Permit Information
Permit NumberBLD10-01876
StatusFinaled
Name VAN AUKER CONSTRUCTION
Site Address 729 W DIAMOND ST
Project NameVAN AUKER BLDG
Customer Number 
ePlanReviewNo
Description
(BODIES IN MOTION - NORTH END OF BUILDING) (12-28-10 PLAN MODIFICATION TO INSTALL A STEEL FRAMEWORK TO SUPPORT A ROPES COURSE. THE FRAMEWORK WILL BE SUPPORTED BY THE BUILDING ROOF STRUCTURE. ALTERATIONS TO THE ROOF STRUCTURE INCLUDE 2 NEW CONCRETE FOOTING AND 2 NEW STEEL COLUMNS TO SHORTEN THE SPAN OF 2 EXISTING ROOF GIRDERS. BOLT HOLES WILL BE DRILLED IN THE WEBS OF THE EXISTING GIRDERS AND SADDLES TO SUPPORT THE ROPES COURSE STEEL FRAMEWORK WILL BE BOLTED TO THE SIDE OF THE GIRDER WEBS. THE WORK IS REQUIRED TO COMPLY WITH THE APPROVED STRUCTURAL DESIGN AND DETAILS. WELDING AND BOLTING ARE SUBJECT TO SPECIAL INSPECTION. THE STEEL FRAMEWORK AND ALL ELEMENTS ATTACHED TO THE FRAMEWORK ARE REQUIRED TO COMPLY WITH APPLICABLE STRUCTURAL ENGINEERING STANDARDS.) Planning approvals under CUP10-00018 and CZC10-00168. The fire sprinkler system is used for building area increase and for fire area. To remodel an former warehouse tenant space to include a new activity center for adults and children, a café, and a daycare for children. The daycare is limited to 30 children by the conditional use permit. The 1st story will have a floor area of about 11,820 square feet. The expanded unoccupied mezzanine will have a floor area of about 2,124 square feet. A children’s play structure will be installed. Work is to include two toilet/dressing rooms accessible to the disabled, expansion of the existing unoccupied mezzanine, an exterior ramp and stairway, a unisex restroom/shower room, millwork, and interior finishes. Because it will not have a compliant egress system, the existing mezzanine and the mezzanine expansion area is not approved for any occupancy, including storage. Mezzanine expansion work includes concrete footings, wood columns, wood bearing walls, gypsum shear walls, wood beams, wood joists, and wood sheathing. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 4/14/20114/5/2011 DONE
Third Notice 3/31/20113/31/2011 DONE
faxed
Third Notice 2/22/20113/17/2011 DONE
faxed
Second Notice 2/14/20112/17/2011 DONE
First Notice 1/24/20112/4/2011 DONE
BLD-Final1/14/20111/14/20111/14/2011APASS
DetailsJim Storey
Permanent Occupancy UNPAID FEE  1/14/2011 DONE
BLD-Final1/12/20111/13/20111/13/2011ANR
DetailsJim Storey
Jim Phone #: ###-#### pending mech
BLD-Final1/6/20111/6/20111/6/2011PPART
DetailsJim Storey
jim Phone #: ###-#### temp ok
FIRE-Final Inspection1/6/20111/7/20111/6/2011APASS
DetailsForrest France
Corrections completed. Fire life safety inspection passed. Note: inspection completed one day in advance of request date- occupancy card signed 1/6/11.
FIRE-Final Inspection1/3/20111/4/20111/5/2011ANR
DetailsForrest France
Final pending project related fire alarm and sprinkler permit work. Discussed door hardware, occupant load signs, knox box, security door, trade permits, FDC, trade permits, etc.
Zoning Approval12/29/201012/29/201012/29/2010 PASS
DetailsAndrea Tuning
CHANGE STATUS TO (ISS)  12/29/2010 DONE
DetailsTisha Gallop
picked up and paid for plan mod
Plan assigned to (CJW)12/6/201012/6/201012/28/2010 PASS
DetailsCarl Westfall
Routing - PLAN CHECK12/6/2010 12/28/2010 PASS
DetailsCarl Westfall
Plan modification approved. It took calls to the Architect's representative, the project Structural Engineer, and the tenant to get the information needed to approve the plan modification. Processing the plan modification took a long time because the needed information was slow in coming. The remaining needed information was received on Dec. 27, 2010.
PLANS/APPL TAKEN TO FRONT DESK  12/28/2010 DONE
Received Certificate of Value  12/28/2010 DONE
DetailsBarbara Stitt
New cert of value due to plan modification-additional value of $4,500//12-28-10
Print Occupancy Form  12/28/2010 DONE
DetailsBarbara Stitt
Telephone call  12/28/2010 DONE
DetailsChristina Prado
Damon called in to get fees. Advised on fee amount due, will be in to pick up soon
BLD-Framing/Rough-in12/22/201012/23/201012/23/2010PPASS
DetailsJim Storey
jim - ###-#### - ceiling grid ok pending ele aproval.
CHANGE STATUS TO (REV)  12/23/2010 DONE
I put this back to the review status. plan is in review for a plan modification that was submitted Dec 6th 2010 ///dld
Plan resubmittals received  12/23/2010 DONE
Received an E-mail with attached revised structural calculations.
Plan resubmittals received  12/13/2010  
DetailsBarbara Stitt
Received 1 cover transmittal, 1 copy of sheet 0 of 8, sheet 1 of 8, sheet 2 of 8, sheet 3 of 8, sheet 4 of 8, sheet 5 of 8, sheet 6 of 8, sheet 7 of 8, sheet 8 of 8, sheet F1 and F2, V1 & V2 and taken to Carl Westfall on 12-13-10 @ 2:15pm
Plan resubmittals received  12/10/2010 DONE
DetailsTisha Gallop
received one copy of 7pgs. section details on 8 1/2" x 11"; taken to Carl Westfall.
BLD-Framing/Rough-in12/9/201012/9/201012/9/2010PPASS
DetailsJim Storey
jim - ###-####
Override - Parcel Holds  12/9/2010  
BLD-Framing/Rough-in12/6/201012/7/201012/7/2010APASS
DetailsJim Storey
jim - ###-#### - ok per plan reviewer
BLD-Footing12/3/201012/6/201012/6/2010APASS
DetailsJim Storey
Footing rebar also around 11am try to be there then is possible-- Jim Phone #: ###-####
BLD-Framing/Rough-in12/3/201012/6/201012/6/2010APASS
DetailsJim Storey
Footing rebar also around 11am try to be there then is possible-- Jim Phone #: ###-####
Plan Modification Accepted  12/6/2010 DONE
DetailsTisha Gallop
Plan Modification accepted for Bld10-01876 (Bodies in Motion - North End of building) to install two steel columns under the existing structure that will extend from teh floor slab to the existing roof girders. These colums will serve as additional support for a proposed ropes course to be installed by the tenant; submitted on Structural Calcs and revised cert of value; routed to Carl Westfall.
Override - Parcel Holds  12/6/2010  
BLD-Foundation11/30/201011/30/201011/30/2010PPASS
DetailsMike Jordan
jim - pouring at 1:30 or 2 Phone #: ###-####. Stemwalls for new stairs and ramp.
BLD-Footing11/22/201011/22/201011/22/2010PPASS
DetailsJim Storey
jim - pouring at 1:00 Phone #: ###-####
BLD-Footing11/18/201011/18/201011/18/2010PPASS
DetailsJim Storey
jIM Phone #: ###-####
Print Occupancy Form  11/5/2010 DONE
DetailsTisha Gallop
Permit Ready to Issue  11/5/2010 DONE
DetailsTisha Gallop
Telephone call  11/5/2010 DONE
DetailsTisha Gallop
called and left voice messgae for Cornel Larson that permit is ready, fees and need ACHD
Issue PAID IN FULL permit  11/5/2010 DONE
DetailsBarbara Stitt
Routing - PLANNING11/1/2010 11/4/2010 PASS
DetailsSusan Riggs
Susan Riggs.
Routing - PLAN CHECK11/4/2010 11/4/2010 PASS
Completed the resubmittal review. Drawings approved.
PLANS/APPL TAKEN TO FRONT DESK  11/4/2010 DONE
Plan assigned to (CJW)8/10/2010 11/4/2010 PASS
DetailsCarl Westfall
1st review done
Plan resubmittals received  11/2/2010 DONE
DetailsBarbara Stitt
Received 1 cover transmittal, 2 copies of sheets A-0, A-0.1, A-1, A-2 and M-1 and taken to Carl Westfall on 11-2-10 @ 3:40pm
Routing - PLUMBING10/29/2010 11/1/2010 PASS
DetailsBill VanDegrift
indirectly waste the grease trap to a floor sink.
Routing - FIRE10/28/2010 10/29/2010 PASS
DetailsScott Arellano
Attached IFC comments to plans
Routing PW Sewer Rating10/28/2010 10/28/2010 PASS
DetailsConnie Baumgartner
resubmittals, fixture recalculation
Routing PW Environmental10/28/2010 10/28/2010 PASS
DetailsWalt Baumgartner
Reviewed plumbing resubmittal sheet. Plans note grease abatement but does not call out type spec'd. Phone conversation w/ owner's engineering agent indicates passive device to be installed. Facility subject to preteatment inspections to confirm operation and maintenance of grease abatement in accordance with established BMPs.
Routing - PLAN CHECK9/9/2010 10/28/2010 FAIL
DetailsCarl Westfall
Completed the resubmittal review. See the abbreviated plan review report.
Routing - PUBLIC WORKS10/28/2010 10/28/2010 PASS
Plan resubmittals received  10/18/2010  
received 1 letter of transmittal ,1 response, 3 calcs , and 2 copies of sheets A-0,A-0.1,SP-1,L-1A-1,A-2,A-3,A-4,A-5,A-6,A-7,A-8,A-9,S-1,S-2,S-3,MG-1,MG-2,MG-3,M-1,M-2,M-3,P-1,P-2,P-3,P-4,E-0,E-1,E-2,E-3,E-4,E-5,E-6,E-7,E-8 taken to Carl W for review
Routing - FIRE9/2/20109/2/20109/9/2010 FAIL
DetailsScott Arellano
Faxed and emailed resubmittal items to architect.
1st review completed  9/9/2010 FAIL
Failed Public Works, Plan Check, Fire
Route to Impact Fee Review9/2/20109/8/20109/3/2010 PASS
DetailsCindy M. Gould
tenant improvement no impact fees
Routing - PLAN CHECK8/18/2010 9/2/2010 FAIL
DetailsCarl Westfall
The IBC plan review was started on August 24, 2010 and finished on September 2, 2010. Revised drawings were required. See the plan review report.
Routing - Design Review  8/18/2010 PASS
DetailsAndrea Tuning
Andrea Tuning - CZC10-00168
Routing - PLANNING8/17/2010 8/18/2010 PASS
DetailsSusan Riggs
Susan Riggs - CUP10-00018
Routing - PLUMBING8/13/2010 8/17/2010 PASS
DetailsBill VanDegrift
indiretly waste grease trap to a floor sink.
Routing - PUBLIC WORKS8/17/2010 8/17/2010 PASS
DetailsBeverly Mountain
Routing PW Environmental8/12/2010 8/13/2010 PASS
DetailsWalt Baumgartner
35gpm Big Dipper noted on equipment list. Skullery and 3 comp sink routed to it. OK. Food service BMPs require unit be properly operated and maintaind at all times. Facility subject to pretreatment inspection for compliance with BMPs.
Routing PW Sewer Rating8/12/2010 8/13/2010 PASS
DetailsConnie Baumgartner
Routing - Erosion and Sediment8/13/2010 8/13/2010 PASS
DetailsClint A Smith
ESC10-00608 plan waiver approved per the attached conditions.
Routing - PUBLIC WORKS8/10/2010 8/13/2010 FAIL
DetailsConnie Baumgartner
Suitable and adequate grease abatement required for kitchen. Contact ###-#### for pretreatment requirements and info on required food service BMPs

Failed by Walter Baumgartner ###-####
Routing - Addressing8/12/2010 8/12/2010 PASS
DetailsApril Wing
Plan Reviewer's activity  8/10/2010 DONE
DetailsJason Blais
Emailed architect letting him know to contact ACHD and submit any needed documentation to evaluate if additional impact fees are required. Written verification will need to be provided to our permit counter prior to building permit issuance.
Pending Assignment by JCB8/9/2010 8/10/2010 DONE
DetailsJason Blais
Recd Pcfee & Taken To Pln CK  8/9/2010  
Intake Approval  8/6/2010 PASS
OK to submit for permit. Drawings signed by CDHD are for reference only. Changes required by CDHD were made on the other sets.
Application received 8/6/2010