Third Notice | | 1/8/2013 | 1/28/2013 | | DONE |
|
|
|
|
FIRE-Final Inspection | 1/22/2013 | 1/23/2013 | 1/23/2013 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Final | 1/22/2013 | 1/23/2013 | 1/23/2013 | A | PASS |
Tom Arcoraci
|
|
|
mike Phone #: ###-####
|
DOC - Permit Finaled | 1/23/2013 | 1/23/2013 | 1/23/2013 | P | PASS |
Tom Arcoraci
|
|
|
|
FIRE-Conference | 1/17/2013 | 1/18/2013 | 1/18/2013 | A | DONE |
Forrest France
|
|
|
Regarding exceptions allowed per NFPA 13 for non-sprinklered concealed spaces.
|
BLD-Framing/Rough-in | 1/17/2013 | 1/17/2013 | 1/17/2013 | P | PASS |
Tom Arcoraci
|
|
|
\
|
CHANGE STATUS TO (ISS) | | | 1/11/2013 | | DONE |
Tisha Gallop
|
|
|
picked up and paid for plan mod
|
Telephone call | | | 1/10/2013 | | DONE |
Tisha Gallop
|
|
|
called Matt Rhees and left vm plan mod is ready, hourly fees due, need new Cert of Value and depending on what value is turned in additional fees may apply.
|
Plan assigned to (CJW) | 1/7/2013 | 1/7/2013 | 1/9/2013 | | PASS |
Carl Westfall
|
|
|
After State inspection they noted some things needed to be changed therefor resulting in a plan mod after final inspection.
|
Routing - PLAN CHECK | 12/17/2012 | | 1/9/2013 | | PASS |
Carl Westfall
|
|
|
Plan mod approved.
|
Inspection Record Card- Bld | | | 1/9/2013 | | DONE |
|
|
|
|
Second Notice | | 12/13/2012 | 1/3/2013 | | DONE |
|
|
|
|
Plan resubmittals received | | | 12/17/2012 | | DONE |
|
|
|
12-17-12 received 1 project letter, and 1 copy of sheets A0.0,A1.0,A2.0,A3.0,A4.0 sent to Carl W.
After State inspection they noted some things needed to be changed therefor resulting in a plan mod after final inspection.
|
First Notice | 11/26/2012 | 11/26/2012 | 12/3/2012 | | DONE |
Tom Arcoraci
|
|
|
|
BLD-Final | 11/21/2012 | 11/26/2012 | 11/26/2012 | P | PASS |
Tom Arcoraci
|
|
|
mike Phone #: ###-####
|
DOC - Permit Finaled | 11/26/2012 | 11/26/2012 | 11/26/2012 | P | PASS |
Tom Arcoraci
|
|
|
|
FIRE-Final Inspection | 11/21/2012 | 11/26/2012 | 11/26/2012 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Contractor is going to adjust the drop rate of the fire door and provide verification
|
CHANGE STATUS TO (ISS) | | | 11/15/2012 | | |
|
|
|
|
(F) Reprint permit | | | 11/15/2012 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 10/24/2012 | 10/24/2012 | 11/13/2012 | | PASS |
Carl Westfall
|
|
|
Plan mod. (10-24-12)
|
Routing - FIRE | 11/7/2012 | | 11/13/2012 | | PASS |
Scott Arellano
|
|
|
Attached comments to plans.
|
Routing - PLAN CHECK | 11/13/2012 | | 11/13/2012 | | DONE |
Carl Westfall
|
|
|
Routing completed
|
Inspection Record Card- Bld | | | 11/13/2012 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 11/13/2012 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 11/13/2012 | | DONE |
Barbara Stitt
|
|
|
Called Matt Rhees and told him that permit is ready and fees due on 11-13-12 @ 3:00pm//BAS
|
Routing - PLAN CHECK | 11/6/2012 | | 11/7/2012 | | DONE |
Carl Westfall
|
|
|
Routed to Fire
|
Routing PW Sewer Rating | 11/5/2012 | | 11/6/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 11/6/2012 | | 11/6/2012 | | PASS |
April Wing
|
|
|
|
Routing - PLAN CHECK | 10/24/2012 | | 11/5/2012 | | PASS |
Carl Westfall
|
|
|
Completed and approved the plan mod review. Routed to PW.
|
Plan Modification Accepted | | | 10/24/2012 | | DONE |
|
|
|
Plan mod rec'd to remove southeast nurse workstationl remodel existing "MEDS" and "NUTRITION" rooms with new cabinets, modify existing "LAUNDRY" room to be a new "CONSULTATION" roon. Modify existing "BREAK/STORAGE" room to be a new "SECLUSION, SECLUSION RR, CONSULTATION & ANTEROOM" . Modify existing "OFFICE" to be a new "LAUNDRY room. Rec'd two copies of sheets A0.0; A1.0; A2.0; A3.0; A4.0; ID1.0 - taken to Carl W.
|
BLD-Framing/Rough-in | 9/19/2012 | 9/20/2012 | 9/20/2012 | P | PASS |
Tom Arcoraci
|
|
|
mike Phone #: ###-####
|
Inspection Record Card- Bld | | | 9/18/2012 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 9/12/2012 | 9/13/2012 | 9/13/2012 | A | NR |
Mike Jordan
|
|
|
mike Phone #: ###-####
|
BLD-Framing/Rough-in | 8/22/2012 | 8/23/2012 | 8/23/2012 | A | PASS |
Tom Arcoraci
|
|
|
Mike Phone #: ###-#### wip ok
|
BLD-Framing/Rough-in | 7/23/2012 | 7/24/2012 | 7/24/2012 | A | PART |
Tom Arcoraci
|
|
|
mike Phone #: ###-#### work in progress
|
BLD-Aging Inspection | 6/13/2012 | 6/13/2012 | 6/13/2012 | | PART |
Tom Arcoraci
|
|
|
|
Issue PAID IN FULL permit | | | 1/26/2012 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 1/18/2012 | | DONE |
|
|
|
t/c w matt - reminded him that this permit will expire on the 28th of this month - there has been 2 extensions
|
Telephone call | | | 8/4/2011 | | DONE |
|
|
|
t/c w matt - asked if he was going to apply for the extension, otherwise I would have to void the permit since it expired on the 1st - he said he would send Jason a request today
|
Extend Review Timeline | | | 8/4/2011 | | DONE |
|
|
|
|
Telephone call | | | 8/3/2011 | | DONE |
|
|
|
t/c w matt - told him that this permit has expired, I was getting ready to void it and did he want the plans back, if not, I would discard them - he asked if he could apply for an extension, I referred him to jason
|
Telephone call | | | 7/22/2011 | | DONE |
|
|
|
left vm for matt - reminded him that this permit will expire on 8-1-11 unless he applies for an extension or picks up the permit prior to that date
|
Extend Review Timeline | | | 1/26/2011 | | DONE |
|
|
|
extended 180 days per Jason Blais
|
Telephone call | | | 1/24/2011 | | DONE |
|
|
|
left vm for matt - reminder that permit will expire soon
|
Expiration Notice | 1/14/2011 | 2/7/2011 | 1/14/2011 | | DONE |
Patricia Smith
|
|
|
|
Route to Impact Fee Review | 9/16/2010 | 9/21/2010 | 9/22/2010 | | PASS |
Cindy M. Gould
|
|
|
Remodel of existing building, no impact fees
|
Routing - PLAN CHECK | 9/21/2010 | | 9/22/2010 | | PASS |
Carl Westfall
|
|
|
Drawings approved after resubmttal review.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/22/2010 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/22/2010 | | DONE |
|
|
|
|
Telephone call | | | 9/22/2010 | | DONE |
|
|
|
t/c w matt at ###-#### - permit ready and fees given - also need gc name and rce#
|
Permit Ready to Issue | | | 9/22/2010 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 8/10/2010 | | 9/22/2010 | | PASS |
Carl Westfall
|
|
|
9/22/2010 09:29:42 CJW - activity updated through activity BLDA022 from case BLD10-01877.
|
Routing - FIRE | 9/16/2010 | 9/16/2010 | 9/21/2010 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 9/21/2010 | | FAIL |
|
|
|
Failed Plan Check
|
Plan resubmittals received | | | 9/20/2010 | | |
|
|
|
received 1 transmittal and 2 copies of sheet A2.0 taken to Carl W.
|
Routing - PLAN CHECK | 8/12/2010 | | 9/16/2010 | | FAIL |
Carl Westfall
|
|
|
The IBC plan review was started on September 3, 2010 and was finished on September 16, 2010. Starting the plan review was delayed because of the increased work load caused by another Plans Examiner being on extended sick leave. After the plan review was started, the plan review was delayed because the assigned Plans Examiner got sick for a week. Revised drawings were required. See the plan review report. CJW
|
Routing - PUBLIC WORKS | 8/10/2010 | | 8/12/2010 | | PASS |
Beverly Mountain
|
|
|
|
Routing PW Sewer Rating | 8/12/2010 | | 8/12/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 8/11/2010 | | 8/11/2010 | | PASS |
April Wing
|
|
|
|
Pending Assignment by JCB | 8/9/2010 | | 8/10/2010 | | DONE |
Jason Blais
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/9/2010 | | DONE |
|
|
|
|
Intake Approval | | | 8/6/2010 | | PASS |
Carl Westfall
|
|
|
OK to submit for permit.
|
Application received | | 8/6/2010 | | | |
|
|
|
|