Permit NumberBLD10-01738
StatusFinaled
Name KNIFE RIVER CONSTRUCTION
Site Address 5450 W GOWEN RD
Project Name 
Customer Number 
ePlanReviewNo
Description
Knife River - Concrete Batch Plant - To construct a new 1,335 square foot, one story, wood framed concrete batch plant building and related site improvements. This building was previously constructed without a permit. All construction per the approved plans. JCM
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/28/201211/28/201211/28/2012PPASS
DetailsJim Storey
Brian in Public Works has approved site drainage. All other trades approved ok for issuance of CO.
Permanent Occupancy  11/28/2012 DONE
DetailsTisha Gallop
Issue Perm C of O and mailed to Knife River per Bob Archibald.
PubWorks Occupancy Approval11/20/201211/20/201211/20/2012 DONE
DetailsTiffany Lowery
Plan Reviewer's activity  10/8/2012 DONE
DetailsJason Blais
Communicated that Public Works still needs to sign off on the site drainage. A PW inspection occurred but did not pass.
Zoning Approval9/26/20129/26/20129/26/2012 PASS
DetailsJosh Wilson
BLD-Final9/25/20129/25/20129/25/2012PNR
DetailsTom Arcoraci
Jesse Phone #: ###-####
FIRE-Final Inspection9/19/20129/24/20129/24/2012APASS
DetailsTroy Cobbley
Life safety passed
BLD-Aging Inspection7/19/20127/19/20127/20/2012 DEFR
DetailsJim Storey
. I deferred him to Scott Arellano for approval
FIRE-Conference4/18/20124/18/20124/18/2012PDONE
DetailsTroy Cobbley
Met Jesse on site and went over door hardware requirements and fire extinguisher requirements. He wants to supply the new fire hydrant from the west side of the site insteand of from a main on the south side. I deferred him to Scott Arellano for approval. He is hoping to have this completed within 3 weeks.
BLD-Other4/2/20124/2/20124/2/2012APART
DetailsJim Storey
Plumbing and electrical have been approved. Fire hydrant installation required for final occupancy.
FIRE-Conference3/14/20123/15/20123/15/2012ADONE
DetailsTroy Cobbley
I stopped at job site and the receptionist contacted Jesse and we spoke over the phone about getting the life safety inspection performed. He stated that the new fire hydrant would not be installed for another 3 weeks. I set up a re-inspection conference for three weeks from now for a follow up.
BLD-Conference2/2/20122/2/20122/2/2012PPART
DetailsJim Storey
droped off c/o requist card. jessi out of town will be back monday is to contact j gilland or j blaze.
Print Occupancy Form  1/26/2012 DONE
DetailsTisha Gallop
BLD-Final1/17/20121/18/20121/18/2012APART
DetailsJim Storey
John Phone #: ###-#### building ok for final letter from engineer on file. fire line and bearm to be instaled soon. pending all sign offs.
Plan Reviewer's activity  1/17/2012 DONE
DetailsJason Blais
Sent email to registered design professional in responsible charge regarding status to final and obtain plumbing & electrical permits.
BLD-Other10/28/201110/28/201110/31/2011PNR
DetailsJim Storey
Check Status. Ready for final? 110.5 Inspection requests.
It shall be the duty of the holder of the building permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspections of such work that are required by this code.
BLD-Conference9/28/20119/29/20119/29/2011APASS
DetailsJim Storey
john Phone #: ###-#### reviewed plan and hardware will be ready for insp. next week.
BLD-Other8/2/20118/3/20118/3/2011APASS
DetailsJim Storey
See what we can do to final this permit out. conf. jesse w/knife river should be complet in 2 wk.
Issue PAID IN FULL permit  7/1/2011 DONE
DetailsTisha Gallop
Expiration Notice6/29/20117/21/20116/29/2011 DONE
DetailsPatricia Smith
PLANS/APPL TAKEN TO FRONT DESK  4/22/2011 DONE
DetailsJohn Menard
Print Occupancy Form  4/22/2011 DONE
Permit Ready to Issue  4/22/2011 DONE
DetailsBarbara Stitt
Telephone call  4/22/2011 DONE
DetailsBarbara Stitt
Left a message for David Glancey that permit is ready, fees due, need ACHD information and GC information on 4-22-11 @ 1:45pm
Routing - PLAN CHECK4/22/2011 4/22/2011 PASS
DetailsJohn Menard
Routing - PUBLIC WORKS4/14/2011 4/22/2011 PASS
DetailsConnie Baumgartner
Plan assigned to (JCM)7/28/2010 4/22/2011 PASS
DetailsJohn Menard
Routing PW Drainage4/14/2011 4/21/2011 PASS
DetailsBrian Murphy
Plan resubmittals received  4/20/2011  
DetailsBarbara Stitt
Received 1 response letter from Scott Wonders dated 4-20-11, and 5 copies of sheet 1 and took to Brian Murphy's desk
Routing - PUBLIC WORKS3/29/2011 4/6/2011 FAIL
DetailsConnie Baumgartner
Routing - PLAN CHECK2/18/2011 3/29/2011  
DetailsJohn Menard
Plan resubmittals received  3/29/2011 DONE
DetailsTisha Gallop
received transmittal, handout on Nyoplast Snout Structure, two copies of Drainage Calcs and O & M Manual; put with plans with John Menard.
Routing - PLUMBING2/16/2011 2/18/2011 PASS
DetailsBill VanDegrift
per plans and 2003 upc
Routing - PLAN CHECK1/21/2011 2/16/2011  
DetailsJohn Menard
Plan resubmittals received  2/16/2011 DONE
DetailsChristina Prado
received transmittal; response memo and two copies of plan sheet 1 of 1; inserted by arch. rep. and taken back to John Menard.
Plan Reviewer's activity  1/24/2011 PASS
DetailsJohn Menard
Reviewed and approved plan revisions. JCM
Routing - FIRE1/18/2011 1/21/2011 PASS
DetailsTim Frost
Please see attached review
Extend Review Timeline  1/20/2011 DONE
DetailsJason Blais
Routing - PLAN CHECK12/21/2010 1/18/2011  
DetailsJohn Menard
Plan resubmittals received  1/18/2011 DONE
DetailsTisha Gallop
received transmittal; response memo and two copies of plan sheets SD1.1, SD1.2, FD1.1, A1.1, A4.1; inserted by arch. rep. and taken back to John Menard.
Routing Off Site - STRUCTURAL12/20/2010 1/3/2011 PASS
DetailsJohn Menard
12-20-10 called Action Couriers for pick up - Received letter from consulting structural engineer approving all revisions. JCM
Routing - PLANNING12/20/2010 12/21/2010 PASS
DetailsJosh Wilson
Ok per CUP10-00055 and DRH10-00250
Routing - PLAN CHECK10/4/2010 12/20/2010  
DetailsJohn Menard
Plan resubmittals received  12/10/2010  
DetailsBarbara Stitt
Received a plan review response letter dated 12-9-10 from J Reese Leavitt, 3 copies of revised calculations, 5 copies of sheets 1, 2, 3, 4 and taken to John Menard
Routing - PUBLIC WORKS9/29/2010 10/4/2010 FAIL
DetailsBeverly Mountain
Routing PW Solid Waste8/2/2010 10/4/2010 PASS
DetailsPeter J. McCullough
Routing PW Drainage9/29/2010 10/1/2010 FAIL
DetailsBrian Murphy
NEEDS TO KEEP STROMWATER ONSITE AND O AND M
Routing - PLAN CHECK9/2/2010 9/29/2010  
DetailsJohn Menard
Route to Impact Fee Review9/1/20109/7/20109/2/2010 PASS
DetailsCindy M. Gould
Routing - FIRE9/1/20109/1/20109/2/2010 FAIL
DetailsScott Arellano
Faxed and emailed resubmittal items to architect.
1st review completed  9/2/2010 FAIL
Failed Public Works, Plumbing, Planning, Plan Check, Fire
Plan resubmittals requested  9/1/2010 DONE
DetailsJohn Menard
E-mailed the architect a copy of the plan review requesting revisions. JCM
Routing - PLAN CHECK8/10/2010 9/1/2010 FAIL
DetailsJohn Menard
Routing Off Site - STRUCTURAL7/28/2010 8/16/2010 FAIL
DetailsJohn Menard
Plan resubmittals requested  8/16/2010 DONE
DetailsJohn Menard
E-mailed the architect a copy of the structural review requesting revisions. JCM
Routing - PLANNING8/9/2010 8/10/2010 FAIL
DetailsJosh Wilson
Design Review DRH07-00575 and Height Exception CUP07-00042 have expired.
Routing - PLUMBING8/3/2010 8/9/2010 FAIL
DetailsBill VanDegrift
provide civil plan showing water line
Routing - Erosion and Sediment8/2/2010 8/3/2010 PASS
DetailsSteven Webb
ESC10-00577 plan waiver approved per the attached conditions.
Routing - PUBLIC WORKS7/29/2010 8/2/2010 FAIL
DetailsConnie Baumgartner
Routing PW Drainage7/30/2010 8/2/2010 FAIL
DetailsBrian Murphy
O AND M PLAN WHERE DOES SDRAINAGE GO IN UNIMPROVE GROUND AND NOT PAVING. BRIAN MURPHY ###-####
Routing - Addressing7/30/2010 7/30/2010 PASS
DetailsApril Wing
Routing - PLANNING Land Div7/28/2010 7/29/2010 PASS
DetailsTodd Tucker
Plans ACCEPTED BY PLAN TECH  7/28/2010 DONE
Pending Assignment by JCM7/28/2010 7/28/2010 BLDA
DetailsJohn Menard
7/28/2010 11:16:58 JCM - activity updated through activity BLDA166 from case BLD10-01738.
Application received 7/28/2010   
Routing PW Drainage3/29/2011   FAIL
DetailsBrian Murphy
NEED LARGE SHEETS