Permit Information
Permit NumberBLD10-01899
StatusFinaled
Name VERTICAL CORP
Site Address 130 N 8TH ST
Project NameCapitol Terrace 1st floor
Customer Number 
ePlanReviewNo
Description
(CARUSO'S DELI & SANDWICH SHOP) Remodel for a new 1,846 sq. ft. sandwich restaurant tenant in an existing building per the approved plans. Vanilla Finish permit was completed under permit BLD10-01004. Work to include: construct new interior non-combustible walls to create a new seating area, kitchen area, backbar area, and office; new doors and associated hardware; install a service sink; installation of a suspended ceiling system; related interior finishes in compliance with chapter 8 of the 2006 IBC; new mechanical, new plumbing, and new electrical work; and all other work per the approved plans, attached plan review report, and all other reviewing agencies approvals. This building is fire sprinklered for high-rise. Any alterations or modifications to the sprinkler system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA #13 as regulated by the fire department. 3-8-11 FINAL CERT OF VALUE PER GC $ 79,000.00 ///DLD
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 3/31/20113/31/2011 DONE
faxed & called
Third Notice 3/17/20113/17/2011 DONE
faxed
Third Notice 2/9/20113/3/2011 DONE
faxed
Second Notice 1/30/20112/4/2011 DONE
First Notice 1/14/20111/20/2011 DONE
BLD-Final1/3/20111/4/20111/4/2011APASS
DetailsDave Hannah
To complete C of O--no need to go out to site
Permanent Occupancy  1/4/2011 DONE
DetailsChristina Prado
BLD-Aging Inspection12/30/201012/30/20101/3/2011 PASS
DetailsDave Hannah
Temporary Occupancy UNPAID FEE  10/29/2010 DONE
DetailsTisha Gallop
BLD-Final10/28/201010/28/201010/28/2010PPART
DetailsDave Hannah
Jerry Phone #: ###-#### ok for temp occ ok for perm occ after other trades go perm
BLD-Final10/26/201010/27/201010/27/2010PNR
DetailsDave Hannah
Jerry Phone #: ###-#### needs other trades finaled first
FIRE-Final Inspection10/26/201010/27/201010/27/2010APASS
DetailsForrest France
Fire life safety inspection completed satisfactory. PFE and ceiling tile to be installed as discussed prior to structural final.
FIRE-Conference10/19/201010/19/201010/20/2010PDONE
DetailsForrest France
On site visit with contractor regarding existing fire alarm notification appliance locations. If the system is modified an FIR permit will be required-see review notes. However, existing coverage appears adequate.
FIRE-Sprinkler Rough-in10/19/201010/19/201010/19/2010APART
DetailsForrest France
Overhead fire sprinkler work is approved for cover at the drop ceilings. Noted one upright head covered by foil- to be removed prior to final.
BLD-Conference10/18/201010/19/201010/19/2010APASS
DetailsDave Hannah
jerry Phone #: ###-####
BLD-Framing/Rough-in9/21/20109/21/20109/21/2010PPASS
DetailsDave Hannah
Jerry Phone #: ###-####
Issue PAID IN FULL permit  9/7/2010 DONE
DetailsTisha Gallop
Routing - FIRE9/1/20109/1/20109/3/2010 PASS
DetailsScott Arellano
Attached IFC comments to plans
Plan assigned to (SRZ)8/19/2010 9/3/2010 PASS
DetailsSam Zahorka
9/3/2010 14:27:59 SRZ - activity updated through activity BLDA022 from case BLD10-01899.
Case Summary (BLD)  9/3/2010 DONE
DetailsSam Zahorka
Routing - PLAN CHECK9/3/2010 9/3/2010 PASS
DetailsSam Zahorka
1st review completed  9/3/2010 FAIL
Failed Plan Check
Routing - PLAN CHECK9/3/2010 9/3/2010 PASS
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  9/3/2010 DONE
DetailsSam Zahorka
Print Occupancy Form  9/3/2010 DONE
DetailsBarbara Stitt
Permit Ready to Issue  9/3/2010 DONE
DetailsBarbara Stitt
Telephone call  9/3/2010 DONE
DetailsBarbara Stitt
Called Stan Cole and told him that permit is ready and fees due on 9-3-10 @ 4:00pm
Route to Impact Fee Review9/1/20109/7/20109/2/2010 PASS
DetailsCindy M. Gould
Tenant improvement no impact fees
Plan resubmittals received  9/2/2010 DONE
DetailsTisha Gallop
received transmittal and two copes of plan sheets A0.1, A2.1, A3.0, A3.1, A4.0; taken to Sam Zahorka
Routing - PLAN CHECK8/26/2010 9/1/2010 FAIL
DetailsSam Zahorka
Routing - PLUMBING8/25/2010 8/26/2010 PASS
DetailsBill VanDegrift
required floor drainage in the kitchen to floor sinks.
Routing - PUBLIC WORKS8/19/2010 8/25/2010 PASS
DetailsBeverly Mountain
Routing PW Environmental8/25/2010 8/25/2010 PASS
DetailsWalt Baumgartner
No grease abatement requied at this time (sandwich shop) per Terry Alber
Routing - Erosion and Sediment8/25/2010 8/25/2010 PASS
DetailsSteven Webb
ESC plan waiver is approved according to the ESC permit conditions. ESC10-00630
Routing - Addressing8/23/2010 8/23/2010 PASS
DetailsApril Wing
Pending Assignment by JCB8/18/2010 8/19/2010 DONE
DetailsJason Blais
Plan Reviewer's activity  8/19/2010 DONE
DetailsJason Blais
Emailed architect Stan Cole letting him know to contact ACHD to provide them needed documents for evaluation of any impact fees. Written verification is required to be provided to our Permit Counter prior to the building permit being issued.
Intake Approval  8/18/2010 PASS
OK to submit for permit
Plans ACCEPTED BY PLAN TECH  8/18/2010 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  8/18/2010 DONE
DetailsTisha Gallop
Application received 8/11/20108/11/2010 DONE
DetailsAlexandra L. DeYoung
Intake Approval  8/11/2010 FAIL
Missing some items.