Third Notice | | 9/13/2011 | 9/14/2011 | | DONE |
|
|
|
|
Second Notice | | 9/4/2011 | 9/8/2011 | | DONE |
|
|
|
|
First Notice | | 8/21/2011 | 8/25/2011 | | DONE |
|
|
|
|
BLD-Final | 8/10/2011 | 8/10/2011 | 8/11/2011 | P | PASS |
Jim Sly
|
|
|
Dave phone ###-#### OK for Perm Occ.
|
Permanent Occupancy | | | 8/11/2011 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Final | 8/9/2011 | 8/10/2011 | 8/10/2011 | A | CANC |
Jim Sly
|
|
|
dave Phone #: ###-#### Re-sched for PM.
|
Temporary Occupancy | 6/21/2011 | 9/19/2011 | 6/21/2011 | | DONE |
Darla L Downs
|
|
|
|
BLD-Final | 6/15/2011 | 6/16/2011 | 6/16/2011 | A | PART |
Jim Sly
|
|
|
Dave Phone #: ###-#### OK for Temp Occ. OK for Perm Occ. when Plumbing Perms.
|
BLD-Conference | 6/9/2011 | 6/10/2011 | 6/10/2011 | A | PASS |
Jim Sly
|
|
|
Please call 30min prior--Dave Phone #: ###-####
|
FIRE-Final Inspection | 6/6/2011 | 6/7/2011 | 6/7/2011 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 6/3/2011 | 6/6/2011 | 6/6/2011 | P | FAIL |
Troy Cobbley
|
|
|
Provide emergency lighting in the stair way and provide non-locking hardware on inner exit door as discussed.
|
Zoning Approval | 5/6/2011 | 5/6/2011 | 5/6/2011 | | PASS |
Andrea Tuning
|
|
|
|
BLD-Other | 4/1/2011 | 4/4/2011 | 4/4/2011 | A | PASS |
Jim Sly
|
|
|
Dave Phone #: ###-#### Grid OK
|
BLD-Framing/Rough-in | 2/2/2011 | 2/3/2011 | 2/3/2011 | A | PASS |
Jim Sly
|
|
|
DAve Phone #: ###-#### Grid OK
|
BLD-Framing/Rough-in | 2/1/2011 | 2/1/2011 | 2/1/2011 | A | PASS |
Jim Sly
|
|
|
Dave phone #: ###-####
|
BLD-Framing/Rough-in | 1/28/2011 | 1/31/2011 | 2/1/2011 | A | DEFR |
Jim Storey
|
|
|
Dave-please talk to Mike Jordan prior to inspection Phone #: ###-####
|
BLD-Energy code compliance | 1/28/2011 | 1/28/2011 | 1/28/2011 | P | PASS |
Mike Jordan
|
|
|
Dave Phone #: ###-####
|
BLD-Other | 12/21/2010 | 12/22/2010 | 12/23/2010 | P | PASS |
Jim Sly
|
|
|
dave - roof shear nail and wall shear nail Phone #: ###-####
|
BLD-Foundation | 11/12/2010 | 11/15/2010 | 11/15/2010 | A | PASS |
Jim Sly
|
|
|
Bill phone
|
BLD-Foundation | 11/10/2010 | 11/12/2010 | 11/12/2010 | P | CANC |
Jim Sly
|
|
|
bill Phone #: ###-#### Re-sched.......
|
BLD-Footing | 11/10/2010 | 11/12/2010 | 11/12/2010 | A | PASS |
Jim Sly
|
|
|
bill Phone #: ###-####
|
Issue PAID IN FULL permit | | | 11/2/2010 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (JCM) | 8/11/2010 | | 10/29/2010 | | PASS |
John Menard
|
|
|
|
Routing - Addressing | 10/28/2010 | | 10/29/2010 | | PASS |
Trudy Rowland
|
|
|
|
Routing - PUBLIC WORKS | 10/28/2010 | | 10/29/2010 | | PASS |
Beverly Mountain
|
|
|
|
Routing - PLAN CHECK | 10/29/2010 | | 10/29/2010 | | PASS |
John Menard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/29/2010 | | DONE |
John Menard
|
|
|
|
Print Occupancy Form | | | 10/29/2010 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 10/29/2010 | | DONE |
Tisha Gallop
|
|
|
called Robert Powell and told him permit is ready, fees, and need ACHD
|
Permit Ready to Issue | | | 10/29/2010 | | DONE |
Tisha Gallop
|
|
|
|
Routing - PLAN CHECK | 9/22/2010 | | 10/28/2010 | | |
John Menard
|
|
|
John M.
|
Routing - PLANNING Land Div | 10/28/2010 | | 10/28/2010 | | PASS |
Todd Tucker
|
|
|
Grace Subdivision has been recorded.
|
Plan Reviewer's activity | | | 10/8/2010 | | PASS |
John Menard
|
|
|
Reviewed and approved final requested revisions. JCM
|
Plan resubmittals received | | | 10/6/2010 | | DONE |
|
|
|
received 3 copies of sheets A2.1, A2.2 inserted by Scott Grady taken to John M
|
Plan resubmittals requested | | | 9/24/2010 | | DONE |
John Menard
|
|
|
E-mailed the architect a request to revise stair and handrail details. JCM
|
Plan resubmittals received | | | 9/23/2010 | | |
John Menard
|
|
|
rec'd response letter and 3 copies of sheets A2.1; A2.2; A6.0; 7; inserted by rep and taken back to John M
|
Route to Impact Fee Review | 9/15/2010 | 9/20/2010 | 9/22/2010 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - Erosion and Sediment | | | 9/22/2010 | | PASS |
Steven Webb
|
|
|
ESC plan under masterplan ESC09-00605 is approved according to the ESC permit conditions. ESC10-00612
|
Routing - PLUMBING | 9/21/2010 | | 9/21/2010 | | PASS |
Bill VanDegrift
|
|
|
per plans and 2003 upc
|
Routing - PLUMBING | 9/21/2010 | | 9/21/2010 | | PASS |
Bill VanDegrift
|
|
|
per plans and 2003 upc
|
Routing - FIRE | 9/15/2010 | 9/15/2010 | 9/20/2010 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 9/20/2010 | | FAIL |
|
|
|
Failed Plan Check
|
Routing - PLANNING | 9/20/2010 | | 9/20/2010 | | PASS |
Andrea Tuning
|
|
|
|
Plan Reviewer's activity | | | 9/16/2010 | | PASS |
John Menard
|
|
|
Reviewed and approved structural revisions. JCM
|
Plan resubmittals requested | | | 9/16/2010 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the plan review requesting revisions. JCM
|
Routing - PLAN CHECK | 8/24/2010 | | 9/15/2010 | | FAIL |
John Menard
|
|
|
|
Plan resubmittals received | | | 8/27/2010 | | DONE |
Tisha Gallop
|
|
|
received three copies of resoponse to comments, structural calcs, and plan sheet A0.0; inserted by LEG and taken back to John Menard
|
Plan resubmittals requested | | | 8/25/2010 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the structural review requesting revisions. JCM
|
Routing Off Site - STRUCTURAL | 8/11/2010 | | 8/25/2010 | | FAIL |
John Menard
|
|
|
called Action Couriers for pick up - Received comment list from the consulting structural engineer requesting revisions. JCM
|
Routing - PUBLIC WORKS | 8/17/2010 | | 8/24/2010 | | FAIL |
Connie Baumgartner
|
|
|
Addressing needs subdivision plat to finalize address. April Wing ###-####
|
Routing PW Environmental | 8/24/2010 | | 8/24/2010 | | PASS |
Walt Baumgartner
|
|
|
Amalgam seperator not shown. Installation recommended. Terry Alber ###-####
|
Routing PW Solid Waste | 8/24/2010 | | 8/24/2010 | | PASS |
Peter J. McCullough
|
|
|
|
Routing PW Drainage | 8/20/2010 | | 8/23/2010 | | PASS |
Brian Murphy
|
|
|
see odi2923
|
Routing PW Sewer Rating | 8/20/2010 | | 8/20/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Sewer Design | 8/20/2010 | | 8/20/2010 | | PASS |
Jon R. Gunnerson
|
|
|
Connnect onto sanitary sewer service line provided under DRI-1489; Grace Commercial Subdivision
|
Routing - PLANNING Land Div | 8/11/2010 | | 8/17/2010 | | FAIL |
Todd Tucker
|
|
|
The subdivision plat has not been recorded yet. As such, the Building Permit can not be issued.
|
Pending Assignment by JCM | 8/11/2010 | | 8/11/2010 | | BLDA |
John Menard
|
|
|
8/11/2010 11:49:49 JCM - activity updated through activity BLDA166 from case BLD10-01897.
|
Recd Pcfee & Taken To Pln CK | | | 8/11/2010 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 8/11/2010 | | DONE |
|
|
|
|
Application received | | 8/11/2010 | | | |
|
|
|
|
Routing - Addressing | 8/19/2010 | | | | FAIL |
|
|
|
Can not validate the correct address until subdivision is completed.
|