Permanent Occupancy | | | 8/11/2010 | | |
|
|
|
|
BLD-Final | 8/6/2010 | 8/9/2010 | 8/9/2010 | A | PASS |
Jim Sly
|
|
|
Karen Thomas Phone #: ###-#### OK for Perm Occ.
|
FIRE-Final Inspection | 8/6/2010 | 8/6/2010 | 8/6/2010 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Final | 8/4/2010 | 8/5/2010 | 8/5/2010 | P | NR |
Mike Jordan
|
|
|
karen Phone #: ###-#### - please call 1/2 hr prior . Life/safety failed.
|
FIRE-Final Inspection | 8/4/2010 | 8/5/2010 | 8/5/2010 | A | FAIL |
Troy Cobbley
|
|
|
Remove the hardware and closure on the secondary exit door since the hardware that is currently installed is not code compliant. The other main exit could be the one exit that is required.
|
Issue PAID IN FULL permit | | | 8/4/2010 | | DONE |
|
|
|
|
Plan assigned to (CDM) | 7/29/2010 | 7/29/2010 | 8/3/2010 | | DONE |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 7/29/2010 | | 8/3/2010 | | PASS |
Carl D Madsen
|
|
|
|
Case Summary (BLD) | | | 8/3/2010 | | DONE |
|
|
|
|
1st review completed | | | 8/3/2010 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/3/2010 | | |
|
|
|
|
Print Occupancy Form | | | 8/3/2010 | | |
|
|
|
|
Permit Ready to Issue | | | 8/3/2010 | | DONE |
|
|
|
|
Telephone call | | | 8/3/2010 | | DONE |
|
|
|
8-3-10 called Karen permit ready for pick up ///dld
|
Plans ACCEPTED BY PLAN TECH | | | 7/29/2010 | | DONE |
|
|
|
|
Application received | | 7/29/2010 | | | |
|
|
|
|