Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD10-01726
StatusFinaled
Name ELIZABETH VO
Site Address 8137 W FAIRVIEW AVE
Project NameShopko Plaza / Allay Spa
Customer Number 
ePlanReviewNo
Description
(ALLAY SPA - Shopko Plaza) Permit is to remodel an existing 1,000 square foot yogurt shop (BLD08-00633 - Cold Fusion Frozen Yogurt) to become a new spa. Approval contingent upon adhering to the approved plans on file. Work to include: [construction of interior non-bearing walls to relocate a fully accessible bathroom, to create a waxing room, and to provide ventilation to all nail stations],installation of new plumbing, installation of new mechanical point source ventilation, installation of new accessible counter, and finishes in compliance with chapter 8 of the 2006 IBC. This building is not fire sprinklered. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Telephone call  6/7/2011 DONE
DetailsTisha Gallop
per e-mail from Christina Wellman (Wellman Const) send bill for final value fees to applicant Elizabeth Vo.
Third Notice 3/31/20113/21/2011 DONE
Telephone call  3/21/2011 DONE
DetailsTisha Gallop
spoke with Elizabeth Vo from Allay Spa. She said the GC, Wellman Construction, defauleted on their contract and didn't complete some finish work and carpentry. She doesn't know what the breakdown was for the subcontractors because the GC contracted with them. I told her just to fill out what she has paid Wellman construction and I will continue to try to contact Wellman for the breakdown. //Wellman Construction put on hold until complete final cert of value submitted to Boise City.
Third Notice 3/17/20113/17/2011 DONE
mailed to GC and applicant
Third Notice 2/9/20113/3/2011 DONE
mailed
Second Notice 1/30/20112/4/2011 DONE
First Notice 12/13/20101/20/2011 DONE
BLD-Final12/2/201012/3/201012/3/2010PPASS
DetailsMike Jordan
Christina Phone #: ###-####. ok for perm. occ.
Print Occupancy Form  12/3/2010 DONE
DetailsChristina Prado
Permanent Occupancy  12/3/2010 DONE
DetailsChristina Prado
BLD-Final10/22/201010/22/201010/22/2010PPART
DetailsMike Jordan
Christina Phone #: ###-####. Ok for temp. occ.
FIRE-Final Inspection10/21/201010/21/201010/21/2010PPASS
DetailsTroy Cobbley
life safety passed
FIRE-Final Inspection10/19/201010/19/201010/19/2010PFAIL
DetailsTroy Cobbley
Provide single action approved hardware on the front exit door
FIRE-Final Inspection10/18/201010/19/201010/19/2010AFAIL
DetailsTroy Cobbley
Left message on contacts voice mail. Went to the project site but it was locked up with no access. No inspection was performed. jim Phone #: ###-####
Case Summary (BLD)  10/14/2010 DONE
BLD-Other10/11/201010/11/201010/11/2010PPASS
DetailsJim Sly
jim - ceiling grid Phone #: ###-####
Print Occupancy Form  10/6/2010  
BLD-Framing/Rough-in9/7/20109/7/20109/7/2010PPASS
DetailsMike Jordan
Shear nailing inspection please-Jim Phone #: ###-####. patch backs at 2hr. firewall ok.
BLD-Framing/Rough-in8/30/20108/30/20108/30/2010PPASS
DetailsMike Jordan
Jim Phone #: ###-####. INterior steel studs for restroom and massage room only.
BLD-Conference8/18/20108/19/20108/19/2010APASS
DetailsMike Jordan
Jim-Regarding metal studs Phone #: ###-####. ok to reuse the proposed metal studs.
Issue PAID IN FULL permit  8/12/2010 DONE
Plan assigned to (TLW)7/27/2010 8/11/2010 PASS
DetailsTim L. Woodard
8/11/2010 13:51:15 TLW - activity updated through activity BLDA022 from case BLD10-01726.
Routing - PLAN CHECK8/9/2010 8/11/2010 PASS
DetailsTim L. Woodard
1st review completed  8/11/2010 DONE
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  8/11/2010 DONE
DetailsTim L. Woodard
Case Summary (BLD)  8/11/2010 DONE
DetailsTim L. Woodard
Print Occupancy Form  8/11/2010 DONE
Permit Ready to Issue  8/11/2010 DONE
Telephone call  8/11/2010 DONE
DetailsBarbara Stitt
Called James Marsh and told him that permit is ready & fees due on 8-11-10 @ 4:40pm BAS
Intake Approval  8/11/2010 PASS
DetailsTim L. Woodard
Approved
Routing - MECHANICAL8/5/2010 8/9/2010 PASS
DetailsTroy James
Routing - PLUMBING  8/9/2010 PASS
DetailsBill VanDegrift
plans anpproved with no water to chairs
Plan resubmittals received  8/4/2010  
DetailsTim L. Woodard
rec'd 2 copies of sheet M1.1 & P1.1 - taken to Tim
Routing - PLAN CHECK8/2/2010 8/3/2010 FAIL
DetailsTim L. Woodard
Waiting for submittal of plumbing and mechanical drawings. TLW
1st review completed  8/3/2010 DONE
DetailsTim L. Woodard
Routing - PLUMBING  8/2/2010 FAIL
DetailsBill VanDegrift
provide a piping plan for dwvand water
Routing - MECHANICAL7/29/2010 7/30/2010 FAIL
DetailsTroy James
Routed plans to Bill for Plumbing Review.

1. Provide fresh air ventilation design on plans per IMC Table 403.3 for nail salons.
2. Note on plans that new exhaust fan for manicure stations shall be interlocked with lights over the manicure stations.
3. Note on plans how you will make-up the air being exhausted.
Routing - PLAN CHECK7/28/2010 7/29/2010 PEND
DetailsTim L. Woodard
routed to mech. plumbing for review first.
Routing PW Sewer Rating7/28/2010 7/28/2010 PASS
DetailsConnie Baumgartner
Routing - Addressing7/27/2010 7/28/2010 PASS
DetailsApril Wing
Routing - PUBLIC WORKS7/28/2010 7/28/2010 PASS
DetailsConnie Baumgartner
Application received 7/27/20107/27/2010 DONE
DetailsAlexandra L. DeYoung
Plans ACCEPTED BY PLAN TECH  7/27/2010 DONE