Second Notice | | 8/6/2012 | 8/24/2012 | | DONE |
|
|
|
|
First Notice | 7/20/2012 | 7/20/2012 | 7/27/2012 | | DONE |
Jim Sly
|
|
|
|
BLD-Final | 7/19/2012 | 7/20/2012 | 7/20/2012 | A | PASS |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 7/20/2012 | 7/20/2012 | 7/20/2012 | P | PASS |
Jim Sly
|
|
|
|
PubWorks Occupancy Approval | 11/18/2010 | 11/18/2010 | 11/18/2010 | | DONE |
Tiffany Lowery
|
|
|
|
Issue PAID IN FULL permit | | | 9/27/2010 | | |
|
|
|
|
Plan assigned to (LEG) Tisha | 8/10/2010 | | 9/14/2010 | | DONE |
Tisha Gallop
|
|
|
|
Routing - Erosion and Sediment | 9/7/2010 | | 9/14/2010 | | PASS |
Steven Webb
|
|
|
ESC plan is approved according to the ESC plan and ESC permit conditions. ESC10-00611
|
Routing - PLAN CHECK | 9/14/2010 | | 9/14/2010 | | PASS |
Tisha Gallop
|
|
|
Tisha//Office copy taken to records
|
Inspection Record Card- Bld | | | 9/14/2010 | | DONE |
Tisha Gallop
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/14/2010 | | DONE |
Tisha Gallop
|
|
|
|
Case Summary (BLD) | | | 9/14/2010 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 9/14/2010 | | DONE |
Tisha Gallop
|
|
|
e-mailed David Hatch permit is ready, need GC, RCE, RP.
|
Permit Ready to Issue | | | 9/14/2010 | | DONE |
Tisha Gallop
|
|
|
|
Routing - PLAN CHECK | 9/3/2010 | | 9/7/2010 | | PEND |
Tisha Gallop
|
|
|
routed to ESC
|
Plan resubmittals received | | | 9/3/2010 | | DONE |
Tisha Gallop
|
|
|
received two copies of ESC narrative and plan sheets ESC1, ESC2; inserted by LEG and routed to ESC
|
Routing - Erosion and Sediment | 9/3/2010 | | 9/3/2010 | | FAIL |
Steven Webb
|
|
|
Failed due to the area of the waste fill location is not indicated within the narrative and the plan map. The waste fill area is where they will utilize for the stockpile and spoils. Informed Bill Johnson of the failures. Must resubmit the application with a revised area of disturbance including the waste fill area. Must submit a revised narrative and plan map to include the waste fill area.
|
Routing - PLAN CHECK | 8/17/2010 | | 9/3/2010 | | PEND |
Tisha Gallop
|
|
|
failed ESC//routed to ESC 9/3/10
|
Routing - PLANNING | 8/16/2010 | | 8/17/2010 | | PASS |
Cody Riddle
|
|
|
Paving of existing gravel parking/storage area. No new buildings proposed.
|
1st review completed | | | 8/17/2010 | | DONE |
Tisha Gallop
|
|
|
failed ESC
|
Routing - Erosion and Sediment | 8/16/2010 | | 8/16/2010 | | FAIL |
Steven Webb
|
|
|
ESC submittal did not include an ESC plan as required by BCC 8-17. As well, signature of the Plan Designer was not included on the narrative. Informed applicant, B. Johnson. ESC10-00611.
|
Routing - PUBLIC WORKS | 8/13/2010 | | 8/16/2010 | | PASS |
Beverly Mountain
|
|
|
|
Routing PW Drainage | 8/16/2010 | | 8/16/2010 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Sewer Rating | 8/16/2010 | | 8/16/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 8/13/2010 | | 8/13/2010 | | PASS |
April Wing
|
|
|
|
Routing - PLANNING Land Div | 8/11/2010 | | 8/12/2010 | | PASS |
Dave Abo
|
|
|
Parcel over 5 acres in size.
|
Application received | | 8/10/2010 | 8/11/2010 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/10/2010 | | DONE |
Tisha Gallop
|
|
|
|
Intake Approval | | | 8/10/2010 | | PASS |
Tisha Gallop
|
|
|
Per Scott Arellano, Fire Review not required for this project.
|