Permit Information
Permit NumberBLD10-01673
StatusFinaled
Name WRIGHT BROTHERS THE BLDG CO
Site Address 2495 E WARM SPRINGS AVE
Project NameWarm Springs Golf Course
Customer Number 
ePlanReviewNo
Description
Warm Springs Golf Course - Equipment Wash Bay Canopy - To construct a new 280 square foot, one story, pre-engineered metal canopy over a concrete slab for an equipment wash bay area. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 7/12/20118/2/2011 DONE
final value done in combo with Bld10-01589 by C_P
Third Notice 6/18/20116/28/2011 DONE
faxed
Second Notice 6/4/20116/13/2011 DONE
DetailsChristina Prado
E-mailed to Robert Grubb for values
First Notice 5/23/20115/25/2011 DONE
Permanent Occupancy  5/13/2011 DONE
DetailsBarbara Stitt
PubWorks Occupancy Approval5/4/20115/4/20115/4/2011 PASS
DetailsBrian Murphy
BLD-Aging Inspection4/29/20114/29/20114/29/2011 PASS
DetailsDave Hannah
Change Expiration Date Only  4/29/2011 DONE
DetailsBarbara Stitt
Per phone call with Mike from Wright Brothers they are running into issues with asphalt and stripping due weather need to extend another week//BAS
Elevation Cert Rec'd-Final  4/15/2011 DONE
BLD-Final1/28/20111/28/20111/31/2011PPART
DetailsTony Young
temp occ. ok,, needs final letter of okay from engineer and architect on changes and special inspection reports,, also need public works complete sign off
Temporary Occupancy1/28/20114/28/20111/28/2011 DONE
DetailsTisha Gallop
Override - Parcel Holds  1/28/2011  
Override - Parcel Holds  1/28/2011  
FIRE-Final Inspection1/27/20111/27/20111/27/2011PPASS
DetailsForrest France
mike Phone #: ###-####
BLD-Framing/Rough-in12/13/201012/14/201012/14/2010ANR
DetailsJim Storey
michael - ceiling grid Phone #: ###-####
BLD-Framing/Rough-in11/16/201011/19/201011/19/2010APART
DetailsDave Hannah
Michael Phone #: ###-#### office area ok but needs rfi from engineer plans call out wood studs contractor used steel also moved a door in mec room
BLD-Footing11/3/201011/3/201011/3/2010PPASS
DetailsDave Hannah
Mike ###-#### wash station ftgs and column pads
Issue PAID IN FULL permit  10/1/2010 DONE
Plan assigned to (JCM)7/21/20107/21/20109/29/2010 PASS
DetailsJohn Menard
9/29/2010 09:54:14 JCM - activity updated through activity BLDA022 from case BLD10-01673.
Routing - PLANNING9/29/2010 9/29/2010 PASS
DetailsJoshua Johnson
Routing - PLAN CHECK9/29/2010 9/29/2010 PASS
DetailsJohn Menard
PLANS/APPL TAKEN TO FRONT DESK  9/29/2010 DONE
DetailsJohn Menard
Print Occupancy Form  9/29/2010 DONE
Details
Telephone call  9/29/2010 DONE
t/c w michael at ###-#### - permit ready and fees given
Permit Ready to Issue  9/29/2010 DONE
Details
Routing - PUBLIC WORKS9/17/2010 9/28/2010 PASS
DetailsConnie Baumgartner
Routing - PLUMBING9/28/2010 9/28/2010 PASS
DetailsBill VanDegrift
Routing PW Flood Plain9/23/2010 9/23/2010 PASS
DetailsJim Wyllie
Routing PW Drainage9/17/2010 9/22/2010 PASS
DetailsBrian Murphy
Routing PW Sewer Design9/21/2010 9/22/2010 PASS
DetailsJon R. Gunnerson
Connect to 2-inch pressure line provided
Routing PW Environmental9/21/2010 9/21/2010 PASS
DetailsWalt Baumgartner
Exterior covered washpad routes to flamm incpt and to sewer via private on site lift station.
Routing PW Sewer Rating  9/21/2010 PASS
DetailsConnie Baumgartner
Routing - FIRE9/13/2010 9/17/2010 PASS
DetailsScott Arellano
Attached IFC comments to plans
Routing - PLAN CHECK9/1/2010 9/13/2010  
DetailsJohn Menard
Plan resubmittals received  9/9/2010 DONE
DetailsTisha Gallop
received five copies of plan sheet A1.2; inserted by arch. rep. and taken back to John Menard
Routing - PUBLIC WORKS8/30/2010 9/1/2010 FAIL
DetailsConnie Baumgartner
Routing PW Sewer Design8/30/2010 8/31/2010 FAIL
DetailsJon R. Gunnerson
Sanitary sewer service provided is a pressure line, change to pressure rather than gravity.
Routing PW Drainage8/30/2010 8/30/2010 FAIL
DetailsBrian Murphy
NO NEW REVISIONS OLD PLAN
Routing - PLAN CHECK8/26/2010 8/30/2010  
DetailsJohn Menard
Routing - FIRE8/19/20108/19/20108/26/2010 FAIL
DetailsScott Arellano
8-26-10 Faxed and emailed resubmittal items to architect.

8-24-10 Spoke with Slichter architects and informed them of the need to verify the existing fire hydrant fire flow. The Fire Flow documentation submitted does not correlate with the specific qualifying fire hydrant on plans. A minimum 1500 gpm, with 20 psi residual pressure, is requried for this new building.
1st review completed  8/26/2010 FAIL
Failed Public Works, Erosion & Soil Control, Structural, Plumbing, Planning, Plan Check, Fire
Route to Impact Fee Review8/19/20108/24/20108/20/2010 PASS
DetailsCindy M. Gould
Canopy, no impact fees
Routing - PLAN CHECK8/18/2010 8/19/2010 FAIL
DetailsJohn Menard
Routing - Erosion and Sediment8/17/2010 8/18/2010 PASS
DetailsJohn Menard
Routing - PLANNING8/13/2010 8/16/2010 FAIL
DetailsJoshua Johnson
Required staff level approvals have not been obtained
Routing - PLUMBING  8/13/2010 FAIL
DetailsBill VanDegrift
see bld10-01589 for review comments
Routing - PUBLIC WORKS7/26/2010 8/10/2010 FAIL
DetailsConnie Baumgartner
Failed by Brian Murphy ###-####
Jim Wylie ###-####
Mike Sheppard - ###-####
Routing PW Flood Plain8/6/2010 8/6/2010 FAIL
DetailsJim Wyllie
Elevation Certificate not provided. Jim Wyllie / ###-####
Routing PW Drainage7/30/2010 8/5/2010 FAIL
DetailsBrian Murphy
NEEDS OWN O AND M
Routing PW Sewer Design7/29/2010 7/30/2010 FAIL
DetailsMike Sheppard
Channge gravity sewer service line to a pressure sewer service system.
Routing - Addressing7/28/2010 7/28/2010 PASS
DetailsApril Wing
Routing - PLANNING Land Div7/22/2010 7/26/2010 PASS
DetailsTodd Tucker
Application received 7/21/2010   
Routing - Erosion and Sediment8/10/2010    
DetailsSteven Webb