Permit Information
Permit NumberBLD10-01698
StatusFinaled
Name BUTLER CONSTRUCTION
Site Address 1301 S CAPITOL BLVD STE 201
Project NameClippers / Totem Building
Customer Number 
ePlanReviewNo
Description
(CLIPPERS - Totem Building - Ste # 201) Permit is to remodel a 900 square foot existing office tenant space. Approval contingent upon adhering to the approved plans on file. Work to include: construction of interior non-bearing walls to create a an office, construction of 4 ft. tall half walls to create stylist spaces, installation of 5 new sinks, and finishes in compliance with chapter 8 of the 2006 IBC. This building is not fire sprinklered. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  4/13/2016 DONE
Third Notice 5/30/20116/8/2011 DONE
Second Notice 5/21/20115/25/2011 DONE
First Notice 5/2/20115/11/2011 DONE
Permanent Occupancy  4/26/2011 DONE
DetailsTisha Gallop
reprint Occupancy Certificate with new language "This building is not fire sprinklered"; mailed to tenant at project address.
Permanent Occupancy  4/22/2011 DONE
DetailsTisha Gallop
FIRE-Final Inspection4/18/20114/19/20114/19/2011APASS
DetailsForrest France
Correction items verified for completion. Life safety passed.
BLD-Final4/15/20114/19/20114/19/2011APASS
DetailsJim Storey
mike Phone #: ###-#### 10;00 final ok
Print Occupancy Form  4/19/2011 DONE
FIRE-Final Inspection4/18/20114/18/20114/18/2011PFAIL
DetailsForrest France
Items for final include: Provide a current certification tag for the fire extinguisher, provide approved hardware and signage at the tenant main entry/exit door, cover exposed electrical wiring at a junction box in the NW storage closet, post premise ID- building address/suite numbers.
Override - Parcel Holds4/18/20111/1/19004/18/2011  
Fire life/safety
BLD-Final4/15/20114/15/20114/15/2011PDEFR
DetailsJim Storey
mike Phone #: ###-#### need fire resch for tue.
Override - Parcel Holds4/15/20111/1/19004/15/2011  
bld investigation fees paid
BLD-Aging Inspection3/28/20113/28/20113/28/2011 PART
DetailsJim Storey
pending plm permit and insp.
BLD-Conference1/20/20111/24/20111/24/2011APART
DetailsJim Storey
Mike Phone #: ###-#### reviewed handrail requriments. pending plm insp.
Issue PAID IN FULL permit  1/10/2011 DONE
Telephone call  1/5/2011 DONE
t/c w larry - called to remind him that this permit will expire soon - he said that he will be down in the next day or two and pick it up
Expiration Notice12/30/20101/24/201112/30/2010 DONE
DetailsPatricia Smith
Telephone call  11/9/2010  
called Mike and left vm that we received authorization from owner, can pick up permit, fees and need GC & RCE/T.
Override - Parcel Holds  11/9/2010  
Permit Ready to Issue  11/9/2010 DONE
DetailsTisha Gallop
Telephone call  11/5/2010 DONE
DetailsTisha Gallop
Called number for Larry Grant and spoke to Mike. I told him there was a misunderstanding and permit will not be ready for another week or so because the BO still has to send out another letter to the owner before we can release the permit. Mike said he will call BO to see what next step is.
CHANGE STATUS TO (PND)  11/5/2010 DONE
DetailsTisha Gallop
permit not ready yet.
Print Occupancy Form  11/4/2010 DONE
DetailsTisha Gallop
Permit Ready to Issue  11/4/2010 DONE
DetailsTisha Gallop
ok to issue permit per Bob Archibald
Telephone call  11/4/2010 DONE
DetailsTisha Gallop
called Larry Grant and left voice message that permit is ready, fees and need GC & RCE/T.
MISC ACTIONS  10/15/2010 PEND
DetailsBob Archibald
Site conference with Mike(tenant) and BO Jason. reviewed last response from building owner and again reviewed bearing wall from southern part of kitchen to northern entrance on main floor. Requested tenant install handrails on stairway to "Clippers" pending approval from owner on release of permit for TI. Mike will contact me when handrails are complete.
MISC ACTIONS  9/28/2010 PEND
DetailsBob Archibald
Follow-up email requesting approval and supplying requested documents.
MISC ACTIONS  9/24/2010 PEND
DetailsBob Archibald
Emailed building owner requesting written approval for issuance.
Plan assigned to (TLW)7/26/2010 9/23/2010 PASS
DetailsTim L. Woodard
9/23/2010 15:55:57 TLW - activity updated through activity BLDA022 from case BLD10-01698.
Routing - PLAN CHECK9/16/2010 9/23/2010 PASS
DetailsTim L. Woodard
Pass with Redlines and Comments
PLANS/APPL TAKEN TO FRONT DESK  9/23/2010 DONE
DetailsTim L. Woodard
Plan Reviewer's activity  9/23/2010 DONE
DetailsTim L. Woodard
Plans are ready for issuance. Awaiting approval from the owner. Bob Archibald is holding these plans until approval is given. TLW
Case Summary (BLD)  9/23/2010 DONE
DetailsTim L. Woodard
Routing - PLUMBING9/13/2010 9/16/2010 PASS
DetailsBill VanDegrift
per plans and 2003 upc, additional cross connection protection may be required. trap primer is required on the hub drain trap if furnace is not a condensing type.
Routing - PLAN CHECK8/12/2010 9/13/2010 PEND
DetailsTim L. Woodard
Plans routed to Plumbing Plan Review.
Case Summary (BLD)  9/8/2010 DONE
Plan resubmittals received  9/8/2010  
DetailsTim L. Woodard
rec'd 2 copies of sheets M1.0 & M0.0 - taken to tim w
Routing - PLUMBING8/5/2010 8/12/2010 FAIL
DetailsBill VanDegrift
provide engineered plumbing plans
Plan resubmittals received  8/10/2010  
DetailsTim L. Woodard
rec'd two copies of sheets 1-5 - taken to Tim
Routing - PLAN CHECK7/29/2010 8/4/2010 FAIL
DetailsTim L. Woodard
Refer to plan review report. TLW
1st review completed  8/4/2010 DONE
DetailsTim L. Woodard
Routing - PUBLIC WORKS7/28/2010 7/29/2010 PASS
DetailsBeverly Mountain
Routing PW Sewer Rating7/28/2010 7/28/2010 PASS
DetailsConnie Baumgartner
Routing - Addressing7/26/2010 7/28/2010 PASS
DetailsApril Wing
Plans ACCEPTED BY PLAN TECH  7/26/2010  
Application received 7/23/2010