Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD10-01733
StatusFinaled
Name ST ALPHONSUS REG MED CEN INC
Site Address 1055 N CURTIS RD
Project NameSt Alphonsus south tower
Customer Number 
ePlanReviewNo
Description
(ST ALPHONSUS - SOUTH TOWER - 1st FLR - Hyperbaric Chamber Remodel) Permit is to remodel a 574 square foot office area within an existing hospital for two Hyperbaric Chambers. Approval contingent upon adhering to the approved plans on file. Work to include: installation of hyperbaric chambers, installation of new oxygen piping, installation of new accessible counter, installation of new electrical, and finishes in compliance with chapter 8 of the 2006 IBC. This building is fully fire sprinklered any alterations or modifications to the sprinkler system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA #13 as regulated by the fire department. Racking that exceeds 8 ft. in height requires a separate Building Permit be submitted and approved before installation. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 4/5/20114/4/2011 DONE
This permit finaled on the web by Brandon Byington
Second Notice 3/28/20113/31/2011 DONE
DetailsChristina Prado
Faxed 3-31-11
First Notice3/10/20113/10/20113/18/2011 DONE
DetailsTom Arcoraci
BLD-Final3/10/20113/10/20113/10/2011PPASS
DetailsTom Arcoraci
cecil Phone #: ###-####
DOC - Permit Finaled3/10/20113/10/20113/10/2011PPASS
DetailsTom Arcoraci
FIRE-Final Inspection2/1/20112/1/20112/1/2011PPASS
DetailsTroy Cobbley
Life safety passed
BLD-Conference12/28/201012/29/201012/29/2010APASS
DetailsTom Arcoraci
BLD-Aging Inspection12/28/201012/28/201012/28/2010 PASS
DetailsTom Arcoraci
Issue PAID IN FULL permit  9/28/2010 DONE
DetailsTisha Gallop
OVERRIDE  8/16/2010  
Telephone call  8/16/2010  
DetailsBarbara Stitt
Called Sam Burrows and told him that permit is ready, fees due, need GC info and RP info on 8-16-10 @ 9:30am BAS
Permit Ready to Issue  8/16/2010 DONE
DetailsBarbara Stitt
Inspection Record Card- Bld  8/13/2010 DONE
Routing - PLAN CHECK8/13/2010 8/13/2010 PASS
DetailsTim L. Woodard
Refer to plan review report for penetration details. TLW
PLANS/APPL TAKEN TO FRONT DESK  8/13/2010 DONE
DetailsTim L. Woodard
Case Summary (BLD)  8/13/2010 DONE
DetailsTim L. Woodard
Plan resubmittals received  8/10/2010 DONE
DetailsTisha Gallop
received one transmittal and one copy of Exitway Plan; taken to Tim Woodard.
Plan assigned to (TLW)7/27/2010 8/6/2010 PASS
DetailsTim L. Woodard
8/6/2010 10:07:12 TLW - activity updated through activity BLDA022 from case BLD10-01733.
Routing - PLAN CHECK7/29/2010 8/6/2010 FAIL
DetailsTim L. Woodard
Waiting to here from Sam Burrows on Rated Exit Enclosures. TLW Placed call at 11:15 am.
Routing - FIRE  8/6/2010 PASS
DetailsTim L. Woodard
Field Verify Compliance. TLW
1st review completed  8/6/2010 DONE
DetailsTim L. Woodard
Routing - PUBLIC WORKS7/27/2010 7/29/2010 PASS
DetailsConnie Baumgartner
Routing PW Sewer Rating7/29/2010 7/29/2010 PASS
DetailsConnie Baumgartner
Routing - Addressing7/28/2010 7/28/2010 PASS
DetailsApril Wing
Application received 7/27/20107/27/2010 DONE
DetailsDarla L Downs
Plans ACCEPTED BY PLAN TECH  7/27/2010 DONE
ok per Tim Woodard to take in as a level 2
Recd Pcfee & Taken To Pln CK  7/27/2010 DONE
Intake Approval  7/27/2010 PASS
DetailsTim L. Woodard