Case Summary (BLD) | | | 4/13/2016 | | DONE |
|
|
|
|
Third Notice | | 5/30/2011 | 6/8/2011 | | DONE |
|
|
|
|
Second Notice | | 5/21/2011 | 5/25/2011 | | DONE |
|
|
|
|
First Notice | | 5/2/2011 | 5/11/2011 | | DONE |
|
|
|
|
Permanent Occupancy | | | 4/26/2011 | | DONE |
Tisha Gallop
|
|
|
reprint Occupancy Certificate with new language "This building is not fire sprinklered"; mailed to tenant at project address.
|
Permanent Occupancy | | | 4/22/2011 | | DONE |
Tisha Gallop
|
|
|
|
FIRE-Final Inspection | 4/18/2011 | 4/19/2011 | 4/19/2011 | A | PASS |
Forrest France
|
|
|
Correction items verified for completion. Life safety passed.
|
BLD-Final | 4/15/2011 | 4/19/2011 | 4/19/2011 | A | PASS |
Jim Storey
|
|
|
mike Phone #: ###-#### 10;00 final ok
|
Print Occupancy Form | | | 4/19/2011 | | DONE |
|
|
|
|
FIRE-Final Inspection | 4/18/2011 | 4/18/2011 | 4/18/2011 | P | FAIL |
Forrest France
|
|
|
Items for final include: Provide a current certification tag for the fire extinguisher, provide approved hardware and signage at the tenant main entry/exit door, cover exposed electrical wiring at a junction box in the NW storage closet, post premise ID- building address/suite numbers.
|
Override - Parcel Holds | 4/18/2011 | 1/1/1900 | 4/18/2011 | | |
|
|
|
Fire life/safety
|
BLD-Final | 4/15/2011 | 4/15/2011 | 4/15/2011 | P | DEFR |
Jim Storey
|
|
|
mike Phone #: ###-#### need fire resch for tue.
|
Override - Parcel Holds | 4/15/2011 | 1/1/1900 | 4/15/2011 | | |
|
|
|
bld investigation fees paid
|
BLD-Aging Inspection | 3/28/2011 | 3/28/2011 | 3/28/2011 | | PART |
Jim Storey
|
|
|
pending plm permit and insp.
|
BLD-Conference | 1/20/2011 | 1/24/2011 | 1/24/2011 | A | PART |
Jim Storey
|
|
|
Mike Phone #: ###-#### reviewed handrail requriments. pending plm insp.
|
Issue PAID IN FULL permit | | | 1/10/2011 | | DONE |
|
|
|
|
Telephone call | | | 1/5/2011 | | DONE |
|
|
|
t/c w larry - called to remind him that this permit will expire soon - he said that he will be down in the next day or two and pick it up
|
Expiration Notice | 12/30/2010 | 1/24/2011 | 12/30/2010 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 11/9/2010 | | |
|
|
|
called Mike and left vm that we received authorization from owner, can pick up permit, fees and need GC & RCE/T.
|
Override - Parcel Holds | | | 11/9/2010 | | |
|
|
|
|
Permit Ready to Issue | | | 11/9/2010 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 11/5/2010 | | DONE |
Tisha Gallop
|
|
|
Called number for Larry Grant and spoke to Mike. I told him there was a misunderstanding and permit will not be ready for another week or so because the BO still has to send out another letter to the owner before we can release the permit. Mike said he will call BO to see what next step is.
|
CHANGE STATUS TO (PND) | | | 11/5/2010 | | DONE |
Tisha Gallop
|
|
|
permit not ready yet.
|
Print Occupancy Form | | | 11/4/2010 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 11/4/2010 | | DONE |
Tisha Gallop
|
|
|
ok to issue permit per Bob Archibald
|
Telephone call | | | 11/4/2010 | | DONE |
Tisha Gallop
|
|
|
called Larry Grant and left voice message that permit is ready, fees and need GC & RCE/T.
|
MISC ACTIONS | | | 10/15/2010 | | PEND |
Bob Archibald
|
|
|
Site conference with Mike(tenant) and BO Jason. reviewed last response from building owner and again reviewed bearing wall from southern part of kitchen to northern entrance on main floor. Requested tenant install handrails on stairway to "Clippers" pending approval from owner on release of permit for TI. Mike will contact me when handrails are complete.
|
MISC ACTIONS | | | 9/28/2010 | | PEND |
Bob Archibald
|
|
|
Follow-up email requesting approval and supplying requested documents.
|
MISC ACTIONS | | | 9/24/2010 | | PEND |
Bob Archibald
|
|
|
Emailed building owner requesting written approval for issuance.
|
Plan assigned to (TLW) | 7/26/2010 | | 9/23/2010 | | PASS |
Tim L. Woodard
|
|
|
9/23/2010 15:55:57 TLW - activity updated through activity BLDA022 from case BLD10-01698.
|
Routing - PLAN CHECK | 9/16/2010 | | 9/23/2010 | | PASS |
Tim L. Woodard
|
|
|
Pass with Redlines and Comments
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/23/2010 | | DONE |
Tim L. Woodard
|
|
|
|
Plan Reviewer's activity | | | 9/23/2010 | | DONE |
Tim L. Woodard
|
|
|
Plans are ready for issuance. Awaiting approval from the owner. Bob Archibald is holding these plans until approval is given. TLW
|
Case Summary (BLD) | | | 9/23/2010 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - PLUMBING | 9/13/2010 | | 9/16/2010 | | PASS |
Bill VanDegrift
|
|
|
per plans and 2003 upc, additional cross connection protection may be required. trap primer is required on the hub drain trap if furnace is not a condensing type.
|
Routing - PLAN CHECK | 8/12/2010 | | 9/13/2010 | | PEND |
Tim L. Woodard
|
|
|
Plans routed to Plumbing Plan Review.
|
Case Summary (BLD) | | | 9/8/2010 | | DONE |
|
|
|
|
Plan resubmittals received | | | 9/8/2010 | | |
Tim L. Woodard
|
|
|
rec'd 2 copies of sheets M1.0 & M0.0 - taken to tim w
|
Routing - PLUMBING | 8/5/2010 | | 8/12/2010 | | FAIL |
Bill VanDegrift
|
|
|
provide engineered plumbing plans
|
Plan resubmittals received | | | 8/10/2010 | | |
Tim L. Woodard
|
|
|
rec'd two copies of sheets 1-5 - taken to Tim
|
Routing - PLAN CHECK | 7/29/2010 | | 8/4/2010 | | FAIL |
Tim L. Woodard
|
|
|
Refer to plan review report. TLW
|
1st review completed | | | 8/4/2010 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - PUBLIC WORKS | 7/28/2010 | | 7/29/2010 | | PASS |
Beverly Mountain
|
|
|
|
Routing PW Sewer Rating | 7/28/2010 | | 7/28/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 7/26/2010 | | 7/28/2010 | | PASS |
April Wing
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/26/2010 | | |
|
|
|
|
Application received | | 7/23/2010 | | | |
|
|
|
|