci
call 30 min prior//Shawn Phone #: ###-####
Issue PAID IN FULL permit  3/21/2011 DONE
DetailsChristina Prado
Extend Review Timeline  1/6/2011 DONE
extended 180 days to 7-15-11 per jason blais
Telephone call  1/5/2011 DONE
left message with margie for pat klien to call me back regarding the expiration of this permit
Telephone call  1/5/2011 DONE
pat klien returned my call - said he was going to apply for an extension
Expiration Notice12/28/20101/20/201112/28/2010 DONE
DetailsPatricia Smith
Routing - PLAN CHECK11/16/2010 11/18/2010 PASS
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  11/18/2010 DONE
DetailsSam Zahorka
Case Summary (BLD)  11/18/2010 DONE
DetailsSam Zahorka
Inspection Record Card- Bld  11/18/2010 DONE
Telephone call  11/18/2010 DONE
t/c w pat klein - permit ready and fees given - also need gc name, rce# and rp
Permit Ready to Issue  11/18/2010 DONE
Details
Plan assigned to (SRZ)7/22/2010 11/18/2010 PASS
DetailsSam Zahorka
Expires on January 17, 2011
Routing - FIRE11/8/2010 11/16/2010 PASS
DetailsScott Arellano
Attached updated IFC comments to plans
Case Summary (BLD)  11/8/2010 DONE
DetailsSam Zahorka
Routing - PLAN CHECK8/13/2010 11/8/2010 PASS
DetailsSam Zahorka
Plan resubmittals received  11/5/2010 DONE
DetailsSam Zahorka
Plan resubmittals received from Pat Klein.
Routing - PLAN CHECK7/30/2010 8/13/2010 FAIL
DetailsSam Zahorka
Plan resubmittals required.
Telephone call  8/13/2010 DONE
DetailsSam Zahorka
I left two messages for Pat Klein the Architect. Clarification and plan resubmittals are to needed.
Routing - FIRE8/13/2010 8/13/2010 FAIL
DetailsScott Arellano
Failed - Plan Check, Fire
1st review completed  8/13/2010 DONE
DetailsSam Zahorka
Routing - MECHANICAL7/28/2010 7/30/2010 PASS
DetailsTroy James
rout plans to Sam
Routing - PLUMBING7/27/2010 7/28/2010 PASS
DetailsBill VanDegrift
Contact mechanical to review after plumbing review. per plans and 2003 upc
Routing - Erosion and Sediment7/26/2010 7/27/2010 PASS
DetailsSteven Webb
ESC plan waiver is approved according to the ESC permit conditions. ESC10-00556
Routing - PUBLIC WORKS7/22/2010 7/26/2010 PASS
DetailsBeverly Mountain
Routing PW Sewer Rating7/26/2010 7/26/2010 PASS
DetailsConnie Baumgartner
Pending Assignment by JCB7/21/2010 7/22/2010 DONE
DetailsJason Blais
Plan resubmittals received  7/22/2010 DONE
DetailsJason Blais
Received Project Special Inspections form completed.
Application received 7/20/20107/21/2010 DONE
DetailsTisha Gallop
Intake Approval  7/20/2010 PASS
DetailsTim L. Woodard
Approved based on Colleen Carroll waiving requirement for CZC and Architect agreeing to email Jason form # 310.
Plans ACCEPTED BY PLAN TECH  7/20/2010 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  7/20/2010  
DetailsTisha Gallop