Permit Information
Permit NumberBLD10-01877
StatusFinaled
Name VISTA CONSTRUCTION INC
Site Address 303 N ALLUMBAUGH ST
Project NameINTERMOUNTAIN HOSPITAL
Customer Number 
ePlanReviewNo
Description
(INTERMOUNTAIN HOSPITAL - MAIN BUILDING - BUILDING #1 - SOUTHWEST NURSE STATION REMODEL) (1-9-13 PLAN MODIFICATION TO RELOCATE THE SECLUSION RESTROOM DOOR, TO INSTALL A WIDER DOOR IN A 1-HR CORRIDOR WALL, AND TO UPGRADE SOME WALLS AND CEILINGS TO 1-HR FIRE-RESISTANCE-RATED CONSTRUCTION.) (11-5-12 PLAN MODIFICATION TO REMOVE THE SOUTHEAST NURSE’S STATION FROM THE SCOPE OF WORK, CONSTRUCT A NEW SECLUSION ROOM WITH AN ADJACENT TOILET ROOM ACCESSIBLE TO THE DISABLED, MOVE A LAUNDRY ROOM TO A NEW LOCATION, AND TO DELETE A BREAK ROOM.) This building is fire sprinklered for building area increase and for the I Occupancy. To remodel a nurse’s station and the adjacent 1-hr corridor within an existing I-3 mental hospital (maintaining UBC occupancy classification). This nurse station is located in the Soutwest corner of Building 1 (main care unit building). The nurse’s station will be separated from the adjacent 1-hr corridor enclosure. Work is to include relocating an existing overhead coiling 1-hr corridor fire door, installing windows having a 45 minute fire-protection-rating, and constructing 1-hr corridor walls and tunneled ceilings. Work also includes interior nonbearing walls, new interior doors, a new seclusion room, an adjacent seclusion restroom accessible to the disabled, a laundry room, millwork, and service windows with safety glazing having transaction slots. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. The fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 1/8/20131/28/2013 DONE
FIRE-Final Inspection1/22/20131/23/20131/23/2013APASS
DetailsTroy Cobbley
Life safety passed
BLD-Final1/22/20131/23/20131/23/2013APASS
DetailsTom Arcoraci
mike Phone #: ###-####
DOC - Permit Finaled1/23/20131/23/20131/23/2013PPASS
DetailsTom Arcoraci
FIRE-Conference1/17/20131/18/20131/18/2013ADONE
DetailsForrest France
Regarding exceptions allowed per NFPA 13 for non-sprinklered concealed spaces.
BLD-Framing/Rough-in1/17/20131/17/20131/17/2013PPASS
DetailsTom Arcoraci
\
CHANGE STATUS TO (ISS)  1/11/2013 DONE
DetailsTisha Gallop
picked up and paid for plan mod
Telephone call  1/10/2013 DONE
DetailsTisha Gallop
called Matt Rhees and left vm plan mod is ready, hourly fees due, need new Cert of Value and depending on what value is turned in additional fees may apply.
Plan assigned to (CJW)1/7/20131/7/20131/9/2013 PASS
DetailsCarl Westfall
After State inspection they noted some things needed to be changed therefor resulting in a plan mod after final inspection.
Routing - PLAN CHECK12/17/2012 1/9/2013 PASS
DetailsCarl Westfall
Plan mod approved.
Inspection Record Card- Bld  1/9/2013 DONE
Second Notice 12/13/20121/3/2013 DONE
Plan resubmittals received  12/17/2012 DONE
12-17-12 received 1 project letter, and 1 copy of sheets A0.0,A1.0,A2.0,A3.0,A4.0 sent to Carl W.

After State inspection they noted some things needed to be changed therefor resulting in a plan mod after final inspection.
First Notice11/26/201211/26/201212/3/2012 DONE
DetailsTom Arcoraci
BLD-Final11/21/201211/26/201211/26/2012PPASS
DetailsTom Arcoraci
mike Phone #: ###-####
DOC - Permit Finaled11/26/201211/26/201211/26/2012PPASS
DetailsTom Arcoraci
FIRE-Final Inspection11/21/201211/26/201211/26/2012APASS
DetailsTroy Cobbley
Life safety passed. Contractor is going to adjust the drop rate of the fire door and provide verification
CHANGE STATUS TO (ISS)  11/15/2012  
(F) Reprint permit  11/15/2012 DONE
Plan assigned to (CJW)10/24/201210/24/201211/13/2012 PASS
DetailsCarl Westfall
Plan mod. (10-24-12)
Routing - FIRE11/7/2012 11/13/2012 PASS
DetailsScott Arellano
Attached comments to plans.
Routing - PLAN CHECK11/13/2012 11/13/2012 DONE
DetailsCarl Westfall
Routing completed
Inspection Record Card- Bld  11/13/2012 DONE
DetailsTisha Gallop
Permit Ready to Issue  11/13/2012 DONE
DetailsBarbara Stitt
Telephone call  11/13/2012 DONE
DetailsBarbara Stitt
Called Matt Rhees and told him that permit is ready and fees due on 11-13-12 @ 3:00pm//BAS
Routing - PLAN CHECK11/6/2012 11/7/2012 DONE
DetailsCarl Westfall
Routed to Fire
Routing PW Sewer Rating11/5/2012 11/6/2012 PASS
DetailsConnie Baumgartner
Routing - Addressing11/6/2012 11/6/2012 PASS
DetailsApril Wing
Routing - PLAN CHECK10/24/2012 11/5/2012 PASS
DetailsCarl Westfall
Completed and approved the plan mod review. Routed to PW.
Plan Modification Accepted  10/24/2012 DONE
Plan mod rec'd to remove southeast nurse workstationl remodel existing "MEDS" and "NUTRITION" rooms with new cabinets, modify existing "LAUNDRY" room to be a new "CONSULTATION" roon. Modify existing "BREAK/STORAGE" room to be a new "SECLUSION, SECLUSION RR, CONSULTATION & ANTEROOM" . Modify existing "OFFICE" to be a new "LAUNDRY room. Rec'd two copies of sheets A0.0; A1.0; A2.0; A3.0; A4.0; ID1.0 - taken to Carl W.
BLD-Framing/Rough-in9/19/20129/20/20129/20/2012PPASS
DetailsTom Arcoraci
mike Phone #: ###-####
Inspection Record Card- Bld  9/18/2012 DONE
DetailsTisha Gallop
BLD-Final9/12/20129/13/20129/13/2012ANR
DetailsMike Jordan
mike Phone #: ###-####
BLD-Framing/Rough-in8/22/20128/23/20128/23/2012APASS
DetailsTom Arcoraci
Mike Phone #: ###-#### wip ok
BLD-Framing/Rough-in7/23/20127/24/20127/24/2012APART
DetailsTom Arcoraci
mike Phone #: ###-#### work in progress
BLD-Aging Inspection6/13/20126/13/20126/13/2012 PART
DetailsTom Arcoraci
Issue PAID IN FULL permit  1/26/2012 DONE
DetailsBarbara Stitt
Telephone call  1/18/2012 DONE
t/c w matt - reminded him that this permit will expire on the 28th of this month - there has been 2 extensions
Telephone call  8/4/2011 DONE
t/c w matt - asked if he was going to apply for the extension, otherwise I would have to void the permit since it expired on the 1st - he said he would send Jason a request today
Extend Review Timeline  8/4/2011 DONE
Telephone call  8/3/2011 DONE
t/c w matt - told him that this permit has expired, I was getting ready to void it and did he want the plans back, if not, I would discard them - he asked if he could apply for an extension, I referred him to jason
Telephone call  7/22/2011 DONE
left vm for matt - reminded him that this permit will expire on 8-1-11 unless he applies for an extension or picks up the permit prior to that date
Extend Review Timeline  1/26/2011 DONE
extended 180 days per Jason Blais
Telephone call  1/24/2011 DONE
left vm for matt - reminder that permit will expire soon
Expiration Notice1/14/20112/7/20111/14/2011 DONE
DetailsPatricia Smith
Route to Impact Fee Review9/16/20109/21/20109/22/2010 PASS
DetailsCindy M. Gould
Remodel of existing building, no impact fees
Routing - PLAN CHECK9/21/2010 9/22/2010 PASS
DetailsCarl Westfall
Drawings approved after resubmttal review.
PLANS/APPL TAKEN TO FRONT DESK  9/22/2010 DONE
Inspection Record Card- Bld  9/22/2010 DONE
Telephone call  9/22/2010 DONE
t/c w matt at ###-#### - permit ready and fees given - also need gc name and rce#
Permit Ready to Issue  9/22/2010 DONE
Details
Plan assigned to (CJW)8/10/2010 9/22/2010 PASS
DetailsCarl Westfall
9/22/2010 09:29:42 CJW - activity updated through activity BLDA022 from case BLD10-01877.
Routing - FIRE9/16/20109/16/20109/21/2010 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  9/21/2010 FAIL
Failed Plan Check
Plan resubmittals received  9/20/2010  
received 1 transmittal and 2 copies of sheet A2.0 taken to Carl W.
Routing - PLAN CHECK8/12/2010 9/16/2010 FAIL
DetailsCarl Westfall
The IBC plan review was started on September 3, 2010 and was finished on September 16, 2010. Starting the plan review was delayed because of the increased work load caused by another Plans Examiner being on extended sick leave. After the plan review was started, the plan review was delayed because the assigned Plans Examiner got sick for a week. Revised drawings were required. See the plan review report. CJW
Routing - PUBLIC WORKS8/10/2010 8/12/2010 PASS
DetailsBeverly Mountain
Routing PW Sewer Rating8/12/2010 8/12/2010 PASS
DetailsConnie Baumgartner
Routing - Addressing8/11/2010 8/11/2010 PASS
DetailsApril Wing
Pending Assignment by JCB8/9/2010 8/10/2010 DONE
DetailsJason Blais
Plans ACCEPTED BY PLAN TECH  8/9/2010 DONE
Intake Approval  8/6/2010 PASS
DetailsCarl Westfall
OK to submit for permit.
Application received 8/6/2010