Second Notice | | 11/20/2010 | 11/17/2010 | | DONE |
|
|
|
|
First Notice | 10/21/2010 | 10/21/2010 | 11/10/2010 | | DONE |
Mike Jordan
|
|
|
|
BLD-Final | 10/21/2010 | 10/21/2010 | 10/21/2010 | P | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 10/21/2010 | 10/21/2010 | 10/21/2010 | P | PASS |
Mike Jordan
|
|
|
Letter of compliance was issued.
|
BLD-Final | 10/20/2010 | 10/21/2010 | 10/21/2010 | A | CANC |
Mike Jordan
|
|
|
Dick Mckenna or cell ###-#### Phone #: ###-####. moved to pm.
|
FIRE-Final Inspection | 10/15/2010 | 10/18/2010 | 10/18/2010 | A | PASS |
Troy Cobbley
|
|
|
life safety passed.
|
Zoning Approval | 10/18/2010 | 10/18/2010 | 10/18/2010 | | DONE |
Sarah Schafer
|
|
|
|
FIRE-Final Inspection | 10/13/2010 | 10/14/2010 | 10/14/2010 | A | FAIL |
Troy Cobbley
|
|
|
No city approved plans on site. No inspection performed.
|
BLD-Final | 10/13/2010 | 10/13/2010 | 10/13/2010 | P | NR |
Jim Sly
|
|
|
dick - call for pass to get in Phone #: ###-#### or ###-#### Did not get required finals.......Per previous note.
|
BLD-Footing | 10/5/2010 | 10/6/2010 | 10/6/2010 | A | PASS |
Mike Jordan
|
|
|
Arthur Phone #: ###-####. Pier type footings for covered parking. Also noted to valley steel builders that life/safety, zoning and structural finals are all required.
|
Issue PAID IN FULL permit | | | 8/31/2010 | | DONE |
|
|
|
|
Route to Impact Fee Review | 8/25/2010 | 8/30/2010 | 8/30/2010 | | PASS |
Cindy M. Gould
|
|
|
Carport, no impact fees
|
Case Summary (BLD) | | | 8/30/2010 | | DONE |
Sam Zahorka
|
|
|
|
Case Summary (BLD) | | | 8/30/2010 | | DONE |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/30/2010 | | DONE |
Sam Zahorka
|
|
|
|
Inspection Record Card- Bld | | | 8/30/2010 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/30/2010 | | |
|
|
|
|
Telephone call | | | 8/30/2010 | | DONE |
|
|
|
8-30-10 called phillip permit ready and fee given
|
Plan assigned to (SRZ) | 8/12/2010 | | 8/30/2010 | | PASS |
Sam Zahorka
|
|
|
8/30/2010 09:33:41 SRZ - activity updated through activity BLDA022 from case BLD10-01911.
|
Routing - FIRE | 8/25/2010 | 8/25/2010 | 8/27/2010 | | PASS |
Scott Arellano
|
|
|
Please, see attached review
|
Telephone call | | | 8/27/2010 | | DONE |
Sam Zahorka
|
|
|
Received a telephone call from the applicant. Explained what I needed to complete my review (Dimensions on site plan from proposed carports to all existing builings, interior lot lines, and property lines). He stated he would verify in field and call me. I offered to red-line the plans for him. Plan are currently in Fire plan review.
|
Routing - PLAN CHECK | 8/27/2010 | | 8/27/2010 | | PASS |
Sam Zahorka
|
|
|
|
1st review completed | | | 8/27/2010 | | DONE |
|
|
|
Failed - Plan Check
|
Telephone call | | | 8/25/2010 | | DONE |
Sam Zahorka
|
|
|
I spoke with the Engineer Carlyle Briggs about the Engineering being re-used from a previous project and that his stamp date is from 2008. He stated he was OK with this contractor re-useing his engineering and that the structural loading/code year is still the same. I verified with him the Engineering calculations and drawings will work for a 66' X 18' Carport. He said they would and thanked me for the telephone call. SRZ
|
Routing - PLAN CHECK | 8/16/2010 | | 8/25/2010 | | FAIL |
Sam Zahorka
|
|
|
|
Routing - Erosion and Sediment | 8/13/2010 | | 8/16/2010 | | PASS |
Steven Webb
|
|
|
ESC plan waiver is approved according to the ESC permit conditions. ESC10-00617
|
Routing - PLANNING | 8/16/2010 | | 8/16/2010 | | PASS |
Sarah Schafer
|
|
|
Approved per DRH10-00031.
|
Routing - PLANNING Land Div | 8/12/2010 | | 8/13/2010 | | PASS |
Todd Tucker
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/12/2010 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 8/12/2010 | | |
|
|
|
|
Pending Assignment by JCM | 8/12/2010 | | 8/12/2010 | | BLDA |
John Menard
|
|
|
8/12/2010 15:40:45 JCM - activity updated through activity BLDA160 from case BLD10-01911.
|
Application received | | 8/12/2010 | | | |
|
|
|
|