BLD-Final | 9/27/2011 | 9/28/2011 | 9/28/2011 | A | PASS |
Jim Sly
|
|
|
dennis Phone #: ###-####
|
DOC - Permit Finaled | 9/28/2011 | 9/28/2011 | 9/28/2011 | P | PASS |
Jim Sly
|
|
|
|
BLD-Energy code compliance | 8/2/2011 | 8/2/2011 | 8/2/2011 | P | PASS |
Jim Sly
|
|
|
Dennis Phone #: ###-####
|
BLD-Framing/Rough-in | 7/22/2011 | 7/22/2011 | 7/22/2011 | P | PASS |
Tom Arcoraci
|
|
|
Dennis Phone #: ###-####
|
BLD-Aging Inspection | 4/14/2011 | 4/14/2011 | 4/21/2011 | | PART |
Tom Arcoraci
|
|
|
|
BLD-Final | 1/10/2011 | 1/10/2011 | 1/10/2011 | P | NR |
Jim Sly
|
|
|
Dennis phone
|
BLD-Final | 1/7/2011 | 1/7/2011 | 1/10/2011 | P | CANC |
Jim Sly
|
|
|
Dennis phone Re-sched.....
|
BLD-Concrete | 8/20/2010 | 8/20/2010 | 8/20/2010 | P | PASS |
Jim Sly
|
|
|
paul Phone #: ###-####
|
BLD-Footing | 8/18/2010 | 8/19/2010 | 8/19/2010 | A | PASS |
Jim Sly
|
|
|
paul Phone #: ###-####
|
Issue PAID IN FULL permit | | | 8/10/2010 | | |
|
|
|
|
OVERRIDE | | | 8/9/2010 | | |
|
|
|
|
Telephone call | | | 8/9/2010 | | DONE |
Barbara Stitt
|
|
|
Left voice message that permit ready & fees due on 8-9-10 @ 10:15am
|
Permit Ready to Issue | | | 8/9/2010 | | DONE |
Barbara Stitt
|
|
|
|
Route to Impact Fee Review | 7/21/2010 | 7/26/2010 | 8/6/2010 | | PASS |
Cindy M. Gould
|
|
|
|
Plan assigned to (CDM) | 7/22/2010 | 7/22/2010 | 8/6/2010 | | DONE |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 8/4/2010 | | 8/6/2010 | | PASS |
Carl D Madsen
|
|
|
|
Case Summary (BLD) | | | 8/6/2010 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/6/2010 | | |
|
|
|
|
Inspection Record Card- Bld | | | 8/6/2010 | | DONE |
|
|
|
|
Plan resubmittals received | | | 8/4/2010 | | DONE |
Tisha Gallop
|
|
|
received two copies of full new set of plans and reduced site plan; taken to Carl Madsen
|
Routing - PLANNING | 8/4/2010 | | 8/4/2010 | | PASS |
Todd Tucker
|
|
|
|
Routing - PLAN CHECK | 7/27/2010 | | 7/27/2010 | | FAIL |
Carl D Madsen
|
|
|
Failed review pending redesign of structure to meet planning requirements. CDM 7-27-10
|
Telephone call | | | 7/27/2010 | | DONE |
Todd Tucker
|
|
|
I spoke with Dennis McCoy about the house not meeting the setbacks. He said that they would discuss it at their 7/27 Staff Meeting.
|
1st review completed | | | 7/27/2010 | | FAIL |
|
|
|
Failed pending redesign of structure to meet planning requirements. CDM 7-27-10
|
Routing - PUBLIC WORKS | 7/22/2010 | | 7/26/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLANNING | 7/26/2010 | | 7/26/2010 | | FAIL |
Todd Tucker
|
|
|
The house must face W. Palm Street making it the front property line. As such, the setbacks are as follows:
Front (south) - 15' living
Rear (north) - 15'
Side (west) - 5'
Side (east) - 5' living - 20' parking
The proposed house as sited on the lot does not comply with the minimum setbacks as requried by the Zoning Ordinance.
|
Routing - Addressing | 7/22/2010 | | 7/22/2010 | | PASS |
April Wing
|
|
|
|
Intake Approval | | | 7/22/2010 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/22/2010 | | |
|
|
|
|
Application received | | 7/21/2010 | 7/21/2010 | | DONE |
Darla L Downs
|
|
|
|